HomeMy WebLinkAboutMAPLE HILL 4TH REPLAT (PHASE 7) - CTR - 18-10 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONDwelling Unit Counts and Densities:
Phase 7
Gross acreage 17.91 AC
Subtracted parcels 2.90 AC
(Lot 1, Tract V, open space)
Net Acreage 15.01 AC
Single Family Lots 101
Duplex Units 4 (on two lots)
Total Dwelling Units 105
Density 6.99 DU/AC
Overall Development Plan
Gross acreage 154.79 AC
Subtracted parcels 28.51 AC
Net Acreage 126.28 AC
Single Family Lots 449 + 101 = 550
Duplex Units 78 + 4 = 82
Total Dwelling Units 682
Density 5.00 DU/AC
(�;3a
l'�CP_)-8
_ S 604i5
3.8.18 Residential Density Calculations
Net acreage calculation:
The following acreages have been subtracted from the gross acreage to calculate the
net residential density.
(a) land to be dedicated for arterial streets
County Road 11 1.67 AC
County Road 52 0.50 AC
(d) land containing outdoor spaces that are to be dedicated to the public or
deeded to the homeowner's association and preserved for a park or
central green ...............
(f) Land dedicated to pedestrian/bicycle path connections when required
pursuant to subsection 3.2.2 (C) (6) or subsection
4.5(E)(1)(b)...................
Neighborhood Park 7.16 AC
(Tract p
Neighborhood Center 1.00 AC
(Lot 1)
Open Space/Bike Trail 18.18 AC
(Tracts B',S,R, T', U, C', V, AA, BB,
J, X, Z, Y, F', P` plus open space in Phase 7)
Total
28.51 AC
Only parts of these tracts have been included in the calculation. (See map
delineation.)
City Of Development Review Guide — STEP 2 of 8
F6rt Collins CONCEPTUAL REVIEW:
APPLICATION
General Information
All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a
Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does
not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City
Staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are
likely to get from the meeting. Please be aware that any information submitted may be considered a public record,
available for review by anyone who requests it, including the media,
Conceptual Reviews are scheduled on three Mondays per month. One half-hour meeting is allocated per applicant.
Please call the Community Development and Neighborhood Services Office at 221-6750 to schedule a Conceptual Review
meeting. Conceptual Review is a free service. Applications and sketch plans must be submitted to City Staff no
later than 5 pm, two Tuesdays prior to the meeting date. Application materials can be dropped off in person to 281 N
College Ave., emailed to emcardle(cDfcgov.com or faxed to (970)224-6134.
At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and
Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater,
Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority.
Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no
approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented
with a letter from staff, summarizing comments on your proposal.
*BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.*
Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc)
Gillespie Farm Development Company ( Applicant) Mike Sollenberger, Tom Dougherty (Owner Representatives) Linda Ripley (Consultant)
3usiness Name (if applicable) VFR Design, Inc.
Phone Number 970-224-5828
Mailing Address 401 West Mountain, Ft. Collins
Fax Number 970-224-1662
Email Address linda.ripley@vfrdesigninc.com
Site Address or Description (parcel # if no address) Maple Hill - East of Forcastle Drive and South of Ballard Lane
Description of Proposal (attach additional sheets if necessary)
Project development plan for Maple Hill -Phase 7 to include 101 single family lots and 2 duplex lots for a total of 105 dwelling units.
See attached lotting plan and supporting density calculations.
Proposed Use Single family and duplex
Existing Use vacant
Age of any Existing Structures no existing structures
Info available on Larimer County's Website: htto://www.co.ladmer.co.uslassessor/query/search.cfm
If any structures are 50+ years old, good quality, color photos of all sides of the structure are required.
Increase in Impervious Area impervious area is likely to decrease from the multi -family project that had been planned originally S.F.
(Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site)
Things to consider when making your proposal:
• Is water detention being provided? If so, where?
How does the site drain now? Will it change? If so, what will change?
What is being proposed to treat run-off?
Where will access and parking for the site be located?
Suggested items for the Sketch Plan:
'roperty location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements
(buildings, landscaping, parking/drive areas), existing natural features (water bodies, wetlands, large trees, wildlife, canals,
irrigation ditches), utility line locations (if known), photographs (helpful but not required).
Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580