HomeMy WebLinkAboutKAUFMAN & ROBINSON OFFICE DEVELOPMENT - FDP - 40-08/A - CORRESPONDENCE - (8)Kaufman & Robinson, Inc. Response to Comments dated 04/23/2010
May 10, 2010 Pg. 4
Topic: Utilities
Number: 87 Created: 4/ 21 / 2010
[4/21/101 Please change benchmark #2 on the Utility Plans to match the cover
sheet. Benchmark 41-97 no longer exists.
Response: The benchmark has been updated.
DEPARTMENT: STORMWATER-WATER-WASTEWATER
Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 28 Created: 12/17/2008
[4/20/101 Reminder. This is needed.
[2/27/091 A letter of intent from the off -site property owner is required before a
hearing.
[12/17/081 There is currently no record of a drainage easement for the privately
owned Evergreen West detention pond. A letter from the Evergreen West
detention pond property owner stating knowledge of and permission to
construct the outfall storm sewer on this property is required. Also, please give
the owner of this property a set of utility plans for their review. Contact
information is:
Ed Zdenek
phone: 493-4105
email: Ed®zticonstruction.com
Response: The letter of intent was provided prior to the public hearing. As
discussed on April 21, 2010, no additional information is required.
Number: 76 Created: 4/20/2010
[4/20/10] Please revise water quality detail per red -lines.
Response: The detail has been revised as requested.
DEPARTMENT: STORMWATER-WATER-WASTEWATER
Issue Contact Roger Buffington (221-6854)
Topic: Water/Wastewater
Number: 75 Created: 4/20/2010
[4/20/10] If desired, PVC water main material may be used for the fire line. If
the intent is to allow PVC, add tracer wire and locator station details to the plans.
Response: Comment acknowledged. At this time, the pipe material remains
DIP.
NIVULLUNE
Consultants, Inc.
Kaufman & Robinson, Inc. Response to Comments dated 04/23/2010
May 10, 2010 Pg. 3
Number: 78 Created: 4/21/2010
[4/21/10] Please provide an enhanced walkway for connectivity from public
sidewalk to front entrance. Land Use Code section 3.5.3 discusses the
relationship of buildings to streets, walkways and parking. The proposed layout
does not have a direct pedestrian connection between the building main entrance
and public sidewalk without crossing a drive aisle. Transportation Planning is ok
with making an exception in this case as long as there is an enhancement that
demonstrates preference for pedestrians crossing the drive isle between the
building and public sidewalk. Striping is an appropriate enhancement.
Response: Striping for a pedestrian crossing has been added to the plans.
Number: 79 Created: 4/21/2010
[4/21/10] Details for pedestrian ramps are not consistent with those shown on
plans. Please include only the details that are intended to be used for
construction.
Response: Pedestrian ramp details have been added as necessary.
Number: 80 Created: 4/21/2010
[4/21/101 Please line the ADA ramp guiding pedestrians across Blue Spruce
Drive at the T-intersection to the accepting ramp on the west side of Blue Spruce
Drive. This line of travel should be perpendicular across Blue Spruce Drive.
Ensure mod block ramp is fully shown on plans. As discussed at the Staff
Review meeting, it is possible only half of this ramp is shown.
Response: The pedestrian ramp has been updated and aligned with the ramp
at the intersection.
DEPARTMENT: TECHNICAL SERVICES
Issue Contact: Jeff County
Topic: Subdivision Plat
Number: 82 Created: 4/21/2010
[4/21/101 The boundary closes.
Response: Comment acknowledged.
Number: 83 Created: 4/21/2010
[4/21/10] Please lighten the property description text on the Subdivision Plat.
(See red -lines)
Response: The text has been lightened.
p1LviLINE
Consultants, Inc.
Kaufman & Robinson, Inc. Response to Comments dated 04/23/2010
May 10, 2010 Pg. 2
Number: 74
Created: 4/19/2010
[4/19/101 I have provided both the Development Agreement Application form
and the Development Construction Permit Application with this round. As you
prepare to finalize the project fill them out and return them to me so that we can
begin work on both.
Response: Comment acknowledged. The documents will be completed and
returned.
Number: 85 Created: 4/ 21 / 2010
[4/21/10] Please add "On -Site" to all the on -site details to clearly convey which
details are for on -site improvements and which are for public improvements. See
red -lined detail sheet.
Response: "On -Site" has been added to the requested details.
DEPARTMENT: TRAFFIC OPERATIONS
Issue Contact: Joe Olson (224-6062)
Topic: Traffic
Number: 52 Created: 4/7/2009
[4/15/10] Was a variance requested and, if so, was it approved?
[5/6/09]
A variance to LCUASS standards for the driveway location can be granted with
the condition that the proposed driveway will be the only driveway serving the
site regardless of what occurs on the southern portion of the site.
Response: A variance was requested and approved.
DEPARTMENT: TRANSPORTATION PLANNING
Issue Contact: Jennifer Petrik
Topic: General
Number: 77
Created: 4/21/2010
[4/21/101 Please label Bicycle Rack on Utility and Landscape Plans.
Response: The Bicycle Rack has been labeled.
p1L ULLIN L
Consultants, Inc.
a
Kaufman & Robinson, Inc. Response to Comments dated 04/23/2010
May 10, 2010 Pg. 1
Please note the original comment is included in the response.
DEPARTMENT: CURRENT PLANNING
Issue Contact: Steve Olt
Topic: Subdivision Plat
Number: 58 Created: 4/15/2010
[4/15/10] On the Subdivision Plat, I do not see any Public Access and
Emergency Access Easements for the access driveway and parking lots. The only
required access easement is the one that the Poudre Fire Authority needs. It will
encompass the 24' - 26' wide drive aisle from the Blue Spruce Drive right-of-way
east to the east edge of the Loading area as shown on the Site Plan.
Response: Poudre Fire Authority no longer is requesting an Emergency Access
Easement as their comments/concerns have been addressed.
Number: 60 Created: 4/15/2010
[4/15/101 There are several notes on the Subdivision Plat that are illegible (see
red -lined plat).
Response: The color/screening of the notes has been corrected.
DEPARTMENT: ENGINEERING
Issue Contact: Andrew Carney
(221-6501)
Topic: General
Number: 71 Created: 4/19/2010
[4/19/10] Did Light & Power specifically request to have a signature line in the
signature block on the Utility Set?
Response: The Light & Power signature line has been removed from the
signature block.
Number: 72 Created: 4/19/2010
[4/19/10] Please add detail 701 to the utility set.
Response: Detail 701 has been added.
Number: 73 Created: 4/19/2010
[4/19/10] Please update the dates on the plat. They still read "2008'.
Response: The dates have been updated.
RIV ULLi%4 L