Loading...
HomeMy WebLinkAboutKAUFMAN & ROBINSON OFFICE DEVELOPMENT - PDP - 40-08 - DECISION - CORRESPONDENCE-HEARINGKaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 9 of 9 that adjoins a zone district that is predominantly characterized by permitted residential uses. In compliance with Section 2.8.2(H)(1), it is hereby determined that the development plan as submitted is not detrimental to the public good and that the plan as submitted will promote the general purpose of the standards for which the modifications are requested equally well than would a plan which complies with the standards for which the modifications are requested. DECISION The Kaufman & Robinson Office Development Project Development Plan, # 40- 08 is hereby approved by the Hearing Officer without condition. Dated this 8th day of December, 2009 per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. . TZ4':�nA Ted Shepard Chief Planner Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 8 of 9 • Screening - 4.28(E)(3)(a)2 The plan as submitted contains a parking lot with 9 spaces between the building and the ROW. The plan would be consistent with the majority of the block faces in this developed area along Blue Spruce Drive, with parking between the buildings and the property lines and street, on both the east and west sides. • Screening - 4.28(E)(3)(a)3 The undeveloped property directly east is in the LMN, Low Density Mixed -Use Residential District. The building will be set back from the east property line a distance of 80' with a stormwater detention pond located within this setback area. No landscaping is being proposed in the detention pond; therefore, the plan as submitted does not fully satisfy this section of the LUC. However, there is an existing pond with significant vegetation (trees and shrubs) on the property to the east that will provide an additional landscaped separation of about 300' between this building and future residential. SUMMARY OF CONCLUSIONS A. The Kaufman & Robinson Office Development, PDP contains uses permitted in the Industrial District, subject to an administrative review and public hearing. B. The Kaufman & Robinson Office Development, PDP meets applicable General Development Standards of Article Three. C. The Kaufman & Robinson Office Development, PDP complies with applicable Land Use and Development Standards contained in Section 4.28 of Article Four with the following three exceptions for which three Modifications of Standard have been requested: • Orientation - 4.28(E)(2)(b) - which requires that a building face abut the required minimum landscaped yard for at least 30% of the building frontage. • Screening - 4.28(E)(3)(a)2 - which requires a minimum 30' deep landscaped yard be provided on the subject property along the street right-of-way for Blue Spruce Drive. • Screening - 4.28(E)(3)(a)3 - which requires a minimum 80' deep landscaped yard be provided along any boundary line Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 7 of 9 The combined requirement of the district buffer and building frontage on the buffer, eliminates the possibility of placing parking to the west of the building, resulting in a building side Wend condition' facing the street, with the building entry located on an 'off-street' side. Allowing parking between the street and the building provides for the primary building entrance located facing the street. This orientation provides a more architecturally detailed and visually attractive facade to face the district boundary. The subdivision creating these lots was filed in 1974, and the current owners purchased the property in 1996; both occurred prior to adoption of the current district buffer standard in 1997. To mitigate the request to waive the district buffer requirements and ensure that the intent of the Land Use Code is met, we have proposed increasing the landscaping along Blue Spruce Drive to include one additional tree and six additional shrubs as screening to the parking. Additionally, a pedestrian link has been provided from the new sidewalk along Blue Spruce Drive, across the parking to the main entry. Given the age of this development, the nature of this infill development and the character of the neighboring properties, we feel that this modification is not unreasonable or a substantial departure from the intent of the requirements in the Land Use Code. Staffs Evaluation: In evaluating the proposed modifications of standards set forth in Subsections 4.28(E)(2)(b), 4.28(E)(3)(a)2, and 4.28(E)(3)(a)3, staff has determined that the development plan as submitted is not detrimental to the public good and that the plan as submitted will promote the general purpose of the standards for which the modifications are requested equally well than would a plan which complies with the standards for which the modifications are requested. Orientation - 4.28(E)(2)(b) The applicant is proposing to provide a parking lot containing 9 spaces between the front of the building and Blue Spruce Drive. The distance between the front of the building and the property line would be 80' and the 30' deep landscaped yard would not be included. The plan would be consistent with the majority of the block faces in this developed area along Blue Spruce Drive, with parking between the buildings and the property lines and street, on both the east and west sides. Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 6 of 9 The undeveloped property directly east is in the LMN, Low Density Mixed -Use Residential District. The plan as submitted does not fully satisfy this standard. The applicant has submitted a request for a modification of this standard. Applicant's Request: 1) Per section 4.28(E)(3)(a.3) of the Land Use Code, an 80-foot buffer is required between this Industrial zoned property and the adjacent Low Density Mixed -Use Neighborhood to the east. This project provides for an 80-foot strip of property free of buildings and parking, but seeks a modification of this standard to provide additional landscape screening. Section 2.8.2(H)(1) of the Land Use Code allows for such a modification of the standard when the submitted application promotes the purposes of the code and equally meets the provisions of the modified standard. The existing Evergreen West pond and surrounding vegetation create a visual screen that exceeds the requirements of the 80-foot buffer. 2) Per section 4.28(E)(3)(a.2) of the Land Use Code, a 30-foot district boundary buffer is required between Industrial zoned property and the CS, Service Commercial property west of Blue Spruce Drive. Section 4.28(E)(2)(b) of the Land Use Code then requires that 30% of the building frontage abut to this buffer. This project seeks a modification of these standards to waive the requirement of the district buffer and to waive the requirement of positioning the building to abut this buffer. Per section 2.8.2(H)(1) of the Land Use Code, a modification of these standards may be granted where the submitted plan promotes the general purpose of the standard. The standards for district buffers are in effect to visually screen differing land uses, in this case, industrial and commercial uses. While zoned commercially, the neighboring lot has been developed industrially, both in use and visual character of the development. The vertical structure is a concrete and metal building with a small amount of fenestration facing the proposed project. The majority of the openings that do face the proposed project site are overhead doors with an industrial look. The parking for the commercially zoned lot extends to the street with no landscaping of any kind. The proposed project is on an infill lot, developing one of the few remaining vacant properties in this subdivision. The planned orientation of street/parking/building is consistent with all of the properties in this subdivision to the south, and the building location proposed creates a uniform setback with these properties. There is no requirement for a district buffer south of Red Cedar Circle as there exists industrial zoning on both sides of Blue Spruce Drive. Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 5 of 9 of concrete panels, metal & ivy "green screens", and stone veneer at the entry. The materials are very similar to the existing materials already used in the surrounding area. Section 3.6.4. Transportation Level of Service Requirements The City of Fort Collins Traffic Engineer and Transportation Planning Department have determined that, based on the information provided in the Transportation Impact Study, the P.D.P. complies with the standard. 3. ARTICLE 4 — INDUSTRIAL ZONE DISTRICT Section 4.28(E) Development Standards The proposal satisfies applicable development standards in the I - Industrial District, with the following three exceptions: A. Section 4.28(E)(2)(b) - Orientation: This standard requires that a building face abut the required minimum landscaped yard for at least 30% of the building frontage. The applicant is proposing to provide a parking lot containing 9 spaces between the front of the building and Blue Spruce Drive. The distance between the front of the building and the property line would be 80' and the 30' deep landscaped yard would not be included. The applicant has submitted a request for a modification of this standard. B. Section 4.28(E)(3)(a)2 — Screening: This standard requires a minimum 30' deep landscaped yard be provided on the subject property along the street right-of-way (ROW) for Blue Spruce Drive. The plan as submitted contains a parking lot with 9 spaces between the building and the ROW. The applicant has submitted a request for a modification of this standard. C. Section 4.28(E)(3)(a)3 — Screening: This standard requires a minimum 80' deep landscaped yard be provided along any boundary line that adjoins a zone district that is predominantly characterized by permitted residential uses. Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 4 of 9 Section 3.2.1(E)(5). Parking Lot Interior Landscaping The proposal satisfies the requirement set forth in Section 3.2.1(E)(5) pertaining to 6% of the interior space of a parking lot with less than 100 spaces shall be landscape areas. There is 6.1 % interior landscaping being provided. Section 3.2.2. Access, Circulation and Parking. Bicycle Facilities - Section 3.2.2(C)(4)(a) - a rack for 2 bicycles is being provided next to the main entry of the building. This exceeds the minimum of 1 bicycle parking space required as 5% of the total vehicle parking spaces on -site. Direct On -site Access to Pedestrian and Bicycle Destinations - Section 3.2.2(C)(6) - the on -site pedestrian and bicycle circulation system is designed to provide for direct connections to major pedestrian and bicycle destinations, including the existing neighborhood park to the east and the shopping center to the west of the development. Required number of parking spaces - Section 3.2.2(K)(2)(a) — the P.D.P. does not exceed the maximum parking allowance for light industrial and office. Section 3.3.1. Plat Standards The P.D.P complies with the general plat requirements. Section 3.3.5 — Engineering Design Standards The P.D.P complies with all design standards, requirements and specifications for utility and public services as required. Section 3.5.1(B). Architectural Character The building will be compatible with the established architectural character of the surrounding area which is characterized as a mix of industrial/commercial/office. Section 3.5.1(C). Building Size, Height, Bulk, Mass, Scale The building would be one story and 22' in height, with a flat roof. It will be a long, linear structure very similar to the existing buildings to the north and south. Section 3.5.1(E). Materials The building materials will be predominantly metal on the north, south, and east sides. The front side facing Blue Spruce Drive, to the west, will be a combination Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 3 of 9 From the Public: John Minatta, 2037 Lexington Court, Fort Collins, CO. 80526 Written Comments: None FACTS AND FINDINGS 1. Background: The surrounding zoning and land uses are as follows: N: I; existing industrial, commercial S: I; existing industrial, commercial E: LMN; existing pond & wetland, undeveloped W: CS; existing industrial, commercial The property was annexed into the City as part of the Pine Tree Park Annexation in November, 1972. The property was subdivided as Lots 3 & 4, Block 5 of Evergreen Park Subdivision in 1973. The property remained as Lots 3 & 4, Block 5 with Replat (No. 1) of Evergreen Park Subdivision in March, 1974. 2. ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS Section 3.2.1(D)(2). Street trees. The proposed street tree planting is in accordance with Section 3.2.1(D)(2)(b), providing trees at 30' on -center in an area behind attached sidewalk or at 25' on - center in a parkway between curb and detached sidewalk along Blue Spruce Drive. Section 3.2.1(E)(4). Parking Lot Perimeter Landscaping The proposal satisfies the parking lot perimeter landscaping requirements set forth in Sections 3.2.1(E)(4)(a) & (b), providing a combination of deciduous shrubs and trees in a planting area between the parking lot and Blue Spruce Drive and in a planting area between the parking lot and the south property line. 1� Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 2 of 9 SUMMARY OF HEARING OFFICER DECISION: ZONING DISTRICT: I, Industrial STAFF RECOMMENDATION: Approval NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established no controversy or facts to refute that the hearing was properly posted, legal notices mailed and notice published. PUBLIC HEARING The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 4:00 p.m. on December 2, 2006 in Conference Room A at 281 North College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; (3) a sign up sheet of persons attending the hearing; and (4) a tape recording of the hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Steve Olt, City Planner Andrew Carney, Civil Engineer From the Applicant: Matt Heiser, Basis Architecture Steve Lane, Basis Architecture Shawn Sullivan, Delta Construction Jim Kahn, Ion Sources Kaufman & Robinson Office Development Project Development Plan Administrative Hearing Findings, Conclusions, and Decision December 8, 2009 Page 1 of 9 CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: PROJECT NAME: CASE NUMBER: APPLICANT: HEARING OFFICER: PROJECT DESCRIPTION: December 2, 2009 Kaufman & Robinson Office P.D.P. BASIS Architecture c/o Matthew Heiser 1692 Big Thompson Avenue Estes Park, CO 80517 Kaufman & Robinson, Inc. 1306 Blue Spruce Drive, Suite A Fort Collins, CO 80524 Ted Shepard Chief Planner This is a request for a technology -based design and manufacturing company. This is a 2-phase development on 1.76 acres. Phase 1, fronting on Blue Spruce Drive, will consist of 9,500 square feet of Office & Light Industrial uses in a single -story metal building. Phase 2 will be a 4,875 square foot addition to the rear of the building for Light Industrial uses. A total of 22 on -site parking spaces are being provided. The company will employ between 12 and 30 people. The subject properties are on the east side of Blue Spruce Drive, at the intersection with Red Cedar Circle, and are zoned I - Industrial. They are Lots 3 & 4, Block 5 of Evergreen Park and are addressed as 1324 & 1330 Blue Spruce Drive. j Planning, Development & Transportation Services F City of Community Development & Neighborhood Services ort CollinsCollege Avenue P.O.P. P.O. Boxox 58580 Fort Collins, CO 80522.0580 970.416.2740 970.224.6134- fax fcgov.com December 8, 2009 Attendee of the Project, Kaufman & Robinson Office Development, Project Development Plan (PDP) - #40-08, Public Hearing, Please find attached to this letter a copy of the Type I Administrative Hearing Findings, Conclusions and Decision for the Project Hearing of Kaufman & Robinson Office Development, Project Development Plan (PDP) - #40-08 Pursuant to Section 2.2.7(D) of the Fort Collins Land Use Code, this Decision has been mailed to the applicant and any person who provided testimony at the public hearing. This final decision of the Administrative Hearing Officer may be appealed to the City Council, in accordance with Chapter 2, Article II, Division 3 of the City Code, within 14 calendar days of the date of final action December 8, 2009 by the Hearing Officer. The deadline to file an appeal is 5:00 p.m. on Tuesday, December 22, 2009. Guidelines explaining the appeal process, including the Code provisions previously referenced, can be found online at fcgov.com/cityclerk/appeals.phg, or may be obtained in the City Clerk'=s Office at 300 LaPorte Avenue. If you have any questions about the attached Decision or the appeal process, please contact me at 221-6343. Sincerely, Thepard Chief Planner