HomeMy WebLinkAboutKAUFMAN & ROBINSON OFFICE DEVELOPMENT - PDP - 40-08 - CORRESPONDENCE - (9)6" REVISION
C;cyof tort Coll;ns
Planning and Zoning COMMENT SHEET
PO Box 580
Fort Collins, CO 80522-0580
Fax: 970-416-2020
DATE: February 12, 2008
TO: Zoning
PROJECT PLANNER: Steve Olt
# 40-08 KAUFMAN & ROBINSON OFFICE
DEVELOPMENT PDP — TYP
2nd Round of Review
PLEASE NOTE:
Please return all comments to the project planner no later than the staff
review meeting:
February 25, 2009
Note - Please identify your redlines for future reference
No Problems
❑ Problems or Concerns (see below, attached, or DMS)
I�Vfr- 4a
Name (please print)
-(g--L)O?
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Planning and Zoning
PO Box 580
Fort Collins, CO 80522-0580
Fax: 970-416-2020
REVISION
COMMENT SHEET
DATE: February 12, 2008
TO: Technical Services
PROJECT PLANNER: Steve Olt A C
# 40-08 KAUFMAN & ROBINSON OFFICE
DEVELOPMENT PDP —TYPE I
2" d Round of Review
PLEASE NOTE:
Please return all comments to the project planner no later than the staff
l 1-ipuvVA-0-Y IfCcoses, review meeting:
2, MIA 0A Lf AJC 0V&Z 1 t ACT 5G*,.)A A1e1 /SSdCS D� S/T�GAA✓DScA0E UT1G/TyP�.4,fJS�
/�}AIP a� N)1DR,4A1r�;;/ ir. �ebruary 25, 2009
Note - Please identify your redlines for future reference
❑ No Problems
N Problems or Concerns (see below, attached, or DMS)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat tSite _Drainage Report _Other
Utility Redline Utility )LLandscape
J
cc: Andrew Carney
Kaufinan & Robinson, Inc.
Delta Construction
JLB Civil Engineers
Current Planning file #40-08
Page 5
-J
Number: 36 Created: 2/26/2009
[2/26/09] Pending final driveway location; suggest making transition from attached sidewalk
ramp (shown on plans NE of drive) to detached walk more of a natural curve transition
instead of angular. This will follow the more natural path for pedestrians and wheel chair
users.
Number: 37 Created: 2/26/2009
[2/26/09] At the T-intersection of Blue Spruce and Red Cedar, please provide an ADA ramp
to sidewalk along project property. See Larimer County Urban Area Street Standards manual.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 28 Created: 12/17/2008
[2/27/09] A letter of intent from the off -site property owner is required before a hearing.
[12/17/08] There is currently no record of a drainage easement for the privately owned
Evergreen West detention pond. A letter from the Evergreen West detention pond property
owner stating knowledge of and permission to construct the outfall storm sewer on this
property is required. Also, please give the owner of this property a set of utility plans for
their review. Contact information is:
Ed Zdenek
phone: 493-4105
email: Ed@zticonstruction.com
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 38 Created: 2/27/2009
[2/27/09] No comments at this time; however, if site layout changes, provide revised plans
for further review.
Several issues were expressed at the staff review meeting on February 251' that require
another round of review before the project can be scheduled for a public hearing. Red -lined
plans from City departments are included with this comment letter. This proposal is subject
to the 90-day revision re -submittal requirement (from the date of this comment letter,
being March 5, 2009) as set forth in Section 2.2.11(A) of the Land Use Code. The number
of copies of each document to re -submit is shown on the attached REVISION ROUTING
SHEET. Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6341.
Yours Truly,
AtevMO41t&�_
City's Project Planner
Page 4
11
Number: 30 Created: 12/18/2008
[3/2/09]
[12/18/08] The driveway does not meet LCUASS standards as the traffic volume does not
warrant a high volume driveway design as shown. Please revise and provide spot elevations.
The LCUASS standard for driveway radii for a drive of this kind is 15 feet, not the 25 feet
shown. This requirement is table 8-2 in LCUASS.
Number: 31 Created: 2/ 19/2009
[2/19/09] Please remove the proposed asphalt in the driveway to the ROW line. Asphalt is
not permitted in public ROW. I
Number: 32 Created: 2/19/2009
[2/19/09] Neither the driveway alignment nor the curb return comments from conceptual
review and the first round of review were addressed for this round of review. Also, no
variance request has been submitted for the driveway location or any proposed variance to
the driveway radii. Please refer to table 8-2 in LCUASS for curb return radii and section
1.9.4 in LCUASS for variance request requirements.
Number: 39 Created: 3/2/2009
[3/2/09] Please see the red -lines from Technical Services for their comments.
Number: 40 Created: 3/2/2009
[3/2/09] City signature block is too large - please revise
Number:41 • Created: 3/2/2009
[3/2/09] Additional comments to follow with any change in site layout or design.
Department: Light & Power Issue Contact: Justin Fields
Topic: General
Number: 33 Created: 2/25/2009
[2/25/09) No comments
Department: Transportation Planning Issue Contact: Jennifer Petrik
Topic: General
Number: 34 Created: 2/25/2009
[2/25/09] Please provide bike parking on a hard surface, in a well lighted area, convenient to
the building entrance.
Number: 35 Created: 2/25/2009
[2/25/09] Please provide an enhanced walkway for connectivity from public sidewalk to the
front entrance. The 30' required setback with landscaping would provide a space for a
continuous uninterrupted sidewalk to the building entrance.
Page 3
J
Number: 51 Created: 3/5/2009
[3/5/09] Two (2) additional trees are needed along the south side of the south tier of parking.
Also, additional shrubs are needed in this area to satisfy Sections 3.2. 1 (E)(4)(a)&(b) of the
Land Use Code.
Topic: Site Plan
Number: 43 Created: 3/4/2009
[3/4/09] Please remove the landscaping from the Site Plan. There is a separate Landscape
Plan for that purpose. Also, move the New Tree & New Shrub information from the Site Plan
to the Landscape Plan.
Number: 44 Created: 3/4/2009
[3/4/09] City staff had a lengthy discussion about the location of the entry drive into this
development. Staff would like to meet with the applicant for the purpose of looking at
alternative locations for the drive that could possibly align with one of the streets or drives to
the west, across Blue Spruce Drive.
Number: 49 Created: 3/4/2009
[3/4/09] The development to the north, with 2 separate buildings and parking between,
satisfies the direct pedestrian connectivity requirement set forth in Section 3.5.3 of the Land
Use Code. Could this development proposal be revised to satisfy the requirement?
Department: Engineering
Topic: General
Number: 10
[3/2/09]
Issue Contact: Andrew Carney
Created: 12/15/2008
[12/15/08] The title on the Plat needs to match the title of the Utility Plans. Please revise.
Number: 25 Created: 12/17/2008
[3/2/09]
[12/17/08] In Conceptual Review, it was suggested that the driveway align with Red Cedar
Circle. The current layout does not meet the required separation distances and may cause a
safety concern for vehicles turning left out of the site and vehicles turning left from Red
Cedar. For the current layout a variance request must be submitted for review and
consideration. -
Number: 26 Created: 12/ 17/2008
[3/2/09]
[12/17/08] The following comments are from Technical Services (See Redlines):
1) Minor scanning issues with the site and landscape plans.
2) Plat title must match utility plan title.
Page 2
r
City of Fod Collins
STAFF PROJECT REVIEW
Basis Architecture P.C.
c/o Matthew Heiser
1692 Big Thompson Avenue, Suite 100
Estes Park, CO 80517
Date: 3/5/2009
Staff has reviewed your submittal for Kaufman & Robinson Office Development, Project
Development Plan (PDP) - Type 1, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 50 Created: 3/5/2009
[3/5/09] The driveway location into the site requires that a variance request be submitted to
the Engineering Department for review, with the City Engineer ultimately approving or
denying the request. It cannot be processed as a modification of standard as 3) in the
MODIFICATION of STANDARDS document submitted by the applicant is requesting.
Department: Current Planning
Topic: General
Number: 29
[2/25/09] No comments.
[12/18/08] no comments.
Issue Contact: Dana Leavitt
Created: 12/18/2008
Department: Current Planning Issue Contact: Steve Olt
Topic: Landscape plan
Number: 45 Created: 3/4/2009
[3/4/09] Please label the 2 phases of the building on the plan, similar to how it's done on the
Site Plan.
Number: 46 Created: 3/4/2009
[3/4/09] Please identify the parking spaces on the Landscape Plan by showing the lines
between spaces.
Number: 47 Created: 3/4/2009
[3/4/09] There are standard notes that must be shown on Landscape Plans. An example plan
is being forwarded to the applicant.
Number: 48 Created: 3/4/2009
[3/4/09] A standard Plant List would be more appropriate than the Tree and Shrub Inventory
as shown. An example plan is being forwarded to the applicant.
Page I
Page 1 of l
From: Steve Olt
To: matthew_heisera@basisarchitecture.com
Date: 3/5/2009 12:03 PM
Subject Kaufman & Robinson comments
Matthew,
Attached is the staff comment letter for the Kaufman & Robinson Office Development, Project Development Plan
that was discussed at staff review on February 25, 2009. The hard copy of the letter and red -lined plans can be
picked up at the Development Review Center pick-up counter at 281 North College Avenue.
Steve Olt,
Project Planner