LIBERTY FARMS - PDP - 31-06A - CORRESPONDENCE - (3)
[11161071 The City's 24-inch main in Timberline is cathodically protected. Show the CP test stations on the plans and add notes to protect in place or if re -location is required, contact City Water Utilities (221-6700).. CP test station locations are shown on the Existing Conditions Plan. Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number.- 139 Created. 111812007 [1118107] No comments Thanks! Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Shelby Sommer Associate City Planner Page 14 [11161071 The storm drain lines in Chenyhurst seem to be too close to the existing buildings. Please provide a minimum of 10 feet of clearance from building. The storm line has been moved to the south to provide 10 feet of clearance from the building. The outfall storm sewer from the detention pond is partially located in the parkway strip, check with Electric utilities for potential conflict. Per conversation with Doug Martine of Fort Collins Light & Power, he has seen the locations of the storm lines and manholes and has no issues with the current layout See his Comment Number 87 above. Avoid crossing lines in roundabout, if possible. Because utility manholes are prohibited in the center islands of roundabouts, crossing utility lines at this intersection are unavoidable. The crossing storm lines are at sufficiently different elevations to avoid conflicts. Pond outfall storm line is about 20 feet deep, how will construction of this line be done, and has an overburden analysis been done? Please provide one. A 20' deep installation, while not simple as one at 8' deep can be done safely and is the responsibility of the construction contractor. It is the desire of both the City, the design engineer and the owner to outfall storm water to the master planned 247cfs conveyance. If this outfall is available at a later date prior to construction, the plans can be modified Department: Stormwater-Water-Wastewaterissue Contact: Roger Buffington Topic: Water/Wastewater Number. 67 Created: 813112007 [11161071 (Repeat comment. Add labeling to existing conditions sheet and overall utility plan.) [8131107] Label size and owner of each water main in Timberline. Water main size and owner labels have been added to the Existing Conditions Plan and the Overall Utility Plan. Number. 99 Created: 111612007 [11161071 On Sheet 2 of 34 under Water Line Notes, the coordination on water services should be with the ELCO Water District. All water construction notes have been updated to refer to ELCO Water District. Number.- 104 Created. 111612007 [11161071 The City water main in Timberline is 24-inch NOT 16-inch. The note has been updated. Number. • 106 Created: 111612007 Page 13 Department: Stormwater-Water-Wastewaterlssue Contact: Basil Hamdan Topic: Ditch company approval Number 131 Created: 11/6/2007 [11161071 Letter from ditch company received. Final approval from ditch company needed at final. We expect these plans to be routed to ditch company for their review and approval. Please identify low point in ditch where any potential ditch overflow would happen. There does not appear to be a specific low point where the ditch would overflow onto the property. An swale has been added to the plans to the grading to intercept any flows from the ditch. Topic: Ditch spill Number. 142 Created: 111912007 [11/9/07] The Boxelder/Cooper Slough master plan proposes a 247 cfs conveyance along the east property line that is being accommodated by reserving a 20 foot drainage easement along the east property line. In addition there is a 55 cfs spill that occurs in the existing condition from the Larimer and Weld Canal north of this property, the grading should be adjusted so that this existing spill can be conveyed safely across this site without causing any flooding of proposed uses within this site. An easement has been provided on the east edge of the site for the master planned 247 cfs conveyance. Although a specific low spot cannot be identified for the 55 cfs spill, the grading has been adjusted to provide a swale to intercept these flows and pass them through Topic: Drainage Plan Number. • 143 Created. 11/9/2007 (11/9/07j Please provide a drainage summary table. The drainage summary table has been added to the plan. There seems to be some developed areas draining undetained to the south. Please make sure all developed properties from the site are detained and only a minimal amount of area is free draining to the south at a less than historic rate. Runoff from the developed areas has been captured to its fullest extent. Some areas cannot be detained and these areas are compensated for by overdetaining in the detention pond. Topic: Grading Plan Number 133 Created.- 111612007 [11161071 Please tie in proposed grades to existing grades at the property boundaries. The grading has been revised so there is no off -site grading. Topic: Storm Drain Lines Number.' 130 Created: 111612007 Page 12 Per continuing discussions, the design is based on the currently approved Mtn Vista subarea plan, not the upcoming amendment., Number.• 145 Created: 11/1212007 [11112107] The design of the Rbt must meet LCUASS 8.2.17 Roundabouts A. Modem Rbt's 5. Design Experience, since projected volumes (Subarea plan or TIS) are greater than a minor Collector (correction to comment ID # 84, stating Mini-Rbt). The revised roundabout has been designed by an engineer with experience meeting the requirements of LCUASS 1.1.9, and meets the requirements of LCUASS 8.2.17, 8.2.18, and Appendix 1. Number. 146 Created: 1111212007 [11112107] Signing and Striping plans are needed for Timberline Rd, the Rbt, and internal streets larger than a Local Residential. A striping plan for Timberline Rd is now shown on the Plan & Profile sheets. A striping and signage plan for the Roundabout is shown on Sheet 9. Number. 147 Created: 11/12/2007 [11/12107 Ornamental trees on the NE comer of the Rbt need to be removed. Current use of ornamentals is proving to be a sight problem as their canopy is so low as to take away sight distance capabilities. These affect peds crossing east to west at the north cross walk. Please see redlines. Done. Number.' 148 Created: 1111212007 [11112107] The Shade trees shown on the east side of the south leg of the Rbt will block the view of cars and peds will have of each other. Please revise landscaping per Sight Distance criteria. Lowest portion of tree canopies used within 100' of any leg of the Rbt need to be a minimum of 8 feet from the ground. This is to provide safe sight lines for motorists, peds and Rbt approach signage. No ornamentals within that 100'. Other low landscaping elements are ok as long as they provide proper sight lines at the Rbt and the other internal intersections. Please see redlines. Done. Number. 149 Created: 1111212007 [11/12/07] Please remove the ornamental tree shown at the site access and Timberline, plus call out Shade trees that have an initial minimum canopy height that maintains City sight distance criteria. Please see redlines. Done. The Final landscape plan should now provide the expected detail. Number. 150 Created: 11/12/2007 [11/12/071 OK with modification request of Section 3.6.2. C. Thanks! Page 11 Number. 137 Created: 11/7/2007 [1117107] Missing lot dimensions between Lot 10 and Outlot A. The dimensions have been added as needed to the plat. Department: Light & Power. Issue Contact: Doug Martine Topic: Electric Utility Number. • 87 Created: 10/29/2007 [10129107] No comments for the second round of review. Thanks! Department: Traffic Operations Issue Contact: Ward Stanford Topic: Traffic Number.' 80 Created: 911512007 [11/12/071 Still not shown on Timberline P&P sheet, or I can not make it out on the Plan. Just for clarity, I'm referring to the southbound left tum lane for the site access, not Timberline and Vine. [9115107] Per LCUASS Fig 8-1, a southbound left tum lane must be provided on Timberline. A southbound left turn from Timberline onto Cherryhurst is now provided on the plans. See new striping plan for Timberline. Number. 84 Created: 911512007 [11/12/071 October 26 submittal did not provide requested Rbt details. A Plan view is provided but no 'or few dimensions. [9115107] Need to provide all LCUASS data for mini -roundabouts, plus full dimensions of interior island, truck apron, inscribed radius, lane widths (circulating and approach), ped crossing widths, splitter island, landscaping in and around Rbt, and any other pertinent design data. Drawings now show dimensions of the interior island, widths for the truck apron, inscribed radius, circulating and approach lane widths, pedestrian refuge widths, and pedestrian crossing setbacks. See Drawing Sheets 7 & 9 for layout, line and curve tables, and dimensioning. See Landscape Drawings for landscaping in and around the roundabout. Number 86 Created: 911512007 [11/12/07] Applicant replied it would be supplied separately with the Rbt design cak's. [9115107] Please provide fastest path info indicating the expected cirqulating speed of the Rbt. Eric Bracke will provide directly to Ward by February 6. Number.: 144 Created: 11/12t2007 [111121071 Proposed Mtn Vista SubArea Plan removes the minor arterial on this site, but provides nothing further. Will need to discuss with Planning to determine roadway expectations in this area. Page 10 [1116107] Please show and call out the inlet at STA 14+16.24 on the Cheryhurst profile. See redlines for additional comments on Cheryhurst design. Need to define in the profile what is being constructed, where the boundary is and what is preliminary off -site design. Show preliminary street designs in plan view as well. The inlets at Cherryhurst Sta 14+18 and at Sta 21 +08 are now shown and called out in the profiles. All design comments on the Cherryhurst redlines have been addressed. The profile is now clearly labeled to delineate project design and preliminary offsite design. Preliminary street design is now shown in the plan view. Number. 128 Created: 111612007 [1116107] Please provide type 11 barricades at the east end of Cherryhurst sidewalks. Barricades have been provided at the end of all sidewalks, generally at the property boundaries. Number. 129 Created: 11/6/2007 [1116107] Similar comments for Collamer design sheets. See redlines for clarification. There is a single point grade break on the Collamer design at STA 23+67.68 that is slightly over the 0.4 percent max. Use a series of grade breaks or vertical curve at this location to meet the standard. All design comments on the Collamer redlines have been addressed. The profile is now clearly labeled to delineate project design and preliminary offsite design. Preliminary street design is now shown in the plan view. A vertical curve has been added to correct the grade break at Sta 23+67. Number. 132 Created: 11/6/2007 [1116107] The T-intersection on sheet 30 is missing some information. Please provide elevations and dimensions per LCUASS 7-27. See redlines for clarification. Spot elevations and slopes are provided as required by LCUASS 7-27. Note that no crown transition is required on Cherryhurst at this intersection because Cherryhurst is designed with a 2% grade, the same as the crown on Timberline. Topic: Technical services Number. 135 Created: 11/7/2007 [11/7/071 Need to describe/locate the natural area buffer line on the Plat. The natural area buffer line has been added to and labeled on the plat Number. 136 Created. 11r//2007 [1117107] Please provide more info regarding the book & page references on Timberline on the Plat. Can a street be built over these? The book and page references at the northwest corner of the site at Timberline have been labeled on the plat. These are for existing waterline anode and test station. This will be compatible with the intended fight -of -way dedication and street/sidewalk uses in this area Page 9 [1116107] Timberline - Please show how the ultimate Timberline section in front of this project will transition back to existing Timberline to the north and the south. These transitions should also be reflected in the profile. The plan view now clearly shows the transitions to Timberline Road north and south of the project. A striping plan has been included to further clarify the transitions. Number. 121 Created: 111612007 j11161071 Timberline - What is being shown in the profile is not fully shown in plan view. Profile goes from STA 17+00 to 40+00, plan view from 18+00 to 34+00. Both should match. The Timberline Road profile has been expanded onto two sheets and the plan and profile now show the same extents. Number. 122 Created: 111612007 [1116107] Timberline - Need to barricade dead-end sidewalks at north and south ends. Barricades have been added to all dead-end sidewalks. Number.• 123 Created. 111612007 [1116107] Timberline - Use directional ramps at the intersection - do not cross over Timberline. See redlines for additional comments related to labeling & drafting. Directional ramps are shown at the Timberline intersection. No ramps are shown for crossing Timberline. Number.' 124 Created. 111612007 [1116107] Cross sections of Timberline do not show tying back into existing pavement on the west side in several sections. All new paving must tie back into the existing grades. See redlines for clarification. The cross sections have been corrected. Number 125 Created: 111612007 [1116107] Add a signature block to sheet 23. Fix line over text and mash text. Would be preferred to place all typical section info (cross slopes, dimensions etc...) on the top left cross section and label as typical. Signature blocks have been added to all cross-section sheets. Typical section information has been moved to the first cross-section on the sheet. Number. 126 Created: 111612007 [1116107] Grades need to tie back into existing or proposed grades on the east side in STA 31+21.72 to STA 30+50 The cross sections have been corrected. Number.• 127 Created. 111612007 Page 8 see the final design and receive a comment letter from Boxelder prior to scheduling a hearing. This requirement was satisfied prior to the P&Z hearing. Number., 115 Created: 111612007 [1116107] Please provide dimensioning in the storm drain profiles to verify minimum pipe clearance is being provided under the street section and in the drainage easements. Dimensioning has been added to show the provided pipe clearance under street sections. A concrete slab section of pavement has been added where less than the minimum amount of cover is provided. Number.- 116 Created. 11/6/2007 [11161071 Please label all of the storm drain lines (i.e. Line 1, Line 2 etc..) in the plan view on the Stone Sewer design sheets. Storm drain lines have been labeled in the plan view on the design sheets. Number. 117 Created: 111612007 [11161071 Timberline - Please show adequate information for existing Timberline to verify that it qualifies as IMPROVED per LCUASS 1.9.2.B.3 ©. Show the existing pavement width from the project site to Vine Drive and provide one cross section indicating the existing pavement & base section which must be sufficient to meet the ultimate design pavement section requirements for the 4-1ane arterial standard. If it does not meet the requirements of the above referenced LCUASS section then Timberline will need to be improved as well to Vine Dr. As established prior to the public hearing, Timberline does qualify as IMPROVED, per LCUASS 1.9.2.B.3. Number. 118 Created: 111612007 [1116107] Timberline - Timberline preliminary design also needs to extend 1000 feet to the north of the site and a preliminary design of the canal crossing to ultimate width must be provided. Preliminary design of Timberline, from Vine Drive to Mountian Vista Drive was done on the approved plans for Waterfield; this profile is shown on the Liberty Farms plans. The Timberline profile now extends 1000 feet north of the site. A plan view detail showing Timberline at ultimate width over the canal and a preliminary canal crossing has been added. Number. 119 Created. 111612007 [1116107] Timberline - Please clearly indicate in the profile what is proposed to be constructed with this project and what is preliminary design. The profile labeling has been added. Number: 120 Created. 111612007 Page 7 cyclists out of the roadway at the roundabout, report and software requirements etc... The design was originally planned to be a large mini -roundabout Now that the determination has been made that this roundabout shall be designed as a modem roundabout, an engineer has been contracted that meets the experience requirement by with the City. The roundabout is now entirely in concrete, with a truck apron on the center island. Pedestrian refuge areas are now 7' wide, and a minimum of 25' from the yield line. Bike ramps are optional but have been included in the revised plans. Number. 108 Created. 111612007 [1116107] The north leg of the roundabout should be barricaded at the radius such that vehicles cannot leave the roundabout at this leg and have no way of exiting without backing up. You may also pave beyond the splitter island to allow vehicles to tum around. The barricades have been moved to the edge of the roundabout so that vehicles will cannot leave the roundabout at this leg.. Number. 109 Created: 111612007 [1116107] The grading plans show proposed contours going off -site to tie into existing grades on the north side near the canal. Please revise the grading to remain on -site or you will need a temp. construction easement for grading off -site. The grading has been revised to eliminate off -site grading. Number: 110 Created: 11/6/2007 [1116107] At the northwest comer of the site, you will need to provide a swale flowline around the building (see redlines). No concentrated flows can discharge . over the sidewalk so a curb chase drain may be needed to convey this drainage to the gutter. The grading on the site has been revised to address drainage issues. Where concentrated flows need to cross sidewalks, sidewalk culverts are provided. Number: 112 Created. 111612007 [1116107] The northeast area of the site near the pond cannot all drain into the parking lot area and then over the sidewalk in the driveway. You will need to tie into the storm drain with an inlet in the parking lot or provide an adequately sized curb chase drain under the sidewalk to convey the drainage to the gutter. The previous plans were missing a note indicating a 2' curb cut in the southeast corner of the parking lot. This provides for surface drainage into Pond 10. Number. 114 Created. 111612007 [1116107] A letter was received from Boxelder Sanitation District regarding the sewer connections. It appears other options may be considered since upsizing of the existing pipe would be needed for future development volumes. The City will need to Page 6 [1116107] There are still many line over text conflicts. Please mask text in hatched or grids so that it can be easily read and will scan and copy well. [8127107] Please fix line over text and labeling throughout the plan set to comply with the LCUASS Appendix E scannability requirements. See redlines for clarification. The conflicts have been addressed. Number.- 100 Created: 111612007 [1116107] Tracts A, 8 & D should be dedicated as Emergency Access Easements as well. Please revise the Plat notes and Tract Table on the Plat cover sheet. The tracts have been properly labeled and the table on the Plat cover sheet is correct. Note that only parts of the tracts, not the whole tracts, have Emergency Access Easements. Number. 101 Created: 111612007 [11161071 Please remove all mid block pedestrian crossings from the plans. Ramps should be directional and only cross public streets at the intersections. Done. Number 102 Created. 111612007 [11161071 Where parked cars have the potential to overhang attached walks, the walks need to be widened by one foot. The attached walks adjacent to the parking areas need to be 6' minimum. See redlines for clarification. The sidewalk widths were mislabeled and did not include the curb. The sidewalks, with curb, are all at least 6' wide. Number. 103 Created. 111612007 [1116107] Please label private drives with E.A.E. rather than Fire Lane to be consistent with the Plat. Private drive labels have been. changed from "Fire Lane" to "Emergency Access Easement." Number 105 Created. 111612007 [11161071 Please add dimensioning to the Horizontal Control Plan sheets as indicated on the redlines. Dimensioning has been added per the redlines. Number- 107 Created: 111612007 [1116107] The roundabout design needs to comply with LCUASS standards Appendix / requirements.. Please see the redline comments related to: Designer experience, roundabout shall be entirely in concrete, ped refuge areas need to be a min. of 7 feet wide openings in the median island, center of roundabout designed as a truck apron, Lane widths, separate bicycle ramps need to be provided to get Page 5 Topic: Water/Wastewater Number: 90 Created: 111512007 [1115107] Randy Siddens (Boxelder Sanitation District): 1. The off -site sanitary sewer connection as shown by the engineer will need to be revised as the size of this development and other anticipated future development (based on land use planning per the Mountain Vista Subarea Plan) will require a sanitary sewer of larger diameter than the existing line being connected to. Other development to the south of Vine Drive is being planned with an off -site sanitary sewer of adequate capacity to accept flow from this project and the area in general. DMW (the project engineer) has been contacted and put in touch with the engineer responsible for the off -site sanitary sewer being planned to the south. We continue to work closely with Randy at Boxelder. Randy will be finalizing the capacity requirements for the offshe load and has provided us with initial capacity requirements we have used for this submittal. 2. The District will work with the engineer on the off -site sewer design but will be unable to meet the Nov. 7 deadline for submitting comments. The District has more than adequate treatment plant capacity to serve the property referenced above. Any written agreements required to complete sanitary sewer connections to the property will be completed subsequent to the land approval process. Thanks. Number. 141 Created: 111812007 [1118107] Darwin Williams (EL CO Water District): Redline remarks were made on the utility plan and returned to the engineer. These issues have been addressed in a separate ELCO Water District comment letter and response letter from DMW Civil Engineers. Appropriate changes were made to the drawings as needed. Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number 25 Created: 812712007 [1116107] Modification requests have been submitted with alternative compliance. The modification requests are supported by Engineering. [8127107] The proposed street layout does not comply with section 3.6.3.f for street stub connections at no more than 660 feet measured along the project boundary to developable parcels. Please provide a street stub connection every 660 feet or request for modification based on justification. The modification and alternative compliance requests were approved in the December P&Z hearing. Number- 29 Created: 812712007 Page 4 Topic: Plat Number. 96 Created: 111512007 [11/5/07] Please remove the City Clerk Signature line on the Plat. The City Clerk will Stamp the plans next to the Planning and City Engineer signatures, but will not sign the plans. The City Clerk Signature line has been removed. Topic: Site Plan Number. 92 Created: 111512007 [11151071 Please dimension enhanced pedestrian crossings on site plan. They need to be 6 feet wide at a minimum. Done. Number. 93 Created. 111512007 [1115107] Bicycle parking should be located near building entrances, and preferably not in the parkway areas. l suggest that you provide a small bike rack at each building for employees and also one at or near the park. Done. Number- 94 Created. 111512007 [11/5/071 Based on the estimated floor areas on the site plan for the independent living buildings, I calculate 134,600 square feet of floor area. Are the entire buildings to be used for independent living? If so, you are over the 25% maximum for independent living. If not, please note on the plans the number of independent units plus a statement that the remainder of the building is to be used for nursinglntermediate care..... Each building containing independent living units has been identified with the allocated space specified on the plan. The use table on sheet 1 has been updated as well. Number.- 95 Created: 111512007 [11151071 The trash enclosures are interfering with the parking lot interior landscaping. Instead of so many small trash enclosures what about providing one larger, centralized trash/recycling area for each "block"? The trash enclosures have been relocated to work better with the landscape requirements in the parking lots. Number. • 134 1Created: 11/7/2007 [11/7/07] As I mentioned at the staff review meeting, you may want to consider adding loading area(s) if this campus will have a shuttle service for residents to doctors appointments, activities, etc. This is not a requirement, but most long term care facilities feature this service since many of the residents are in wheelchairs. It would be helpful to have a convenient and potentially even covered loading area since often times it takes a while to load residents on the shuttles. We've opted not to include loading areas for shuttle services in the current plans. Page 3 Fort Collins Planning has had years of experience dealing with the Larimer & Weld system facilities, so I think you are very familiar with how we operate and work together, both with planning staff and the developer. The current plans show an ELCO waterline crossing the ditch. We have reviewed this crossing with both ELCO and the ditch company. We have confirmation that even though the existing ditch crossing agreement is fairly old it will suffice for the requested crossing. The design shown does meet the requirements of this agreement. Topic: General Number.- 88 Created.- 1013012007 [10130107] The following departments/agencies have no further comments or concerns: Water Conservation, Post Office, GIS Thanks! Number 89 Created. 1013012007 [10130107] Don Kapperman (Comcast): The closest Comcast facilities are located at the Timberline and East Vine Dr. intersection. Understood. Department: Current Planning Issue Contact: Dana Leavitt Topic: General Number. 138 Created. 111712007 [11/7/071 Add Limits -of -Development line to the final plans. Done. Limits -of -Development are the same as the property line. Topic: Grading Plan Number. 66 1 Created. • 8129/2007 [1117107] Missing. Add to General Notes sheet not Grading Plan. [81291071 Add Tree Protection notes to the plan. Done. Topic: Landscape Plan Number.- 64 [1117107] Oops, still missing. [8129107] Provide a plant list area buffer. Done. Created: 812912007 Native plant species will be required within the natural Department: Current Planning Issue Contact: Shelby Sommer Topic: Lighting Plan Number- 97 Created. 111512007 [1115107] Please specify colors of wall and pole mount luminaries. Done. Page 2 aSTAFF PROJECT REVIEW City of Fort Collins DON TILLER Date: 11/12/2007 2121 Midpoint Dr., Suite 302 FT COLLINS, CO 80525 Staff has reviewed your submittal for LIBERTY FARMS PDP - TYPE ll, and we offer the following comments: Response to Comments embedded. ISSUES: Department: Current Planning Issue Contact: Shelby Sommer Topic: Building Elevations Number.• 111 Created. 11/6/2007 [11161071 Division 4.5(E)(2)(e) states that no building footprint shall exceed a total of 20, 000 square feet. This plan is in compliance with this section, but be aware that many of the buildings identified on the site plan with a total floor area of +/- 40, 000 square feet are at the MAXIMUM footprint area allowed. Maximum total floor area now limited to 40,000 sf. Number- 140 Created. 11/8/2007 [1118107] The building elevations show a maximum height of 41 feet 3 inches. All buildings over 40 feet in height are subject to Special Height Review requirements per Section 3.5.1(E). If you can reduce the height by 1 foot 3 inches you will not be required to submit information for the special height review. Maximum building height shown does not exceed 40 feet. Topic: Ditch crossing Number.- 91 Created: 11/5/2007 [1115107] Mayo Sommermeyer (Dow Law Firm for Larimer Weld Canal): The applicant and developer of the referenced project has contacted us relative to what would be our position if crossings of the ditch were needed or required. This, of course, is very difficult to look at prospectively until we have an idea of what type of crossing, its configuration, the number of crossings within an area of the ditch, as well as other factors that are relative to safety, ditch maintenance and operation. In this light, in response to the developer's request for a "Letter of Intent' relative to ditch crossings, I can only say that we have no idea what we will intend to do or not intend to do. If any crossings of our ditch are requested, we will consider them in light of the usual criteria, including safety, maintenance, operation, and other factors involving the coexistence of the irrigation ditch and surrounding urbanized development. We will then develop the criteria and specification that may be demanded for any particular crossing or other involvement with the irrigation ditch. Page 1