DATE: December 2, 2008
TO: Technical Services
PROJECT
COMMENT
SHEET
PROJECT PLANNER: Steve Olt AG
# 40-08 KAUFMAN & ROBINSON OFFICE
DEVELOPMENT PDP —TYPE I
Please return all comments to the project planner no later than
the staff review meeting:
December 17, 2008
1,e>'/'JVA,0 V G-0'5 5_
Z. MItjo2 LIA16 odE4 TENTC 5cReuAiiAJG ) 15506!5 WfT).4 5fi� }sjuq�J�ScR�� ?LR�15.
3. SucoG�s-r�� NRyn� CK1++�1�E 7-0 �&eC-E571 Pi4,e<< �ou�-rN �f�r��.
Note - Please identify your redlines for future
reference
❑ No Problems
Problems or Concerns (see below, attached, or DMS)
Name (please print) '
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other_
X Utility _Redline Utility X Landscape
City of
ort Collins �"VCurrent
Planning
PO Box 580 ' Fort Collins, CO 80522
970.221.6750 ` 970.224.6134 - fax
DATE: December 2, 2008
TO: Building Inspection
PROJECT PLANNER: Steve Olt
PROJECT
COMMENT
SHEET
# 40-08 KAUFMAN & ROBINSON OFFICE
DEVELOPMENT PDP —TYPE I
Please return all comments to the project planner no later than
the staff review meeting:
December 17, 2008
Note - Please identify your redlines for future
reference
No Problems
sF-e KT®�Pro�:x CosP�onc�s (Tee belopsattach� duo _C fc fp_0_5�upm
MEETING Pe$ WTr nD. e2. '.- . — i
3
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other_
_Utility _Redline Utility _Landscape
STEVE OLT
Planning Department, City of Ft. Collins
P.O. Box 580
Ft. Collins, Co. 80522
DEC 10 2008
Below is the U.S. Postal Service's referral response for project: #40-08
KAUFMAN AND ROBINSON OFFICE DEVELOPMENT
Referral Response
Mail Service: Centralized delivery using of a minimum of 1 centralized box units
( Type III) is required. Revise plan to show the required CBU locations as approved
by the U.S. Postal Service. In all cases the CBUs must be located in the public right
of way or a designated easement.
Be advised the responsibility of purchase and maintaining the CBUs with the
concrete pads is that of the owner/developer/builder/HOA. Prior to occupancy within
the development approved mail receptacles will be in place. Delivery Agreement will
be in place prior to any delivery of mail.
It is preferable to locate the new box next to the existing one. I will be gone after
Dec. 31 so you may want to contact the Old Town Post Office at 472-4028 for
inquiries.
Contact Bonnie Ham Growth Coordinator, U.S. Postal Service
301 E. Boardwalk, Ft. Collins, Co.,
phone # 970@25-4130,
cell # 970-214-3668,
fax # 970-225-4139.
Email Bonnie.J.Ham@usps.gov
Thank you,
Bonnie Ham
USPS Ft. Collins
City of
Fort Collins
Current
Planning
PO Box 580 ' Fort Collins, CO 80522
970.221.6750 ' 970.224.6134 - fax
DATE: December 2, 2008
TO: Post Office
PROJECT PLANNER: Steve Olt
PROJECT
COMMENT
SHEET
# 40-08 KAUFMAN & ROBINSON OFFICE
DEVELOPMENT PDP —TYPE I
Please return all. comments to the project planner no later than
the staff review meeting:
December 17, 2008
Note - Please identifv vour redlines for future
reference
❑ No Problems
Problemsor C�Cjoncerns (see below, attached, or DMS)
d&E(i�(1_'O(. Growth Coor0lnator=Bonnlo,Xam
VV __ 'USPS 301 E. Boardwalk
j Port Qo111no CO $0949-9999
Name
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
7*at Site _Drainage Report _Other_
_Utility _Redline Utility _Landscape
Number: 6 Created: 12/11/2008
[12/11/08] C(E)(3)(a)(2)).
uts a zoning district bound line located in the Blue Spruce
street right oep landscape yard needs to b provided along the front of the lot
(Section 4.2
Number: 7 11 Created: 12/11/2008
[12/11/08] Since dscape yard is re and since the street directly connects to other
districts, 30% of the building ontage needs to about the landscape yard per Sec. 4.28(E)(2)c
Number: 8 Created: 12/11/2008
[12/11/08] 6% of the interior of the parking lot needs to be in landscape islands. Please
provide the calculations.
Several issues were expressed at the staff review meeting on December 17a' that require
another round of review before the project can be scheduled for a public hearing. Red -lined
plans from City departments are included with this comment letter. Additional comments and
red -lined plans may be forthcoming. This proposal is subject to the 90-day revision re -
submittal requirement (from the date of this comment letter, being December 22, 2008)
as set forth in. Section 2.2.11(A) of the Land Use Code. The number of copies of each
document to re -submit is shown on the attached REVISION ROUTING SHEET. Be sure and
return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6341.
Yours Truly,
Ateve Olt
City's Project Planner
cc: Andrew Carney
Kaufman & Robinson, Inc.
Delta Construction
JLB Civil Engineers
Current Planning file #40-08
Page 5
Number: 17 Created: 12/ 15/2008
[12/15/081 Stormwater is ready for a hearing.
Number: 20 Created: 12/ 15/2008
[ 12/15/08] The c-factor for the site is calculated with the current site plan in mind. If
another building is planned in the future along the southern portion of the lot, the c-factor can
include this impervious area and the pond can be sized for this expansion now. This may
reduce future modifications to the detention pond and other drainage improvements that may
be needed in the future.
Number: 28 Created: 12/ 17/2008
[ 12/17/08] There is currently no record of a drainage easement for the privately owned
Evergreen West detention pond. A letter from the Evergreen West detention pond property
owner stating knowledge of and permission to construct the outfall storm sewer on this
property is required. Also, please give the owner of this property a set of utility plans for
their review. Contact information is:
Ed Zdenek
phone: 493-4105
email: Ed@zticonstruction.com
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 2 Created: 12/10/2008
[12/10/08] Show the curb stop and meter pit on the domestic water service not the fire line.
Number: 3 Created: 12/10/2008
[12/10/08] Add a thrust block at the 90-degree bend on the fire line.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number: 4 Created: 12/11/2008
[12/11/08] The project narrative states that 22 parking spaces are allowed, based on using 2
spaces/1000 sq. ft. The 2/1000 applies for "workshop and custom small industry". I need
more information as to the nature of the industrial/manufacturing use to determine if it's
"workshop and custom small industry" or "light industrial". If it's light industrial, they are
allowed a max. of .75 parking spaces per employee working in the non -office part of the
facility.
Number: 5 Created: 12/ 11 /2008
[12/11/08] Need foundation plantings in Area 8 per Sec. 3.2.1(E)(2)(d).
Page 4
f
crews or fire apparatus. A better location would be the southwest corner of the structure.
Please contact me so we can discuss.
Number: 22 Created: 12/15/2008
[12/15/08] WATER SUPPLY: I noted the location of only one fire hydrant on the utility
plan; can you include the locations of the closest fire hydrants? Fire hydrants must be the
type approved by the water district having jurisdiction and the Fire Department. Hydrant
spacing and water flow must meet minimum requirements based on type of occupancy.
Minimum flow and spacing requirements include:
-Commercial, 1,500 gpm at 20 psi residual pressure, spaced not farther than 300 feet to the
building, on 600-foot centers thereafter. These requirements may be modified if buildings are
equipped with.automatic fire sprinkler systems.
97UFC 901.2.2.2
Number: 23 Created: 12/15/2008
[12/15/08] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to be
mounted on the front of every new building equipped with a required fire sprinkler system or
fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20
Number: 24 Created: 12/15/2008
[12/15/08] EMERGENCY VEHICLE ACCESS: An Emergency Access Easement on the
plat will not likely be needed.
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: Traffic
Number: 15 Created: 12/15/2008
[12/15/08] No Comments.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffmgton
Topic: Landscape plan
Number: 1 Created: 12/ 10/2008
[12/10/08] Show water and sewer lines and provide the required utility/landscape separation
distances as noted on the redlined landscape plan.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 16 Created: 12/15/2008
[12/15/081 There is an option of using the regional pond to the east for this site's quantity
detention requirement. This would require the Developer to make some improvements to the
regional pond. These improvements may be cheaper than constructing an on -site pond and
would free up some developable land. Water quality mitigation would still be required on -
site. Some information on the improvements required is attached. Please contact me at 416-
2418 if interested in gathering more information.
Page 3
I It
[12/18/08] The driveway does not meet LCUASS standards as the traffic volume does not
warrant a high volume driveway design as shown. Please revise and provide spot elevations.
Department: Light & Power Issue Contact: Rob Irish
Topic: General
Number: 11 Created: 12/15/2008
[12/15/08] Developer will need to show proposed transformer location on the site plan and
then coordinate that location with Light & Power Engineering. Transformer pad will be
approximately Tx 5' depending on load requirements. Also, the transformer location will
need to be within 1.0' of an all weather drive -over surface. The transformer cannot be located
between the curb and the walk in the City ROW.
Number: 12 Created: 12/15/2008
[ 12/15/08] Light & Power will need a commercial service form completed for this site along
with a One -Line diagram. Please take into account the future addition when calculating your
load requirements so the transformer can be sized large enough to handle the future
expansion.
Number: 13 Created: 12/15/2008
[12/15/08] Any relocation or modification to existing electric facilities will beat the
developer's expense. Electric capacity fee and building site charges will apply to this
development.
Number: 14 Created: 12/15/2008
[12/15/08] Contact Light & Power with proposed transformer location to coordinate
placement and service to the transformer.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 18 Created: 12/15/2008
[12/15/08] FIRE LINE SIZE: Minimum fire line size for automatic fire sprinklers is 6 inches
in diameter unless hydraulic calculations can support a smaller fire line (see PFA comment 6
in staff comment letter sent to Steve Lane on Sept. 26, 2008).
Number: 19 Created: 12/15/2008
[12/15/08] ADDRESS NUMERALS: Because the two lots will become one lot, the structure
will have only one address (1324 vs. 1330 Blue Spruce Drive). Tim Varrone from City GIS
Department will work with you on this. Address numerals shall be visible from the street
fronting the property, and posted with a minimum of 6 inch numerals on a contrasting
background. (Bronze numerals on brown brick are not acceptable). 97UFC901.4.4
Number: 21 Created: 12/15/2008
[ 12/15/08] FIRE DEPARTMENT CONNECTION LOCATION: If the location showing
where the fire line enters the building is the intended location for the FDC (automatic
sprinkler connection), this FDC location will not work, because it is not accessible to fire
Page 2
F � '
f
City of Fort Collins
Basis Architecture P.C.
c/o Matthew Heiser
1692 Big Thompson Ave
Estes Park CO 80517
STAFF PROJECT REVIEW
Date: 12/22/2008
Staff has reviewed your submittal for Kaufman & Robinson Office Development PDP -
Type 1, and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: General
Number: 29
[12/18/08] No comments.
Issue Contact: Dana Leavitt
Created: 12/18/2008
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 9 Created: 12/15/2008
[12/15/08] Additional TDRF fees are due based on the current plans. Please contact me for
details. 221-6605
Number: 10 Created: 12/15/2008
[12/15/08] The title on the Plat needs to match the title of the Utility Plans. Please revise.
Number: 25 Created: 12/ 17/2008
[ 12/17/08] In Conceptual Review, it was suggested that the driveway align with Red Cedar
Circle. The current layout does not meet the required separation distances and may cause a .
safety concern for vehicles turning left out of the site and vehicles turning left from Red
Cedar. For the current layout a variance request must be submitted for review and
consideration.
Number: 26 Created: 12/17/2008
[12/17/08] The following comments are from Technical Services (See Redlines):
1) Minor scanning issues with the site and landscape plans.
2) Plat title must match utility plan title.
Number: 27 Created: 12/ 17/2008
[12/17/08] Sidewalk must align across the driveway for safety reasons. As shown it is
attached on the south side and detached on the north side. Please revise.
Number: 30
Created: 12/ 18/2008
Page 1