Loading...
HomeMy WebLinkAboutKAUFMAN & ROBINSON OFFICE DEVELOPMENT - PDP - 40-08 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDRAINAGE AND EROSION CONTROL REPORT Kaufman & Robinson, Inc. Evergreen Park - Replat of Lots 3 and 4, Block 5 Fort Collins, Colorado 12-November-2008 Prepared for: Basis Architecture, PC 1692 Big Thompson Avenue, Suite 100 Estes Park, Colorado 80517 Phone: 970.586.9140 Prepared by: James Blankenship, P.E. JLB Engineering Consultants 743 Pear Court Louisville, Colorado 80027 Phone: 303.604.1634 Fax: 303.604.1674 JLB Project Number: 0114