>>> "Shannon Robbins" <shannon@hcsdesigngroup.com> 8/23/2010 11:17 AM >>>
Good Morning, Steve!
I wanted to follow up on a few things for the proposed Ridgewood Hills Residential
Project for Hendricks Communities.
Can you tell me if a Traffic Study will be required for this project?
Also, I wanted to make sure you received the information needed from Sharon Spencer
for our Neighborhood Meeting? Please let me know should you need additional
information from me.
Thanks!
Shannon
M�
HCS DESIGN GROUPuc
Shannon Robbins
HCS Design Group, LLC
7350 East Progress Place
Suite 208
Greenwood Village, CO 80111
shannon@hcsdesigngrouP _com
Desk: 303-698-5638
Fax: 303-778-0628
Cell: 303-704-9246
fileWC:\Documents and Settings\solt\Local Settings\Temp\GW}000O1.HTM 8/23/2010
Page 3 of 5
Good Afternoon, Joe,
We have submitted a Preliminary Site Plan to the Community Development Department for
Conceptual Review and have received comments in return. We are now in the process of setting
up our Neighborhood Meeting.
Steve Olt, our planner, recommended that I contact you regarding a traffic study for our site at
the intersection of Triangle Drive and Avondale Road. What information can I provide to you
so that you can help us to determine if a Traffic Study is needed for this development and if so,
what information will be required of the study?
Thank you for your time, I appreciate it!
Sincerely,
Shannon Robbins
Shannon Robbins
HCS Design Group, LLC
shanno_n__@hcsd_es_igngroup corn
Desk: 303-698-5638
Cell: 303-704-9246
From: Steve Olt [mai Ito: SOLT@fcgov.com]
Sent: Monday, August 23, 2010 12:17 PM
To: Shannon. Robbins
Subject: Re: Ridgewood Hills Residential - Hendricks Communities
Shannon,
We did receive the necessary Affected Property Owners list from APO Colorado.
Regarding a Traffic Study, one is required as part of your Project Development Plan submittal
unless waived by the traffic engineer. Please contact Joe Olson, the City's Traffic Engineer, who
will determine if one is needed and what would have to be in the study. Joe can be reached at
970-224-6062 or jolson@fcgov.com.
Now we need to find an acceptable date, time, and place for a neighborhood meeting.
Steve Olt
City's Project Planner
970-221-6341
solt@fcgov.com
file://C:\Documents and Settings\solt\Local Settings\Temp\GW}0000l.HTM 8/23/2010
v
Page 2 of 5
Sincerely,
Shannon
Shannon Robbins
HCS Design Group, LLC
shannon@hcsdesigngroup.com
Desk: 303-698-5638
Cell: 303-704-9246
From: Ward Stanford [mailto:wstanford@fcgov.com]
Sent: Monday, August 23, 2010 2:48 PM
To: Shannon Robbins
Subject: Fwd: RE: Ridgewood Hills Residential - Hendricks Communities
Hi Shannon,
I need to know the basics of what is being planned. Is it all residential or will it be mixed use? If
resi, how many single and multi -family units. If retail, commercial, etc. what type of use and the s.£
for each use. Also, what streets border the project and how many accesses are planned to those
streets.
With this info I can estimate the tiip generation'and that will tell me if you'll need a TIS.
Regards,
Ward Stanford
Traffic Systems Engineer
City of Fort Collins
Traffic Operations Department
wstanford@fcgov.com
(p)970-221-6820
(f) 970-221-6282
>>> On 8/23/2010 at 1:45 PM, in message <4C727B8A.F1B2.0066.0@fcgov.com>, Joe Olson
wrote:
Ward,
Can you follow up with Shannon please.
Thanks,
Joe
>>> "Shannon Robbins" <shannon@hcsdesigngroup.com> 8/23/2010 12:26 PM >>>
file://C:\Documents and Settings\solt\Local Settings\Temp\GWJ0000l.HTM 8/23/2010
Steve Olt - RE: RE: Ridgewood Hills Residential - Hendricks Communities
Page 1 of 5
From: Ward Stanford
To: Shannon Robbins
Date: 8/23/2010 4:11 PM
Subject: RE: RE: Ridgewood Hills Residential - Hendricks Communities
CC: Joe Olson; Steve Olt
Shannon, based upon the number of units for each use a TIS will be needed.
If I can be of further help please feel free to email or call me.
Regards,
Ward Stanford
Traffic Systems Engineer
City of Fort Collins
Traffic Operations Department
wstanford@fcgov.com
(p)970-221-6820
(f) 970-221-6282
>>> On 8/23/2010 at 2:53 PM, in message
<4F59519F5713 E245 865920ADEF 8AF7AB2B584E@HCSERV ER.hendricks.local>,
Robbins" <shannon@hcsdesigngroup.com> wrote:
Hi Ward,
"Shannon
Thank you for getting back with me. I have attached a Preliminary Site Plan for your review. Most
of your questions should be answered with this Site Plan, but I will quickly note some of the
answers as well:
2 Separate Tracts (Tract T and Tract N)
Tract N
LMN Zoning
40 Family Condo Units (5 Buildings: 8 Units per building)
2-Story Buildings
Tract T
MMN Zoning
130 Independent Senior Residences (4 Buildings: Units per build varies -see attached)