9. Service connections to structures require an elder valve (sewer shut-off valve)
and a cleanout. Elder valves must be installed upstream of the cleanout and a
minimum 3-feet from any wall, overhang or other structure that might limit
access to the valve. Elder- valves may be purchased from vendors in Fort
Collins, Colorado.
10. All construction shall be inspected by District inspector prior to backfill.
11. For off -site sewer line manholes: Manhole rims shall be set flush with the
surface when within an all-weather access roadway, rims shall be set 6-inches
above grade if they are not within an all-weather access roadway.
S:\DEVELOPMEN-RBasins\West_Basin\Cooper_Slough_lnterceptor Subbasin\Maple_Hill\Phase 7\Design Review\2010-
12-14-Desig n-Review-1. doc
__. - _ --A
Exhibit 2
ly l
1,
o �,` o
C? l Jyf� ' , �v' �.
Ms Emma McArdle
14 December 2010
Page 3 of 4
3201 E. Mulberry Street,
Unit Q
P.O. Box 1518
To: File Fort Collins, CO 80522
Ph: 970 498-,
From: Engineering 0604
Date: 05 September 2008 Fax: 970 498-0701
Subject: Sanitary Sewer Notes for Plan and Profile Sheets
Notes
1.
All sanitary sewer line construction shall conform to the latest Boxelder
Sanitation District "Standards and Specifications for Sanitary Sewer Pipeline
Construction and Improvements."
2.
All sewer services shall be minimum 4-inch diameter constructed at a slope of
2% from the building to the sewer main, unless otherwise specified and
approved by the District.
3..
All 6-inch diameter sewer services shall be constructed at a slope of 1 % from
the building to the sewer main.
4.
When groundwater is encountered clay cut off :walls shall be installed on the
upstream side=of all"manholes,'in the mid -section of each main line run at
intervals not to exceed 300-feet, or as required by the District. See detail
sheets for clay cut-off wall. detail.
5.
Field verify invert elevation of sanitary sewer and basement finished floor
elevation for gravity flow prior to constructing foundations.
6.
The Contractor shall schedule a pre -construction meeting with Boxelder
Sanitation District a minimum of one week before construction to coordinate
schedules and clarify any additional District requirements. Contact number is
970-498-0604.
7.
Contractor shall notify the District's inspector forty-eight hours prior to start of
construction.
8.
Contractor shall be responsible for coordinating field locates of all existing
utilities prior to any construction.
-5:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough Interceptor _SubbasinVulaple_Hill\Phase 7\Design Review\201 -
12-14-Design-Review-1.doc
"""��\
Ms Emma McArdle
14 December 2010
Page 2 of 4
Exhibit 1
Boxelder Sanitation District Easement Use Language
(for Platted Easements Where Sanitary Sewer Will be Installed -.to be Included
on all Plats)
There shall be no erection or construction of any building or other structure,. or any
permanent obstruction, or decrease or substantial increase in ground level, from the
finished elevations on this set of plans, in a manner that will interfere with use of the
utility easement or impede access over and across the easement for purposes of
operation, maintenance or future installation, repair or replacement of an existing or
future sanitary sewer.
2. Landscaping in the area of the easement where a sanitary sewer is installed shall not
create impediments to ingress and egress, nor shall landscaping material be installed
or any trees or shrubs whose height is greater than 2-feet be planted in the easement
area that may impinge on the overall operation and maintenance of the infrastructure
placed in the easement. Driplines of all trees shall not extend over the installed
sanitary sewer line(s).
3. No fence, which may impede access to and across the easement, shall be installed
without prior approval from Boxelder Sanitation District. Any such fence, installed
with the Boxelder Sanitation District's approval, must have gates to allow access to
and across the easement of Boxelder Sanitation District's maintenance vehicles, and
must be paid for by the developer or property owner.
4. Boxelder Sanitation District, which owns infrastructure installed in the utility
easement, has the right from time to time to enlarge, improve, reconstruct, relocate
and replace any underground utility lines, improvements or other appurtenances
constructed hereunder with any other number or type of underground utilities and
pipelines, or other structures either in the original location or at any alternate location
or locations within said utility easement.
5. Boxelder Sanitation District shall have the right to mark the location of its
infrastructure by suitable markers set in or on the ground; provided that permanent
markers shall be placed in locations which will not interfere with any reasonable use
of said utility easement.
6. Boxelder Sanitation District shall have the right to install and maintain a gravel access
road within the utility easement for use by District personnel, equipment and vehicles.
S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_Interceptor_Subbasin\Maple_Hill\Phase 7\Design Review\2010-
;12-14-Design-Review-1.doc
4 !n d 6Pcd \ \�-e rQ4W.
I 2,11 L-i1) ()
14 December 2010
Emma McArdle
City of Ft. Collins, Current Planning
PO Box 580
281 N. College Avenue
Fort Collins, Colorado 80524
Re: #1810/A Maple Hill, Fourth Replat: 1st Review
Dear Ms. McArdle:
Plans for the above referenced project were received by Boxelder Sanitation District (District)
staff. District staff have reviewed and redlined the drawings. The following comments are to
further clarify redlines. Note that not all redlines have been delineated in the comments
below (i.e. minor redlines are not described in the comments below).
Sheet #
Comment
1
a
Use Boxelder Sanitation District review signature block (Emailed to Keystone
(Cover)
Engineering Consultants). Use this block on all drawings where Boxelder
signature block is needed.
2
N
General Notes, #40: Suggestion — clarify "F.C. Datum" as "NGVD1929"
Plat
■
Add Boxelder easement use notes (Exhibit 1, also emailed to Keystone
sheet 1
Engineering Consultants
Plat
■
Add redline text
sheet 2
4
0
MH Numbering: See redline text. Carry this number over to all applicable sheets
within drawing set.
6 ,
■
Add concrete encasement as redlined (also show on storm sewer sheets)
■
Add District P&P sheet notes (Exhibit 2, also emailed to Keystone Engineering
Consultants), see redline, typical all plan and profile sheets
7
■
Add concrete encasement as redlined (also show on storm sewer sheets)
Remove drop MH as redlined
8
Add concrete encasement as redlined also show on storm sewer sheets
21
Add clay cut off wall detail (Emailed to Keystone Engineering Consultants
If there are questions, please contact me at 970-498-0604. Thank you.
Sincerely
RZdy' d ns, P.E.
District Engineer
3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 ■ Fax (970) 498-0701 ■ Email bsd@verinet.com