Loading...
HomeMy WebLinkAboutNORTH COLLEGE MARKETPLACE - ODP - 42-08 - CORRESPONDENCE - CORRESPONDENCE-HEARING (4)Albertson's #814 & the North College Marketplace Plan 43-08 4 - A Page 3 of 3 Cell 208-570-3780 shirley.christoffersen@albertsonsllc.com file://C:\Documents and Settings\solt\Local Settings\Temp\GW}000O1.HTM 5/14/2009 Albertson's #814 & the North College Marketplace Plan 43-08 Page 2 of 3 r � change as a part of the project being considered. However, the long range plan is for this to become a 3/4 turn so customers can turn left from College into the shopping center. ➢ The 3 entrances to our center from Willox Lane will remain. The most westerly will change from a full access to a right -in / right -out. The center Willox entry will remain a full access, but will be via a round -a -bout. If the round -a -bout were not constructed, this entry would likely be restricted to right -in / right -out rather than a full access signalized access due to it's proximity to the existing traffic signal at College and Willox. The most easterly is primarily a service entry used by trucks making deliveries to the loading dock at the rear of the store. It will remain a full access. ➢ Theoretically, the round -a -bout is designed to accommodate large semi -trucks with trailers typically used for grocery store deliveries. The design includes a 12 foot apron with only a 4 inch lip so trailers can safely trail over as they turn. Traffic planners anticipate trucks from College will travel east on Willox and turn right into the service drive at the rear of our store. ➢ Our delivery trucks can avoid the round -a -bout by traveling West on Willox to the first, or most easterly entrance into our center, driving behind the store, backing into the loading dock, and exiting to Bristlecone Drive onto College Avenue. This is a full access intersection, but traffic volume on College makes left turns from Bristlecone onto College very delayed. The Long Range Traffic Plan calls out a traffic signal at this intersection when the established state highway criterion for traffic interruption along the corridor is met. ➢ The road construction is scheduled to begin in the Spring of 2010 and complete in Early Fall of 2010. Albertson's would like planners to consider accelerating the conversion of the Albertson's shopping center main access from College from a right -in / right -out to a 3/4 entry so customers from the north can make a left turn into the center. Albertson's would like installation of a traffic signal at Bristlecone and College to be accelerated primarily to facilitate more efficient truck traffic flow and avoid truck traffic thru residential neighborhoods. Albertson's would like to be assured that during the construction of this project, communication with our Store Director, Bob Pfankuch, will be frequent and complete. We ask that construction be staged so that our customers always have at least one way to enter and exit from College and simultaneously that they have one way to enter and exit from Willox. We ask that variable message boards direct our customers safely and as conveniently as possible to detours. Shirfey Chrirtoffersen Albertsons LLC Office 208-395-5778 file:HC:\Documents and Settings\solt\Local Settings\Temp\GW}0000l.HTM 5/14/2009 Albertson's #814 & the North College Marketplace Plan 43-08 i Pagel of 3 Steve Olt - Albertson's #814 & the North College Marketplace Plan 43-08 From: "Shirley Christoffersen" <Shirley.Christoffersen@albertsonslla.com> To: <solt@fcgov.com> Date: 5/14/2009 11:44 AM Subject: Albertson's #814 & the North College Marketplace Plan 43-08 CCc <slangenberger@fcgov.com>, <jolson@fcgov.com>, <Barrylewis62@aol.com>, "Bob Butler" <Bob. Butler@albertsonsllc. com>, <Shane. dorcheus@albertsonsllc. com>, <Pat. adams@albertsonsllc. com>, <robert.pfankuch@albertsonsllc.com>, <Mike.mccarthy@albertsonsllc.com>, <Bob.banks@albertsonsllc.com>, <justin.ewing@albertsonsllc.com>, <Kbrown@klaff.com> May 14, 2009 Mr. Steve Olt Project Planner City of Fort Collins Colorado RE: North College Marketplace — Project Development Plan #43-08 Mr. Olt: This message comes to articulate questions and concerns held by Albertson's with respect to the North College Marketplace Project planned at the intersection of North College Avenue and East Willox Lane. Providing convenience for our customers is paramount to serving them. We build our stores with good access, ample parking, and good traffic flow design in order to meet this service requirement. Any decrease is actual or perceived accessibility is cause for concern and the reason for this communication. First, I summarize our understanding of the project and seek verification that if we have not misconstrued any components: ➢ Fort Collin's has a relatively new Urban Renewal Agency that is releasing Tax Increment Funds (TIF) for infrastructure enhancements to a new shopping center development at the NEC of College Avenue and Willox Lane. This decision has been made by the Fort Collins City Council following an exhaustive public hearing process. The time for protesting this decision is past and it is not reversible. ➢ College Avenue is the primary North -South arterial in Fort Collins. Many customers access our store by using the main shopping center entry off.College Avenue midway between Bristlecone Drive & Willox Lane. It is currently a right -in / right -out and this is not planned file://C:\Documents and Settings\solt\Local Settings\Temp\GW}0000l.HTM 5/14/2009