HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES (4TH FILING) - PDP - 33-10 - CORRESPONDENCE - CORRESPONDENCE-HEARING (5)Page 6 of 6
Shannon Robbins
FICS Design Group, LLC
7350 East Progress Place
Suite 208
Greenwood Village, CO 80111
shannon@hcsdesigngroup.com
Office: 303-698-5638
Fax: 303-778-0628
Cell: 303-704-9246
4/15/2011
Page 5 of 6
Sent: Tuesday, April 05, 2011 1:03 PM
To: Shannon Robbins
Subject: RE: Ridgewood Hills
Shannon,
We should have at least 2 weeks prior to the public hearing to review the documents. I have to be able to address
all issues in my Staff Report and Recommendation to the Hearing Officer. I will need to send him my report and
associated documents about 1 week prior to the hearing.
Steve
From: Shannon Robbins [mailto:shannon@hcsdesigngroup.com]
Sent: Monday, April 04, 2011 2:29 PM
To: Steve Olt
Subject: RE: Ridgewood Hills
Steve,
I wanted to follow up with you on this e-mail below. Can you tell me how much time you will need to review our
plan revisions prior to the hearing on April 25th7
Thanks!
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesig group.com
Office: 303-698-5638
Cell: 303-704-9246
From: Shannon Robbins
Sent: Thursday, March 31, 2011 10:26 PM
To: Steve Olt
Subject: Ridgewood Hills
Hi Steve!
At the PDP Staff Review Meeting last week for Ridgewood Hills, you and Susan Joy requested to see/review
certain plans prior to the Administrative Hearing (i.e. Photometric Plans). Now that we are set for Monday, April
25th, can you tell me how much time Staff will need to review the updated and added plans prior to hearing?
Thanks!
Shannon
1�.
HCS DESIGN GROUPuc
4/15/2011
Page 4 of 6
Sent: Thursday, April 07, 2011 9:23 AM
To: Shannon Robbins
Cc: Susan Joy; Rob Irish; 'Carle Dann'; Wes Lamarque; Jeff County; Ward Stanford; Lindsay Ex; Peter Barnes;
Matthew Wempe
Subject: RE: Ridgewood Hills
Shannon,
• We can work with PDF's at this time, prior to the hearing on April 25tn
• You can submit only pages of the documents that have revisions, as long as that is clear to the various City
staff people.
• Please return a response letter to the staff letter dated March 25, 2011 (attached).
If/when you respond to this e-mail with PDF's please respond to ALL (since I have copied this e-mail to all City
staff involved).
Steve Olt
Project Planner
From: Shannon Robbins [mailto:shannon@hcsdesigngroup.com]
Sent: Wednesday, April 06, 2011 3:21 PM
To: Steve Olt
Subject: RE: Ridgewood Hills
Steve,
Since two weeks is this coming Monday, April 11, 2011—we are working hard to make sure we have addressed
all comments.
Can you tell me what exactly you would like from us by next week:
• PDF's or Hard Copies?
• If hard copies, how many sets?
• Will you need the entire submittal or only the pages that changed/added?
• Response Letter to the Staff Comments dated March 25, 2011?
• Is there anything else I am missing?
Thanks!
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesigngroup.com
Office: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mailto:SOLT@fcgov.com]
4/15/2011
Page 3 of 6
As I review the Site Photometric Plan just provided I see several areas where the lighting levels exceed the
allowable as set forth in Section 3.2.4(C) & (D) of the Land Use Code. Please look at the table in Subsection (C)
and the allowable light levels at 20' outside of the property line per Subsection (D)(8). Most residential projects,
even multi -family, are well within the limits set forth in this section. Also, did some of the light poles in the
parking/drive aisles get taller?
Steve
From: Shannon Robbins [mailto:shannon@hcsdesigngroup.com]
Sent: Monday, April 11, 2011 2:49 PM
To: Steve Olt
Cc: Susan Joy; Rob Irish; Carie Dann; Wes Lamarque; Jeff County; Ward Stanford; Lindsay Ex; Peter Barnes;
Matthew Wempe
Subject: RE: Ridgewood Hills
Steve,
Please find attached the following PDF's for Ridgewood Hills Fourth Filing:
• Response Letter from Hendricks Communities dated 4.11.11—This letter is in response to Staff
Comments dated March 25, 2011.
• Memo from Delich & Associates dated 4.4.11—This letter is in response to comments from Ward
Stanford in an e-mail dated March 26, 2011.
• Hazardous Materials Impact Study —This study is for storage of chemicals used at the pool on Tract B.
• PDF Drawings
o Revised Site Plan highlighting the following revisions:
• Added trail connections at Peyton Drive and SE corner of Tract A.
■ Wider walks at east side and west side of Buildings A and D respectively for tree wells.
■ Revised Unit Entry locations at ground floor corner units and coordinating walks.
o Revised Building Elevations (does not include Clubhouse or Cabana as these drawings have not
changed) highlighting the following revisions:
• Revised Unit Entry locations at ground floor corner units.
o Added Site Photometric Plans
o Exhibit — Trail Connection at SE corner of Tract A from Interwest Consulting Group
o Exhibit —Tree Well from Ripley Design Inc.
Please let me know should you have any questions.
Thank you,
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesigngroup.com
Office: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mailto:SOLT@fcgov.com]
4/15/2011
Page 2 of 6
Thank you! I will have Landscape Plans to you tomorrow and revised Photometric Plans not later than Friday.
Thanks!
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesigngroup.com
Office: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mailto:SOLT@fcgov.com]
Sent: Tuesday, April 12, 2011 4:46 PM
To: Shannon Robbins
Subject: RE: Ridgewood Hills
Shannon,
Yes, you may.
Steve
From: Shannon Robbins [mailto:shannon@hcsdesigngroup.com]
Sent: Tuesday, April 12, 2011 4:32 PM
To: Steve Olt
Subject: RE: Ridgewood Hills
Steve,
I will be happy to pass your comments along to our consultant, ESC Engineering, for them to take a look at. Is
this an opportunity to address these items yet this week and submit revised pages?
Thanks!
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesigngroup.com
Office: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mailto:SOLT@fcgov.com]
Sent: Tuesday, April 12, 2011 3:06 PM
To: Shannon Robbins
Subject: RE: Ridgewood Hills
Shannon,
4/15/2011
Page 1 of 6
Steve Olt
From: Shannon Robbins [shannon@hcsdesigngroup.com]
Sent: Thursday, April 14, 2011 4:37 PM
To: Steve Olt
Subject: RE: Ridgewood Hills
Attachments: RWH - Landscape Plans (Pages 6-8).pdf; RWH - Building Elevations (Pages 9-15).pdf; RWH -
Site Photometric Plans (Pages 16-17).pdf
Steve,
Please find attached the following:
• Landscape Plans (Pages 6-8)
• All Building Elevations (Pages 9-15)
• (Revised) Site Photometric Plans (Pages 16-17)
I am awaiting revised Site Plans (Pages 1-3) showing the revised locations of the Site Lighting (from changes to
the Photometric). I will have those to you no later than tomorrow. In answer to your question from earlier e-
mails, the height of the lighting poles in the parking areas did not change from earlier submittals.
Thanks!
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon Qhcsdesienerouo.com
Office: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mailto:SOLT@fcgov.com]
Sent: Wednesday, April 13, 2011 3:22 PM
To: Shannon Robbins
Subject: RE: Ridgewood Hills
Shannon,
One other thing I will need is the Building Elevations sheets that show the residential buildings on Tract B, the
clubhouse and the garage/trash enclosures. These were sheets 12 — 14 on the previous plan set. We need these
elevations to complete the PDP set that must go to the Hearing Officer since he is reviewing the entire project.
Steve
From: Shannon Robbins [mailto:shannon@hcsdesigngroup.com]
Sent: Tuesday, April 12, 2011 5:10 PM
To: Steve Olt
Subject: RE: Ridgewood Hills
4/15/2011