HomeMy WebLinkAboutTHE PLAZA @ PAVILION LANE - FDP - 37-07/A - CORRESPONDENCE - UTILITY PLANSNumber: 106 Created: 2/29/2008
12/29/083 Please ensure that the finalized signing and striping plan for JFK,
when worked out with Traffic Operations, is added as a sheet to the plan set.
Topic: Site P/an
Number: 107 Created: 3/4/2008
[3/4/08] The text within the "Building Data" and "Site Data" tables should be
enhanced in appearance slightly to ensure that the mylar document scans well
and reproducibles of the mylar doesn't lose clarity of the text as well.
Department: Light & Power issues Contact: Doug Martin
Topic: Utilities
Number:I Created: 12/6/2007
[2/11/08] It appears that 3(?) pad type transformers will be required. These
transformers are approx. 7 ft. x 5 ft- plus 3 ft. of additional clearance on 3
sides end 8 ft_ on the front side.
[12/6/073 The developer will need to coordinate the power requirements for
each building, locations for electric transformers, and the electric development
charges with Light d Power Engineering (221-6700), The available locations for
electric transformers appear to be quite limited, so prompt contact with Light
,& Power is encouraged.
Department: Traffic Operations
Topic: TrofPic
Number: 104
[2/24/08] What is the widened street
just west of the t*3 building)?
=slue Contact: Ward Stanford
Created: 2/24/2008
section for an Pavilion (the transition
Number: 105 Created: 2/24/2008
[2/24/08] Verity the sight distance from the Pavilion access back to the west.
If it may overlap into landscaping please provide a sight distance easement on
that area.
Department: Stormwater- Water -Wastewater Issue
Contact: Basil "amdan
Topic: Defention Pond
Number: 109 Created: 3/4/2008
Steve Olt -Shear Project No: 1592-07-07: The Plaza at Pavilion Lane (Lot 1, Goodwill I^austries of Denver Subdivision); FoP..age 2
� 1
development charges with Light and Power Engineering (221-6700). The
available locations for electric transformers appear to be quite limited, so
prompt contact with Light & Power is encouraged.
The easiest way is to start here and just pick a day and time to
work with and go from there. Of course, if you could both get together and
let me know a day and time that works for both of you.
Would you both happen to be available on Tuesday morning, April
1,2008 at 10:OOAM at the service center? This will only take an hour, if
that.
Thank you!
Brian W. Shear, P.E.
Shear Engineering Corporation
<mailto:bshear@shearengineering.com> bshear@shearengineering.com
4836 South College Avenue
Ft. Collins, Colorado 80525
(970)226-5334
CC: <BHamdan@fcgov.com>, <wgalbrecht@hotmail.com>, <FCRealtor@msn.com>,
<MR.Bill.1959@hotmail.com>, <mvirata@fcgov.com>, <don.ennis@comcast. net>, <solt@fcgov.com>,
<chesgrou p@m ai nstreet.com>
Steve Olt - Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill Ire-istries of Denver Subdivision); FoPage 1
From: 'Brian W. Shear" <bshear@shearengineering.com>
To: <dmartine@fcgov.com>, <rbuffington@fcgov.com>
Date: 3/27/2008 9:50:49 AM
Subject: Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill Industries of
Denver Subdivision); Fort Collins
Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill
Industries of Denver Subdivision); Fort Collins
Client: P.A. Investments, LLP
Doug Martine,
dmartine@fcgov.com
Roger Buffington,
rbuffington@fcgov.com
I would like sit down with both of you to review our final utility
plan revisions for The Plaza at Pavilion Lane. Our schedule is to start
sitework construction on April 18, 2008. We are arranging our DCP permit
with Marc Virata now. We will be submitting mylars the second week in April.
The first building going in will be the Candlewood Suites hotel. We
anticipate submitting for building permit before the end of April. We just
want to coordinate transformer locations now and get those on the plans now.
The coordination of water and sewer appurtenances with Power and Light
transformers and other appurtenances will be our main coordination effort
based on our experience with other hotel projects. So we are not doing a
formal "Utility coordination meeting" with all parties. We have a builder
for the hotel and he will be present in our coordination meeting. One of our
goals will be to fill out the Light and Power forms as required.
The Light and Power comments from the latest City review comments provided
in a letter from Steve Olt dated 03/05/2008 note Doug Martine as the contact
with the following comments (also see attachment):
Number: 1
Created 12/06/2007
(02/11/08) It appears that 3 (?) pad type transformers will be required.
These transformers are approx. 7 ft. x 5 ft., plus 3 ft. of additional
clearance on 3 sides and 8 ft. on the front side.
(12106/07) The developer will need to coordinate the power requirements for
each building, locations for electric transformers, and the electric