Loading...
HomeMy WebLinkAboutMAPLE HILL 4TH REPLAT - PDP - 18-10 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYIII. PROPOSED DEVELOPMENT The Gillespie Farm is a residential development, located in the southeast quadrant of the CR11/CR52 intersection in Fort Collins. Figure 3 shows a site plan of the Gillespie Farm. The short range analysis (Year 2010) includes development of the Gillespie Farm and an appropriate increase in background traffic, due to normal growth and other potential developments in the area. The long range future was assumed to be Year 2022. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation 6`" Edition, ITE was used to estimate trips that would be generated by the proposed/expected uses at this site. Table 2 shows the expected trip generation on a daily and peak hour basis. TABLE 2 Trip Generation 210 Singe Family 526 D.U. 9.57 5034 0.19 100 0. 66 295 M910.20 220 Apartment 216 D.U6.63 1432 0.08 17 0.43 93 Total6466 117 388 SAMEP MASe Trip Distribution Directional distribution of the generated trips was determined for the Gillespie Farm based upon gravity model analysis, the location of trip productions for these types of land uses, and engineering judgment. Future year data was obtained from the NFRRTP and other traffic studies. Figure 4 shows the short range (2010) and long range (2022) trip distribution used for the Gillespie Farm. Background Traffic Projections Figure 5 shows the short range (2010) background traffic projections. Background traffic projections for the short range future horizon was obtained by reviewing the NFRRTP and various traffic studies prepared for this area of Fort Collins. The other traffic studies in this area are for Richard's Lake PUD, Hearthfire PUD, KB Homes, the Lind Property ODP, and Eastridge. In addition to 8 APPENDIX 6 MAPLE HILL PHASE 7 SKETCH PLAN ohm. I. PHARP 1 PHA.qF 14 MAPLE HILL ROAD= 0 N O a;-r JI II :I II ----------i-��-------------------- .. COUNT/ nM 54 ._. r _____, .._e-B .ti........................ T.. .. I ' 1 PHASE 8 �'.ASE fi I. PHASE 5 RIASE 5 I 1 .__ wueo we PHASES etiwo urE � ;I 1 II 5 f__________ — I 1 L:I =t,4 PHASE] J �H'11 3 d. •PHASE 5 �I PI SE< �I - 1 � I _ ewsazurrE I` 1 I s MAPLE HILL OVERALL DEVELOPMENT PLAN AREAS SUBTRACTED FOR NET DENSITY CALCULATION bn. a mme<.. unp r�.M as au c.r a aen.y. ♦ uay r�.x as nu �n � nwb. • u! re,.< ass nar r+w/ a PMga t Wy r .v e.A xa. rc aJ.ga . uq [a_r r.v nA a.r a a.m... wy rev r aw wneemb../y �... ro an ma rc a+s.. rem w...r awao.e.�.uyr ...r an au uv n.ba� oery . arcb rrn.0 r.0 abr / + s wr.a.`a wP m.wr au aar wn na.y. e.my m...r ao a.0 w..u�,nr.up ram.. au .a/ n awb. a b«r r aw nw �so�.w •wryr nrr nw cd.u- w..n • wa r..... >aa as ! a �{ I IYq GrsY 26/ r.O /aWNN Nsa rsrn rmw 0 NORTH 6 IEM' SOO' .6O O r 0 APPENDIX A TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 210 Single Family Detached 105 DU 9.57 1004 0.19 20 0.56 59 0.64 67 10.37 1 39 --AI L-DELICH Maple Hill, February 2010 -7, rASSOCIATES DELICH ASSOCIATES Traffic & Transportation Engineering 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 �, r MEMORANDUM TO: Mike Sollenberger, Sollenberger Development Co. Linda Ripley, VFR Design t,4o RED/o ,. City of Fort Collins �0R ... d D `a"�� FROM: Joe/Matt Delich a � `C".b DATE: February 1, 2010 a �a 6 SUBJECT: Maple Hill Transportation Impact Study Addendum (File: 0190ME05) This memorandum provides a trip generation analysis for the Maple Hill Phase 7 proposed to be located within the Maple Hill Development. The traffic impacts of Maple Hill were addressed in the "Gillespie Farm (Maple Hill) Transportation Impact Study," (TIS) dated November 2002. The City of Fort Collins staff requested a brief trip generation memorandum. An overall site plan of Maple Hill Development and a current site plan for the Maple Hill Phase 7 is provided in Appendix A. In the cited TIS, the Maple Hill Phase 7 area was proposed as 216 apartment units. According to the new site plan, the Maple Hill Phase 7 area will have 105 sinle family dwelling units. Single Family Detached (Code 210) from Trip Generation, 8t Edition, ITE was used to calculate the expected trip generation from the proposed single family dwelling units. Table 1 shows the calculated trip generation using dwelling units as the trip generation variables. From the cited TIS the calculated and approved trip generation for Maple Hill Phase 7 was: 1432 daily trip ends, 110 morning peak hour trip ends, and 134 afternoon peak hour trip ends. The trip generation table from the cited TIS is provided in Appendix B. The new trip generation results in: 1004 daily trip ends, 79 morning peak hour trip ends, and 106 afternoon peak hour trip ends. This is a decrease of 428 daily trip ends, 31 morning trip ends; and 28 afternoon trip ends as compared to that shown in the cited TIS. It is respectfully requested that no further traffic analyses are required for the proposed use of the Maple Hill Phase 7 since the trip generation is less than that in the cited TIS.