Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES (4TH FILING) - PDP - 33-10 - SUBMITTAL DOCUMENTS - ROUND 1 -with the first phase known as Tract A. Development and construction on Tract C will likely occur within 2 1/2 years of approval of all city entitlement issues. The public improvements and recreational/common space areas on this site will be constructed when the property is developed. 2) Site Plan Drawings —See Attached from Consultant: 3) Subdivision Plat —See Attached from Consultant: 4) Architectural Elevations — See Attached from Consultant: 5) Landscape Plan —See Attached from Consultant: 6) Transportation Impact Study — See Attached from Consultant: 7) Utility Plans - See Attached from Consultant: 8) Utility Plans Checklist - See Attached from Consultant: 9) Preliminary Drainage Report/Plans - See Attached from Consultant: 10) Soils Report - See Attached from Consultant: 11) Conceptual Lighting Plan - See Attached from Consultant: 12) Hazardous Materials Impact Analysis - See Attached from Consultant 13) Explanation of any known modification request: N/A 14) Requests for any known engineering variances: N/A 15) Letters of Intent — N/A 16) Other Information and Data: N/A Ridgewood Hills Residences Submittal Requirements Summary Page 2 of 2 Interwest Consulting Group King Surveyors, Inc. HCS Design Group LLC Ripley Design, Inc. Delich Associates Interwest Consulting Group Interwest Consulting Group Interwest Consulting Group Earth Engineering Company, Inc. HCS Design Group LLC HCS Design Group LLC Proiect Development Plan (PDP) - Submittal Requirements Summary Hendricks Communities LLC Ridgewood Hills Residences Tract A, Tract B and Tract C December 7, 2010 1) Written Documentation (a) Application Form — See Attached (b) Transportation Development Review Fee Application — See Attached (c) Three lists of names/addresses of all Owners of Records within 1000' of the property lines — Delivered to Steve Olt from Sharon Spencer on Tuesday, 11-30-10. (d) Statement of Planning Objectives — See Attached titled Statement of Planning Objectives a. Neighborhood Meeting Staff Notes dated 9-20-10 attached (e) Response Letter —See Attached titled Response Letter -Conceptual Review a. Conceptual Review Staff Comments dated 6-28-10 attached (f) Complete List of new street names requested — N/A (g) Legal Description of the Site — See below. The legal description can also be located on Page 1 of 3 of the Subdivision Plat titled Ridgewood Hills P.U.D., Fourth Filing Plat contained within this PDP Submittal. a. LEGAL DESCRIPTION: Parcels of land located in Section 14, T.6N., R.69W., of the 6th P.M., City Of Fort Collins, County of Larimer, State of Colorado and being more particularly described as follows: Tract N and Tract T of Ridgewood Hills P.U.D., Third Filing according to the recorded plat thereof as recorded by the Larimer County Clerk and Recorder on August 4, 2000 as Reception No. 2000053189. (h) Current Property Owner : a. Loren R. Snyder 7477 Promontory Drive Windsor, CO 80550 (i) Owner/Applicant Information: a. Hendricks Communities LLC J. Marc Hendricks, President 7350 East Progress Place, Suite 208 Greenwood Village, CO 80111 6) Development Schedule: a. It is anticipated that the proposed Tract A, B and C will be developed separately. It is anticipated and proposed that Tract A and Tract B will be developed first with a phased development. Construction on Tract A will likely start within 1 1/2 years of approval by the city of all entitlement issues and will be followed with the development and construction of Tract B. If phased, the clubhouse, public improvements and internal site infrastructure will be developed Ridgewood Hills Residences Submittal Requirements Summary Page 1 of 2