HomeMy WebLinkAboutTHE PLAZA @ PAVILION LANE - FDP - 37-07/A - CORRESPONDENCE - UTILITY PLANSNumber: 106 Created: 2/29/2008 12/29/083 Please ensure that the finalized signing and striping plan for JFK, when worked out with Traffic Operations, is added as a sheet to the plan set. Topic: Site P/an Number: 107 Created: 3/4/2008 [3/4/08] The text within the "Building Data" and "Site Data" tables should be enhanced in appearance slightly to ensure that the mylar document scans well and reproducibles of the mylar doesn't lose clarity of the text as well. Department: Light & Power issues Contact: Doug Martin Topic: Utilities Number:I Created: 12/6/2007 [2/11/08] It appears that 3(?) pad type transformers will be required. These transformers are approx. 7 ft. x 5 ft- plus 3 ft. of additional clearance on 3 sides end 8 ft_ on the front side. [12/6/073 The developer will need to coordinate the power requirements for each building, locations for electric transformers, and the electric development charges with Light d Power Engineering (221-6700), The available locations for electric transformers appear to be quite limited, so prompt contact with Light ,& Power is encouraged. Department: Traffic Operations Topic: TrofPic Number: 104 [2/24/08] What is the widened street just west of the t*3 building)? =slue Contact: Ward Stanford Created: 2/24/2008 section for an Pavilion (the transition Number: 105 Created: 2/24/2008 [2/24/08] Verity the sight distance from the Pavilion access back to the west. If it may overlap into landscaping please provide a sight distance easement on that area. Department: Stormwater- Water -Wastewater Issue Contact: Basil "amdan Topic: Defention Pond Number: 109 Created: 3/4/2008 Steve Olt -Shear Project No: 1592-07-07: The Plaza at Pavilion Lane (Lot 1, Goodwill I^austries of Denver Subdivision); FoP..age 2 � 1 development charges with Light and Power Engineering (221-6700). The available locations for electric transformers appear to be quite limited, so prompt contact with Light & Power is encouraged. The easiest way is to start here and just pick a day and time to work with and go from there. Of course, if you could both get together and let me know a day and time that works for both of you. Would you both happen to be available on Tuesday morning, April 1,2008 at 10:OOAM at the service center? This will only take an hour, if that. Thank you! Brian W. Shear, P.E. Shear Engineering Corporation <mailto:bshear@shearengineering.com> bshear@shearengineering.com 4836 South College Avenue Ft. Collins, Colorado 80525 (970)226-5334 CC: <BHamdan@fcgov.com>, <wgalbrecht@hotmail.com>, <FCRealtor@msn.com>, <MR.Bill.1959@hotmail.com>, <mvirata@fcgov.com>, <don.ennis@comcast. net>, <solt@fcgov.com>, <chesgrou p@m ai nstreet.com> Steve Olt - Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill Ire-istries of Denver Subdivision); FoPage 1 From: 'Brian W. Shear" <bshear@shearengineering.com> To: <dmartine@fcgov.com>, <rbuffington@fcgov.com> Date: 3/27/2008 9:50:49 AM Subject: Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill Industries of Denver Subdivision); Fort Collins Shear Project No: 1592-07-07; The Plaza at Pavilion Lane (Lot 1, Goodwill Industries of Denver Subdivision); Fort Collins Client: P.A. Investments, LLP Doug Martine, dmartine@fcgov.com Roger Buffington, rbuffington@fcgov.com I would like sit down with both of you to review our final utility plan revisions for The Plaza at Pavilion Lane. Our schedule is to start sitework construction on April 18, 2008. We are arranging our DCP permit with Marc Virata now. We will be submitting mylars the second week in April. The first building going in will be the Candlewood Suites hotel. We anticipate submitting for building permit before the end of April. We just want to coordinate transformer locations now and get those on the plans now. The coordination of water and sewer appurtenances with Power and Light transformers and other appurtenances will be our main coordination effort based on our experience with other hotel projects. So we are not doing a formal "Utility coordination meeting" with all parties. We have a builder for the hotel and he will be present in our coordination meeting. One of our goals will be to fill out the Light and Power forms as required. The Light and Power comments from the latest City review comments provided in a letter from Steve Olt dated 03/05/2008 note Doug Martine as the contact with the following comments (also see attachment): Number: 1 Created 12/06/2007 (02/11/08) It appears that 3 (?) pad type transformers will be required. These transformers are approx. 7 ft. x 5 ft., plus 3 ft. of additional clearance on 3 sides and 8 ft. on the front side. (12106/07) The developer will need to coordinate the power requirements for each building, locations for electric transformers, and the electric