HomeMy WebLinkAboutMCCLELLANDS CREEK THIRD FILING - MAJOR AMENDMENT - FINAL PLANS - 28-09/A - CORRESPONDENCE - (3)FW: McClelland's Creek
Page 2 of 3
Also, if more than 12 months pass, the temporary second access point will be considered permanent, and we
will require that it be paved either with asphalt or concrete.
Also:
• Minimum turning radii is 25 feet inside, 50 feet outside.
• Minimum travel width on secondary access is 16 feet (our minimum is 20 feet but since this is access only
and no property to protect at this spot, decreased width is acceptable for temporary access), all-weather
surface, accommodate 40 tons, maintained unobstructed at all times (removal of snow, construction
material, vehicles, etc.).
All this information must be recorded via the City, whether it's general notes or part of a DA.
Questions? Let me know.
Carie
Carie Dann [CC Fire Inspector II/CO Firefighter II
Poudre Fire Authority
102 Remington St.
Fort Collins, CO 80524
Phone 970.219.5337
Email cdann@Poudre-fire.org
On 6/27/11 10:06 AM, "Andy Reese" <andy@northernenRineedng.com> wrote:
Hi Carie,
I hope you have gotten back from your vacation ok, and that you have managed to unbury yourself. I know we
had talked a little bit about your feelings about our relocated Emergency Vehicle Access, and about the possible
need for additional signage at the Kechter entrance, but I wanted to follow up with you to see if you had any
additional information or direction on how you would like us to proceed. I have attached the exhibit showing our
proposed location in case you need it. Please let me know if you need anything else from me in order to button
things up.
Sincerely,
Andy Reese
Project Engineer
Northern Engineering
Direct: 970.568.5403
Office:970.221.4158
a ndy @ northern a ngi n ee ri ng. c om
6/27/2011
.4
FW: McClelland's Creek
Pagel of 3
Steve Olt
From:
Carie Dann [cdann@poudre-fire.org]
Sent:
Monday, June 27, 2011 11:32 AM
To:
Marc Virata; Steve Olt
Subject:
FW: McClelland's Creek
Attachments: PFA access McClelland's 3rd.pdf
Marc and Steve,
Andy and I have discussed a couple different iterations of the required second access point for phasing of
McClelland's Creek 3rd Filing. Attached and below are PFA requirements and Andy's response. I said we can
cover either via general notes or through a DA, but we need to document our requirements.
Carie
------ Forwarded Message
From: Andy Reese <andy@northernengineering.com>
Date: Mon, 27 Jun 2011 11:12:19 -0600
To: Carie Dann <cdann@poudre-fire.org>
Subject: RE: McClelland's Creek
Carie,
Thanks for getting back to me so quickly. At first blush, this looks great. I'll pass this on to the client to make sure
there isn't anything that I am missing. Once I get the thumbs up from them, we'll adjust our plans accordingly and
process them with the city.
Thanks again!
Andy Reese
From: Carie Dann [mailto:cdann@poudre-fire.org]
Sent: Monday, June 27, 2011 11:09 AM
To: Andy Reese
Subject: Re: McClelland's Creek
Andy,
Attached is what PFA will enforce for the second access point during phasing of the project.
The change from when we talked is for the placement of two signs. At the main entrance at Kechter/Northern
Lights, PFA will require a sign that reads "2nd emergency access south on Strauss Cabin" and then at the
emergency access point on Strauss Cabin, a sign that reads "Emergency vehicles only." We won't require any
type of gate or chain at that second access point unless you have problems with private vehicles using this point
as access between the subdivision and Strauss Cabin Road.
6/27/2011