Loading...
HomeMy WebLinkAboutTHE PLAZA @ PAVILION LANE - FDP - 37-07/A - CORRESPONDENCE -The Frederickson Group LLC Intermill Land surveying, Inc. Current Planning file #37-07A pa'-' r Q Number: 113 Created: 3/4/2008 [3/4/081 Where is irrigation tap? Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 7 Created: 12 / 13 / 2007 [2/20/081 [12/ 13/07] Please show building envelopes, footprints and setbacks on the Site Plan. Lot lines and building envelopes are shown as requested above: Number: 10 Created: 12/ 13/2007 [2 / 20/ 081 [12/ 13/07] A color key was provided on the elevations, but the shading looks pretty much the same for most of the colors on the key as well as the elevation drawings themselves. Please note the colors on the elevations with the corresponding color code. Response: The colors and the building materials on the building elevations have been designated via text and labels. After discussion at staff review on March Sth it was determined that the plans with this first round of Final Plan review are in a condition that does require a second round of review. The number of copies of the items being requested is set forth on the Revision Routing Sheet attached to this comment letter. Be sure and return all red -lined plans when you re -submit documentation. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt City Planner cc: Marc Virata, City Engineering Dana Leavitt, City Environmental Planner Spirit Hospitality LLC Shear Engineering Corp. Pa,e 8 [2/24/081 What is the widened street section for on Pavilion Lane (the transition just west of the #3 building)? Number: 105 Created: 2/24/2008 [2/24/081 Verify the sight distance from the Pavilion Lane access back to the west. If it may overlap into landscaping please provide a sight distance easement on that area. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Detention Pond Number: 109 Created: 3/4/2008 [3/4/08] If a blue grass irrigated pond is contemplated then a pan would be needed. For water quality purposes a non irrigated wetland grass mix would be preferred and then no pan would be needed in the pond. Topic: Utility Plans Number: 108 Created: 3/4/2008 [3/4/08] Many areas with lines over text needs some clean up. Please provide a detail for the proposed retaining wall in the detention pond. Please eliminate the gravel inlet protection shown on the erosion control plan. Use wattles instead as these are more easily maintained. Provide a sediment trap at the pond outlet. Please make sure that ditch company representatives sign the mylars prior to submission of mylars to the City. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 110 Created: 3/4/2008 [3/4/08] What is reason for the alternative sewer service for Lot 2? Number: 111 Created: 3/4/2008 [3/4/08] On Sheet 3, add the following to the appropriate notes: PVC with tracer wire NOT polywrap. PVC ---DR 18 max. Service taps made with tapping saddles. Number: 112 Created: 3/4/2008 [3/4/08] See red -lines for various minor note and dimensional changes and other comments. Page 7 requires either "Cast in Tact" (concrete) or truncated dome warning detection made out of cast iron (East Jordan Iron Works' 7005 series plates are an example). [1/15/081 Please have the access ramp on west side of the drive aisle be revised to appear as the access ramp on the east side of the drive aisle. [12/ 18/07] On the plan view of the construction drawings please show the indication of truncated dome detectable warnings on either side of the driveway out to Pavilion Lane just to sure it isn't assumed that scoring lines are needed (realizing that the truncated dome warnings are accurately reflected on the detail sheets). Number: 106 Created: 2 / 29 / 2008 [2/29/08] Please ensure that the finalized signing and striping plan for JFK, when worked out with Traffic Operations, is added as a sheet to the plan set. Topic: Site Plan Number: 107 Created: 3 / 4/ 2008 [3/4/08] The text within the "Building Data" and "Site Data" tables should be enhanced in appearance slightly to ensure that the mylar document scans well and a reproducible of the mylar doesn't lose clarity of the text, as well. See Site plan. Department: Light & Power Issue Contact: Doug Martine Topic: Utilities Number: 1 Created: 12 / 6/ 2007 [2/ 11/081 It appears that 3(?) pad type transformers will be required. These transformers are approx. 7 ft. x 5 ft., plus 3 ft. of additional clearance on 3 sides and 8 ft. on the front side. [12/6/07] The developer will need to coordinate the power requirements for each building, locations for electric transformers, and the electric development charges with Light & Power Engineering (221- 6700). The available locations for electric transformers appear to be quite limited, so prompt contact with Light & Power is encouraged. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 115 Created: 3 / 6 / 2008 [3/6/08] PFA has no additional comments or concerns. Department: Traffic Operations Issue Contact: Ward Stanford Topic: Traffic Number: 104 Created: 2 / 24/ 2008 Pane 6 [12/19/07] Show buffer line on west property line. Add note to plat "Refer to Section 3.4.1(E)(2) for allowable uses within a natural area buffer." Department: Current Planning Issue Contact: Steve Olt Topic: Site Plan Number: 117 Created: 3 / 7/ 2008 [3/7/08] As a follow-up to Jenny Nuckols (Zoning) comment #7, building envelopes should be shown on the Site Plan unless the building envelopes and building footprints are one in the same. Response: Building envelopes are shown. Number: 118 Created: 3 / 7/ 2008 [3/7/08] The Owner's Certificate of Acceptance must be modified slightly. See the example attached to the comment letter. Sze- Site plan. Number: 119 Created: 3/ 7/ 2008 [3/7/08] The Site Plan must contain the Director of Planning's approval block. See the example attached to the comment letter. See Site plan. Department: Current Planning Issue Contact: Dana Leavitt Topic: Site Plan Number: 53 Created: 12/ 19/2007 [3/4/08] Revise buffer line location per red -line notes. [12/ 19/07] Add the natural area buffer line. Measure from top of embankment to edge of parking drive within property. Show the top of embankment of the Site Plan. Refer to the red -line plan for complete location of buffer line. See Site plan. Number: 84 Created: 12 / 21 / 2007 [3/4/08] [12/21/071 Add natural area buffer line to the plan. Show and label the top of embankment of the Larimer County Canal Ditch #2 on the plan. This line was identified in the field on a site visit between D. Ennis and Dana Leavitt. If the buffer line extends into the property, align with the edge of pavement on the parking lot and extend out to the maximum of 50' north and south of the parking lot. See Site plan. Department: Engineering Issue Contact: Marc Virata Topic: Construction Plans Number: 46 Created: 12/ 18/2007 [2/29/081 Please revise the newly added supplemental general note to eliminate the reference to CDOT and their use of truncated dome bricks. The City does not allow the use of truncated dome bricks and Page 5 3. See Tim's comments (attached to the comment letter) for plant notes that should be added to the Landscape Plan. See Landscape drawings. Number: 121 Created: 3 / 7/ 2008 [3/7/08] The following Landscape Assurance note must be added to Sheet LS-3 of the Landscape Plans: See Landscape drawings. All landscaping (in each phase, if phased) shall either be installed or the installation shall be secured with a letter of credit, escrow or performance bond for one hundred twenty-five (125) percent of the value of the plant materials and installation prior to the issuance of a certificate of occupancy for any building (in a phase). Department: Current Planning Issue Contact: Dana Leavitt Topic: Landscape plan Number: 59 Created: 12 / 19 / 2007 [3/4/08] Move buffer line per red -line comment. [12/19/07] Show buffer line on landscape plan. Coordinate with Site Plan. Add a ground cover level of plants within the buffer area between the parking lot and the property line. Additional plants are needed between the edge of the ditch and Lot 3. Use all native plants within the buffer zone. See Landscape drawings. Number: 60 Created: 12 / 19/ 2007 [3/4/08] Add note on plans or in notes specifically stating type of mulch within buffer area. [12/ 19/07] Use organic material within the buffer zone instead of cobble mulch. See Landsr^�e dr24 4n4 2s. Topic: Lighting Plan Number: 83 Created: 12 / 21 / 2007 [3 / 4/ 08] [12/21/071 Add schedule of fixtures to plan. Will require all lights adjacent to the natural area buffer be equipped with exterior house side shields. See Lighting drawings, Topic: Plat Number: 52 Created: 12/ 19/2007 [3/4/08] Final location of buffer line derived from Site Plan. Page 4 General comments 1. The land transfer is scheduled for April 17th. Can the DCP be scheduled prior to mylars? 2. A variance request may be needed for the Striping Plan. Ward Stanford and Marc Virata will make this determination. 3. On the Plat, the Attorney's Certification proves ownership. No title certification is required. There will be work needed in the ditch right-of-way. The ditch company must be added to the signature blocks. Department: Current Planning Issue Contact: Dana Leavitt Topic: Grading Number: 57 Created: 12/ 19/2007 [3/4/08] Use buffer line per comments on Site Plan. [12/ 19/07] Show the top of embankment and buffer line on Grading Plan. Coordinate with Site Plan. Response: The buffer line has been adder" Department: Current Planning Issue Contact: Steve Olt Topic: Landscape Plan Number: 29 Created: 12/ 18/2007 [3/7/08] Laurie is again forwarding both of the referenced documents to the applicant (attached to this comment letter). [12/ 18/07] Laurie D'Audney, the City's Water Conservation Specialist, indicated that she is forwarding a Water Conservation Standards for Landscapes COMMENT SHEET and the City of Fort Collins Water Conservation Standards for LANDSCAPING and IRRIGATIONS General information to the Applicant. These items are attached to this comment letter. See Landscape drawings. Number: 120 Created: 3 / 7/ 2008 [3/7/08] Per the City Forester's (Tim Buchanan) comments: 1. Swamp White Oak does not survive in Fort Collins soils. Change these 2 trees to Chinkapin Oak, Quercus muehlenbergii. See Landscape drawings. 2. Autumn Purple Ash is not an approved Street Tree in the City of Fort Collins. Change to Skyline Honeylocust or another approved Street Tree (see attached Street Tree List). See Landscape drawings. Page 3 1. Show the buffer to the extent possible at the 50' mark on all plan sets. Response: The buffer is noted. 2. There should be a 15 - 25% increase in quantities of plantings in the buffer zone. Response: See attached landscape plans. 3. Add Environmental Planner to signature blocks in the plan set. Response: The signature block was added and then removed in accordance with the 03/05/08 meeting. 4. No rock in the buffer area. It should be as natural, organic as possible. Response: The stone has been changed to mulch. NOTE: ALL ITEMS SHOWN IN "BLUE' HAVE BEEN SUBMITTED AND ACCEPTED IN FINAL SIGNED MYLAR FORM. Stormwater (Basil Hamdan) 1. No pan is necessary in the detention pond if it is wetland -like. A pan is required if it has a manicured treatment (irrigated landscape). 2. There are line / text issues on the grading plan. Basil wants to see this plan before a mylar is submitted. Other than that, Stormwater is ready for mylars. Engineering (Sheri Langenberger, for Marc Virata) 1. CDOT dome brick reference note needs to be removed or revised per the comment letter. 2. A Signing / Striping Plan needs to be added to the plan set. Light & Power (Rob Irish) 1. Contact Doug Martine to coordinate transformer locations. 2. C-1 Forms must be filled out. 3. The applicant may request a utility coordination meeting. Water / Wastewater (Basil Hamdan, for Roger Buffington) 1. Is there alternate sewer service for the long building? Investigate shorter services with less depth. 2. Show an irrigation tap for landscaping. Pace 2 i STAFF PROJECT REVIEW City of Fort Collins RESPONSE Ennis Associates Date: 3/ 10/2008 c/o Don Ennis 13994 Turnberry Court Broomfield, CO 80023 Staff has reviewed your submittal for PLAZA AT PAVILION LANE - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Building Plans Number: 62 Created: 12/ 19/2007 [3/7/08] I'm not sure what "by poche designation" means. Based on the Legends, it still is unclear on the Building Elevations what the materials are. [12/19/071 Identify the various materials on the building plans. Response: The colors and the building materials on the building elevations have been designated via text and labels. Topic: General Number: 31 Created: 12/ 18/2007 [3/7/08] Bonnie Ham indicated that the mailbox locations are being discussed (see attached Comment Sheet). [12/ 18/07] Bonnie Ham of the U.S. Postal Service indicated that the Developer is responsible for providing mailboxes) for businesses. The preferred location is on Pavilion Lane close to the entrance to the site. Please contact Bonnie at 214-3668 (cell). Response: A letter approving the location of the mail boxes from Bonnie Ham is attached. Number: 116 Created: 3 / 7/ 2008 [3/7/08] Megan Harrity of the Larimer County Assessor's Office indicated that the current owner of record for this property is Goodwill Industries of Denver. She can be reached at 498-7065 is you have any need to contact her. Acknowledged Number: 122 Created: 3 / 7/ 2008 [3/7/08] The following comments were expressed by City staff at the staff & applicant project review meeting on Wednesday, March 5th: Environmental Planner (Dana Leavitt) Page I