Loading...
HomeMy WebLinkAboutCOLORADO IRON & METAL - PDP - 20-09 - REPORTS - RECOMMENDATION/REPORTNo Text No Text No Text No Text No Text �, ...�. -� �_� ,, S,L ___ .r v- � C O i V O I � b t Conclusion This memorandum documented the transportation impacts associated with the Colorado Iron and Metal relocation project. The project is located at 903 Buckingham in Fort Collins, Colorado. Based on the analyses, investigations, and findings documented in the various sections of this Transportation Impact Study, the following can be concluded. • The project will not present a significant impact to the surrounding roadway system. • The project will produce similar trips to the FedEx use that was previously occupying the site. • The project is expected to produce approximately 497. During the morning peak hour, 60 trip ends can be expected and 70 trip ends can be expected from the project during the afternoon peak hours. It is likely that the trips produced by Colorado Iron and Metal are less than the previous use on the site. • Level of service is acceptable at the key intersections • Level of service will continue to be acceptable at the key intersections with the implementation of the project • No new auxiliary lanes are required with the project • Pedestrian LOS will not be achieved with the project due to the gaps in continuity in the system to both the east and west of the site. The gaps are on undeveloped property outside the control of the developer. ELB Engineering, LLC 5401 Taylor Lane Fort Collins. CO 805 38 Phone: 9i0.9S8-7M FIV 9:-0-'-5-894 ELBEt?gineerin�'[lpiuo-adhrnd. net 13 FZBF�ngnee»�LCC Transportation ftr6weenj;g Solutions Memorandum TO: Mr. Joe Olson, Traffic Engineer O J E.'/ T Mr. Kent Garvin, Colorado Iron & Meta oQ- Je cC G<; %`) I FROM: Eric L. Bracke, P.E., P.T.O.E 0; DATE: October 4, 2008 SUBJECT: Colorado Iron & Metal Relocation — Tra pact Memorandum This memorandum addresses the transportation impacts of the proposed Colorado Iron and Metal Relocation Project. The project also entails developing a recycling drop-off center. The current location of the business is 1400 East Mulberry in Fort Collins. The proposed location is in an existing structure located at 903 Buckingham. The proposed site was once the location of the FedEx distribution center. A vicinity map of the new location is displayed in Figure 1 on the following page. Colorado Metal & Iron is a local business that specializes in metal recycling as well as metal and steel fabrication. The business has 32 employees. A meeting was held with the City Traffic Engineer to determine the scope of the transportation impact study. It was agreed that the project will have relatively minor impact to the surrounding street system and that a memorandum would be sufficient to address the related transportation impacts. The following intersections would be examined during the normal peak hours: • Lemay and Buckingham • Buckingham and Linden It was agreed that a short-term (year 2010) analysis examination of alternative modes of transportation. transportation study can be found in Appendix A. ELB Engineering. LLC 5401 Tavlor Lore Fort Collins. CO 60? 28 Phone: 970-988-'>51 J F.IV: 9710-27i-8942 ELBEn,� i neerin,:'-t2.1 pbroadhand. nei would completed as well as an The scoping form for the 1 /111100,.F,�`or�.t of April 12, 2010 ZOO i Dear Resident: Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov.com/currentplanning On Monday, April 26, 2010, at 5:30 p.m. (or as soon thereafter as possible), in Conference Room A at 281 North College Avenue", Fort Collins, CO., the City of Fort Collins Hearing Officer will conduct an Administrative Public Hearing to consider a development proposal in your neighborhood. A decision on the proposal will result from this public hearing. Please access the building by the public door at the east end of the building, adjacent to North College Avenue. This is a request to replat parts of Lot 1, 2 and 3 of Vanworks Subdivision, Lot 3 of Odell Subdivision, Lot 23 of a Replat of North Lemay Subdivision, and Lot 1 of Second Replat of North Lemay Subdivision. The proposal also includes the addition of heavy industrial uses and two additional buildings on the proposed lot. The property is in the I, Industrial Zone District. The proposed use and replat is permitted in the zone district subject to an administrative review and public hearing. The list of affected property owners for this public meeting is derived from official records of the Larimer County Assessor. Because of the lag time between occupancy and record keeping, or because of rental situations, a few affected property owners may have been missed. Please feel free to notify your neighbor of this pending meeting so all neighbors may have the opportunity to attend. Sincerely, Emma McArdle City Planner *The City of Fort Collins will make reasonable accommodations for access to City . services, programs, and activities and will make special communication arrangements for persons with disabilities. Please call 970.221.6750 for assistance. i `(ief='i�\��'.r' may`. - I : L.. 1 ----- -- San C sto St r �i 1 aer! Center Dr--, zo mero St-'— `�i Site Buckingham St o i I Ill mill T I ELincoln Ave Z ``k I f \ l \ i �� � n C E Oa St E m a 3 1 i t �14 E Magnolia S E Olive StHL _E \ 1 �__� �\ /• i N #20-09 - Colorado Iron and Metal, PDP Vicinity Map 1 inch = 600 feet Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 8 C. Transportation Level of Service -- Section 3.6.4 Buckingham Street is classified as a two lane collector by the Fort Collins Master Street Plan. The Transportation Impact Study has been reviewed and evaluated by the Traffic Operations and Transportation Planning Departments. The project provides vehicular, pedestrian and bicycle facilities necessary to maintain the adopted transportation Level of Service standards as contained in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual. The T.I.S. concludes that the future Level of Service at the key intersections will be acceptable. 4. Findings of Fact/Conclusion In evaluating the Colorado Iron and Metal PDP, Staff makes the following findings of fact: A. The PDP contains permitted uses and complies with the applicable land development standards of the I — Industrial Zone District in accordance with Article 4 of the Land Use Code. B. The PDP complies with the applicable General Development Standards of Article Three of the Land Use Code. C. The PDP complies with the applicable procedural and administrative requirements of Article Two of the Land Use Code. RECOMMENDATION: Staff recommends approval of the Colorado Iron and Metal Project Development Plan # 20-09. ATTACHMENTS: Vicinity/Zoning/Aerial Map Full sized plan set Statement of planning objectives Excerpts of Transportation Impact Study, dated October 2008 Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 7 ii. Handicap Parking [Section 3.2.2(K)(5)]: The total number of parking spaces in the project is 69. Section 3.2.2(K)(5)(d) specifies that for this number, a minimum of 3 handicap accessible spaces must be provided. Five handicap parking spaces are provided. These spaces are located conveniently to the main entry doors of the two buildings that customers will be accessing. iii. Parking Space Dimensions: [Section 3.2.2.(L)] The parking dimensions indicated on the plans meet the minimum dimensions required. e. Site Lighting [Section 3.2.4] — Proposed site lighting mostly meets our lighting standards. All of the specified light sources appear to be concealed, down -directional luminaires. The only place that light spills from the sight beyond 1.0 foot-candle is on the very back section, into another industrial used site. f. Trash and Recycling Enclosures [Section 3.2.5]—Trash enclosures have been sized appropriately to accommodate trash and recyclables. Trash enclosure elevations are consistent with the materials and colors proposed for the buildings. B. Building Standards — [Division 3.5] 1) Architectural Character, Building Size, Mass and Scale and Building Materials [Section 3.5 (B), (C) and (E)] — The existing structure on this site is a tan metal building with no architectural detail. The applicant is proposing the addition of a clerestory window, a modern style entry feature and new windows to the front of the building. The entry feature lacks articulation for the entrance doors, Staff will work with the applicant during Final Compliance to make this facade more defined. The two new accessory structures are proposed as tan metal structures to match the existing building. The building to the west will be screened from view by a planting bed along the public view and the building to the rear of the site is interior to the site and out of the public's view. The modern features proposed are compatible with the surrounding industrial neighborhood that has a very modern/industrial character to it, especially noticeable in the newer building stock (Odell's Brewery and New Belgium Brewery). The neighboring property to the west, is very similar to the existing metal building. The proposed materials, colors, scale and character are compatible with the surrounding neighborhood. 2) Outdoor Storage Areas/Mechanical Equipment [Section 3.5.1 (1)]—All trash and recycling areas are at least 20 feet from public walks and are screened from view according to Section 3.2.5 of the Land Use Code. 7 Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 6 v. Transportation Impact Study: [Section 3.2.2(C)(8)] A scoping meeting was held to determine the extent of study necessary for this proposal, and a Transportation Impact Memorandum determined to be sufficient. The Transportation Impact Memorandum was performed and submitted with this proposal. This proposal is not expected to present a significant impact to the surrounding roadway system. The report is attached for further review. b. Access and Parking Lot Requirements [Section 3.2.2 (D)]: i. Pedestrian/Vehicle Separation: [Section3.2.2.(D)(1)] Pedestrians and vehicles are separated to the maximum extent feasible on this infill and redevelopment site. The pedestrian connection to the front of the building crosses a drive aisle through the parking lot, but is delineated by a raised walk. ii. Access: [Section3.2.2.(D)(2)] All off-street parking spaces have unobstructed access to and from public streets. All off-street parking is contained onsite. c. Parking Lot Layout [Section 3.2.2 (E)-(J)]: The parking lot is designed with clear and logical circulation routes for vehicles, trucks, and also for bicycles and pedestrians. The pedestrian connection into the site is delineated by a raised walk through the parking lot. Most landscaped islands are defined with curbs, the plan has left out curbs in some locations, Staff will work with the applicant to make sure this is represented correctly during final compliance. d. Parking Lots [Section 3.2.2 (K)]: Non-residential parking requirements: [Section 3.2.2(K)(2)] Non- residential parking requirements have a maximum number of parking spaces allowed. This proposal has been considered a "Low intensity retail" use for the parking requirement, rather than "industrial," because this facility is expected to generate approximately 401 trips from customers daily for recycling drop offs. The "industrial" parking maximum is only accounting for employee parking, which would limit the facility to 24 parking spaces. This number will not accommodate the parking for customers, therefore, Staff supports the applicant's request to be considered a "low intensity retail" use for the parking standards, this use limits the parking to 74 spaces. The proposal includes 69 spaces, which is in compliance with the standards for a "low intensity retail" use. A Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 5 diversity meets the standards of this section, with no tree species exceeding 25% of the total. 2) Landscape standards: All non -paved areas of the site plan are acceptable landscaped areas including turf, shrubs, ornamental trees, flower beds and foundation plantings. Screening of parked cars from the property to the north will be achieved with a dense planting of trees, mixed plantings of shrubs and ornamental trees and a decorative 30" wrought iron screening fence. Parking lots are sufficiently landscaped. Landscaped islands are provided at least every 15 parking spaces. Standard plan notes have been included on the landscape plan to cover landscape materials, maintenance and replacement. Staff will review these notes in final plan review to ensure that they are complete and accurate. Appropriate separation distances from traffic signals, City street lights, underground and overhead utility lines have been provided. Staff will continue to work with the applicant on these separations as plans finalize. Appropriate sight distances have been maintained at all drive cuts for safety. 3) Access, Circulation and Parking [Section 3.2.2] a. Development Standards [Section 3.2.2 (C)]: Safety Considerations: [Section 3.2.2 (C)(1)]— Pedestrians, bicycles and vehicles are separated to the maximum extent possible in this proposed plan. Public sidewalks and walkways connect to streets, parking lots and building entrances for a coordinated and functional pedestrian network throughout the site. The existing building has a sidewalk connection to the public sidewalk through the parking lot in front of the building, which is delineated by a raised walk through the drive aisle. ii. Curb cuts and ramps [Section 3.2.2 (C)(2)] Curb cuts and ramps are provided for the most part throughout the site. Some locations are missing details on the plan, Staff will work with the Applicant to refine the plans during Final Compliance. iii. Site Amenities and Bicycle Facilities: [Section 3.2.2 (C)(3) and (4)] Bicycle parking is provided meeting the standards of this section. Bike racks are provided on a hard surface near the main entrance and walkways for clear and direct access to the main entrance. iv. Walkways: [Section 3.2.2(C)(5)] Walkways within this site directly and continuously connect pedestrian points of origin and destination. 5 Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 4 C. Land Use Standards: [Section 4.28 (D)] Dimensional Standards: The proposed buildings and addition to the existing building meet the height requirements. The existing main building is two (2) stories, the proposed clerestory addition and entry feature will increase the height from 28' 3'/" to 39' 5", which is in compliance with the height requirements. The two new buildings are one story each meeting the height requirements. The structures are both less than 50,OOOsf. D. Development Standards: [Section 4.28(E)] 1) Building Design: [Section 4.28(E)(2)] a. Applicability of Section 3.5. The uses proposed do not require the structures meet the standards of Section 3.5.3 per Section 4.28(E)(2)(a) of the LUC. b. Orientation. The orientation of the building meets the standards of this section, as it is facing the street, does not have a blank fagade and has landscaping along 30% of the building. c. Building character and color. The addition to the existing building and new structures are proposed to be neutral colors to complement the existing structure and meet the standards of this section. 2) Site Design: [Section 4.28(E)(3)] a. Screening. The proposed site does not abut any residential uses, Buckingham is not an arterial street and is not a district boundary, and therefore, this screening section does not apply. b. Storage and Operational Areas. The loading dock, located on the east side of the site, is buffered from the street by a stucco stone wall and landscaping. This site is an internal industrial zoned site and the front of the site is reserved for less intensive automobile parking, as oppose to the side and rear that will be used for loading, moving of equipment, etc., which is in compliance with this section of the LUC. 3. Compliance with Applicable General Development Standards A. Site Planning and Design Standards [Division 3.2] 1) Landscaping and Tree Protection: [Section 3.2.1 ] — The Project Development Plan provides a full tree stocking and street trees throughout the project site. Street trees are shown to be 30 to 40 feet apart on center, where possible, in landscaped parkways. The species n Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 3 COMMENTS: Background The surrounding zoning and land uses are as follows: N: I, Industrial; Existing New Belgium Brewery E: I; Existing Point Five Windows Manufacturing and Sales S: I; Existing Vanworks Service Garage and mini storage facility W: I; Vacant Property owned by Odell Investments The property was annexed into the City in June, 1974 as part of the Northeast Consolidated Annexation. The subject property was originally platted in the North Lemay Subdivision, Second Filing in September, 1981. The majority of the site was re -platted as Lots 1 — 3 of Vanworks Subdivision, Second Filing' in April, 1997. 2. Compliance with Applicable I — Industrial Zone District Standards A. Purpose: The purpose of the Industrial District is as follows: "The Industrial District is intended to provide a location for a variety of work processes and work -places such as manufacturing, warehousing and distributing, indoor and outdoor storage, and a wide range of commercial and industrial operations. The Industrial District also accommodates complementary and supporting uses such as convenience shopping, child care centers and housing. While these Districts will be linked to the city's transportation system for multiple modes of travel, some may emphasize efficient commercial trucking and rail traffic as needed. Industrial and manufacturing processes used in this District may, by necessity, be characteristically incompatible with residential uses. " The proposed project site is located in the center of a cluster of Industrial zoned properties. The PDP is proposing the addition of "Heavy Industrial" uses and two new structures in addition to the already approved "Light Industrial" and "Office" uses. "Recycling Facility' uses have not been approved yet, but are currently under review by Staff, in the Minor Amendment mentioned in the Executive Summary. B. Permitted Land Uses: [Section 4.28 (B)] The proposed addition of use is for heavy industrial, which is permitted in this zone district, as a Type I . (Administrative) use. 3 Colorado Iron and Metal, PDP - #20-09 Administrative Public Hearing April 26, 2010 Page 2 EXECUTIVE SUMMARY: The applicants have brought this site through the minor amendment process two times in the last two years and a stand-alone Modification of Standard was brought to an administrative hearing officer on March 24, 2010 to allow the Colorado Iron and Metal operation to be relocated onto this site from its original East Mulberry site. The first minor amendment, completed in late 2008, was a change of use for the existing building from "warehouse and distribution" to "light industrial (steel fabrication) and office." The second minor amendment, which is currently in process, is an addition of use for "recycling facilities" both inside and outside of the existing building. This minor amendment also includes the addition of 1000 square feet of pavement, a truck scale, fencing around the site and landscaping to buffer the outdoor use. The stand- alone Modification of Standard, which was submitted concurrently with the second Minor Amendment, was to Section 3.8.11(C) Fences or Walls of the Land Use Code (LUC). This section refers to the requirement that "fences or walls shall be no more than four (4) feet high between the front building line and front property line." The Modification of Standard was approved by a hearing officer on March 30, 2010. The fencing that was approved as part of that decision will be removed for the overall PDP that this Staff Report describes. This Project Development Plan (PDP) and Staff Report is specifically for the re -plat of the property, two new buildings and the addition of "heavy industrial' uses on the site. The proposed use and re -plat are permitted subject to a Type 1, administrative, review and public hearing. This PDP complies with the applicable Administrative and General Development standards and the standards of the I Industrial Zone District outlined in the City of Fort Collins Land Use Code. 2 of Fort� l i. EM NO 1 o-�- MEETING DATE 2_U9110 STAFF PROJECT: Colorado Iron and Metal, PDP - #20-09 APPLICANT: Troy Jones MTA Planning and Architecture 238 Walnut Street, Suite 200 Fort Collins, CO 80524 OWNER: GTG Investments 903 Buckingham Street Fort Collins, CO 80524 PROJECT DESCRIPTION: HEARING OFFICER This is a request to re -plat parts of Lot 1, 2 and 3 of Vanworks Subdivision, Lot 3 of Odell Subdivision, Lot 23 of a Re -plat of North Lemay Subdivision, and iLot 1 of Second Re -plat of North Lemay Subdivision. The proposal also includes the addition of heavy industrial uses and two additional buildings on the proposed lot. The property is in the I, Industrial Zone District. The proposed use and re -plat is permitted in the zone district subject to an Type 1 (administrative) review and public hearing. RECOMMENDATION: Approval Current Planning 281 N College Av PO Box 580 Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750