Loading...
HomeMy WebLinkAboutKAUFMAN & ROBINSON OFFICE DEVELOPMENT - FDP - 40-08/A - CORRESPONDENCE - (6)Kaufman & Robinson, Inc. Response to Comments dated 05/13/2009 March 23, 2010 Pg. 2 DEPARTMENT: TRAFFIC OPERATIONS Issue Contact: Joe Olson (224-6062) Topic: Traffic Number: 52 Created: 4/ 7/ 2009 [5/ 6/ 09] A variance to LCUASS standards for the driveway location can be granted with the condition that the proposed driveway will be the only driveway serving the site regardless of what occurs on the southern portion of the site. Response: Comment acknowledged. DEPARTMENT: STORMWATER-WATER-WASTEWATER Issue Contact: Roger Buffington (221-6854) Topic: Water/Wastewater Number: 56 Created: 5/ 5/ 2009 [5/5/09] Provide additional information to determine if there will be a conflict between the existing sanitary sewer and the fire line. Response: The contractor shall pothole the existing water line prior to construction and additional notes have been added to the plans regarding the existing sanitary sewer line and proposed fire line. C'oxst�ltaz7ts, Inc. Kaufman & Robinson, Inc. Response to Comments dated 05/13/2009 March 23, 2010 Pg. 1 Please note the original comment is included in the response. DEPARTMENT: ENGINEERING Issue Contact: Andrew Carney (221-6501) Topic: General Number: 53 Created: 5/ 1 / 2009 [5/1/09] The sheet index on the cover sheet of the Utility Plan set is not consistent with the plan set itself - please revise. Response: The sheet index has been revised and is consistent with the plan set. Number: 54 Created: 5/4/2009 [5/4/09] Please provide a more detailed explanation of the approved variances in the general notes (note 48). Please tell what is being varied and any conditions of approval. Response: Note 48 has been revised to provide more detail regarding the approved variance. Number: 55 Created: 5/5/2009 [5/5/09] The following comments are from Technical Services: 1) The plat does not need 'Block 1". Just Lot 1 is sufficient. Please remove "Block 1" from Site and Landscape Plans also. Response: 'Block 1" has been removed. 2) Please change the name in the title block on the plat, it is confusing. Response: The name has been revised. 3) The Landscape and Utility Plans have minor scanning issues. Response: The plans have been revised to clean-up scanning issues. 4) Incorrect benchmarks listed in the Utility Plans, please contact City surveying or Technical Services for updated benchmark information. Response: The benchmarks have been corrected. g�Afl tV " T,.�.,,a NT lid., Conserltnnts, fn�.