HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES (4TH FILING) - PDP - 33-10 - SUBMITTAL DOCUMENTS - ROUND 1 -with the first phase known as Tract A. Development and construction on Tract C will likely occur
within 2 1/2 years of approval of all city entitlement issues. The public improvements and
recreational/common space areas on this site will be constructed when the property is
developed.
2) Site Plan Drawings —See Attached from Consultant:
3) Subdivision Plat —See Attached from Consultant:
4) Architectural Elevations — See Attached from Consultant:
5) Landscape Plan —See Attached from Consultant:
6) Transportation Impact Study — See Attached from Consultant:
7) Utility Plans - See Attached from Consultant:
8) Utility Plans Checklist - See Attached from Consultant:
9) Preliminary Drainage Report/Plans - See Attached from Consultant:
10) Soils Report - See Attached from Consultant:
11) Conceptual Lighting Plan - See Attached from Consultant:
12) Hazardous Materials Impact Analysis - See Attached from Consultant
13) Explanation of any known modification request: N/A
14) Requests for any known engineering variances: N/A
15) Letters of Intent — N/A
16) Other Information and Data: N/A
Ridgewood Hills Residences
Submittal Requirements Summary
Page 2 of 2
Interwest Consulting Group
King Surveyors, Inc.
HCS Design Group LLC
Ripley Design, Inc.
Delich Associates
Interwest Consulting Group
Interwest Consulting Group
Interwest Consulting Group
Earth Engineering Company, Inc.
HCS Design Group LLC
HCS Design Group LLC
Proiect Development Plan (PDP) - Submittal Requirements Summary
Hendricks Communities LLC
Ridgewood Hills Residences
Tract A, Tract B and Tract C
December 7, 2010
1) Written Documentation
(a) Application Form — See Attached
(b) Transportation Development Review Fee Application — See Attached
(c) Three lists of names/addresses of all Owners of Records within 1000' of the property lines — Delivered to
Steve Olt from Sharon Spencer on Tuesday, 11-30-10.
(d) Statement of Planning Objectives — See Attached titled Statement of Planning Objectives
a. Neighborhood Meeting Staff Notes dated 9-20-10 attached
(e) Response Letter —See Attached titled Response Letter -Conceptual Review
a. Conceptual Review Staff Comments dated 6-28-10 attached
(f) Complete List of new street names requested — N/A
(g) Legal Description of the Site — See below. The legal description can also be located on Page 1 of 3 of the
Subdivision Plat titled Ridgewood Hills P.U.D., Fourth Filing Plat contained within this PDP Submittal.
a. LEGAL DESCRIPTION: Parcels of land located in Section 14, T.6N., R.69W., of the 6th P.M., City Of
Fort Collins, County of Larimer, State of Colorado and being more particularly described as
follows: Tract N and Tract T of Ridgewood Hills P.U.D., Third Filing according to the recorded plat
thereof as recorded by the Larimer County Clerk and Recorder on August 4, 2000 as Reception
No. 2000053189.
(h) Current Property Owner :
a. Loren R. Snyder
7477 Promontory Drive
Windsor, CO 80550
(i) Owner/Applicant Information:
a. Hendricks Communities LLC
J. Marc Hendricks, President
7350 East Progress Place, Suite 208
Greenwood Village, CO 80111
6) Development Schedule:
a. It is anticipated that the proposed Tract A, B and C will be developed separately. It is anticipated
and proposed that Tract A and Tract B will be developed first with a phased development.
Construction on Tract A will likely start within 1 1/2 years of approval by the city of all
entitlement issues and will be followed with the development and construction of Tract B. If
phased, the clubhouse, public improvements and internal site infrastructure will be developed
Ridgewood Hills Residences
Submittal Requirements Summary
Page 1 of 2