Loading...
HomeMy WebLinkAboutNORTH COLLEGE MARKETPLACE - WETLANDS PDP - 39-08 - CORRESPONDENCE -Page 2 of 2 Total = $9,309.75 (+ APO fee, once determined) These numbers come from 2 separate applications, being the TDRF application and the Development Review application. Both must be completed and submitted with your PDP documentation. If an Overall Development Plan is required then the total fee would increase by $1,399.00. The actual North College Marketplace PDP (shopping center) fees will be substantially more, when submitted. Steve >>> "Blaine Rappe" <bra ppe@lovela ndcommercial.com> 11/19/2008 12:16 PM >>> Steve, I wanted to confirm all the submittal fee calculations with you, see below: Project Fee $2,000 PDP Plan Review Fee $7,059.75 ($250 per acre, total is 28.239 acres) Sign Posting Fee $50 APO list TBD ($.75 per address) Total $9,147.25 Please comment, thank you. Blaine Rapp6, CCIM Loveland Commercial, LLC 1043 Eagle Drive Loveland, CO 80537 Phone (970) 667-7000 ext. 101 Fax (970) 635-2514 Cell (970) 566-4929 web: www.lovelandcommercial.com file://CADocuments and Settings\soft\Local Settings\Temp\GW}00001.HTM 11/21/2008 Page 1 of 2 Steve Olt - RE: North College Marketplace - Wetland Submittal Fees From: "Blaine Rappe"<brappe(aalovelandcommercial.com> To: "'Sheri Langenberger"' <slangenberger@fcgov.com>, "'Steve Olt"' <SOLT@fcgov.com> Date: 11/21/2008 10:09 AM Subject: RE: North College Marketplace - Wetland Submittal Fees Thank you. Blaine Rapp6, CCIM Loveland Commercial, LLC 1043 Eagle Drive Loveland, CO 80537 Phone (970) 667-7000 ext. 101 Fax (970) 635-2514 Cell (970) 566-4929 web: www.lovelandcommercial.com From: Sheri Langenberger [mailto:slangenberger@fcgov.com] Sent: Wednesday, November 19, 2008 11:02 AM To: Steve Olt; Blaine Rappe Subject: Re: North College Marketplace - Wetland Submittal Fees Assuming that the acreage number is what is on the submitted plat those numbers are correct for the TDRF PDP. If an ODP is needed the TDRF for an ODP is $500. 1 have attached a copy of the TDRF application form if you don't already have one. Sheri Sheri Langenberger, P.E. Engineering Development Review Manager City of Fort Collins, Engineering Dept 970-221-6605 >>> Steve Olt 11/19/2008 11:56 AM >>> Blaine, Re: North College Marketplace - Wetland PDP Your calculations of $2,000.00 and $7,059.75 are only for the Transportation Development Review Fees (TDRF). There is a Planning Development Review Fee to be paid and in this case it can be the Small Project Fee of $200.00 because there are no buildings in the Wetiand PDP. Assuming Engineering is OK with your calculations (they determine the TDRF), the total amount would be: Plannina ProjectFee................................................................ $ 200.00 Sign Posting Fee ..................................................... $ 50.00 APOlist fee................................................................ TBD Engineering ProjectFee............................................................ I.... $2,000.00 Size of Development ............................................... $7,059.75 - $250/acre x 28.239 acres (on subdivision plat) file://C:\Documents and Settings\colt\Local Settings\Temp\GW100001.HTM 11/21/2008