HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES (4TH FILING) - PDP - 33-10 - CORRESPONDENCE - (45)STORM WATER -WATER -WASTE WATER • Stormwater o Number 78: Acknowledged. o Number 79: Acknowledged. No response needed. ZONING • Zoning o Number 12: Acknowledged. See revised Site Plans on Page 2 and 3 of 17. o Number 13: Acknowledged. Bicycle parking has been dispersed adequately for Tract A and Tract B. Tract B has less on -site parking due to the number of private garages provided for this development. o Number 14: Acknowledged. Trash enclosure locations have been reviewed and updated accordingly. Please see revised Site Plans on Page 2 and 3 of 17. o Number 15: Acknowledged. Dimensions have been provided for the HC Garage Spaces at Tract B. Please see Page 3 of 17. o Number 25: Acknowledged. Plant material types and counts were added to the Landscape Plans. o Number 26: Acknowledged. Exterior light fixture schedule and locations can be found on Page 16 and 17 of 17. Cut Sheets have also been provided with this submittal. o Number 27: Acknowledged. Exterior light fixtures for the Clubhouse can be found on Page 16 of 17. Ridgewood Hills Fourth Filing Response Letter — PDP Review Page 7 of 7 PFA • Fire Authority o Number 16: Acknowledged. Please see Site Plans on Sheet 2 and 3 of 17. o Number 17: Acknowledged. Please see Site Plans on Sheet 2 and 3 of 17. o Number 18: Acknowledged. o Number 19: Acknowledged. No response needed. TRAFFIC OPERATIONS • TIS o Number 87 — 90: Acknowledged. Please see revised Traffic Impact Study from Delich and Associates as part of this revised submittal. • Traffic Operations o Number 91: Acknowledged. Utility information is required for other departments therefore we have shaded the utilities for clarity. Please see revised Civil Plan Set. o Number 92: Acknowledged. A striping plan has been added to the set. Signing and final striping will be provided at Final Design. Please see revised Civil Plan Set. TECHNICAL SERVICES • General o Number 69: Acknowledged. Sheets 9-17 (Elevation and Lighting Plans) are part of the set submitted to the City of Fort Collins. • Site Plan o Number 68: Acknowledged. The legal description has been added to Page 1 of 17. o Number 70: Acknowledged. The plans have been revised, please see Sheets 2-5 of 17. • Subdivision Plat o Number 61: Acknowledged. Please note that the title commitment number has been left blank. Once the commitment has been updated, the number will be referenced once it has been received. o Number 62: Acknowledged. Please see revised Subdivision Plat. o Number 63: Acknowledged. Please see revised Subdivision Plat. o Number 64: Acknowledged. Please see revised Subdivision Plat. o Number 65: Acknowledged. Please see revised Subdivision Plat. o Number 66: Acknowledged. Please see revised Subdivision Plat. o Number 67: Acknowledged. All plan sets have been revised to exclude P.U.D. from the title. Ridgewood Hills Fourth Filing Response Letter — PDP Review Page 6 of 7 o Number 51: Acknowledged. Since all easements vary in width, they have been dimensioned on the plat. Since we did not see a particular redline, please specify where this is unclear if needed. o Number 52: Acknowledged. The City Signature Block has been added and will be signed upon Final Design. o Number 53: Acknowledged. The Sanitary District Signature Block has been added and will be signed Final Design. o Number 56: Acknowledged. We believe cross sections are not required on minor collector streets. Please advise. o Number 75: Acknowledged. Pavement design will take place at Final Design. Terracon is under contract and will know the soil conditions and need for flyash. FORESTRY Site and Landscape Plans o Number 76: Acknowledged. Tree species diversities (in percentage) were added to the plant list on Page 6 of 17. The provided notes were also added to the Landscape Notes on Page 6 of 17. LIGHT AND POWER • General o Number 1: Acknowledged. No response needed. o Number 2: Acknowledged. No response needed. o Number 3: Acknowledged. See revised Site Plans on Sheets 2 and 3 of 17. o Number 4: Acknowledged. Will be coordinated prior to Building Permit. o Number 5: Acknowledged. Plan sets have been coordinated, please see revised plan sets. NATURAL RESOURCES • General o Number 9: Acknowledged. A connection has not been made to the trail located on Ridgewood Hills Third P.U.D. due to the topography at the southeast corner of Tract A. • Natural Resources o Number 7: Acknowledged. The buffer note #14 was removed from the Landscape Plans. o Number 8: Acknowledged. Native and wasterwise plant materials are extensively used throughout the site. Reveille Bluegrass or and approved similar hybrid was added to the plant legend. o Number 10: Acknowledged. Owner will review the programs available and will discuss with Gary Schroeder. o Number 11: Acknowledged. o Number 80: Acknowledged. Action Items will be addressed at the time of construction. Ridgewood Hills Fourth Filing Response Letter — PDP Review . Page 5 of 7 Site and Landscape Plans o Number 54: Acknowledged. All plan sets have been coordinated and revised accordingly. o Number 55: Acknowledged. Please see response to Comment #30 above and revised set of plans. o Number 57: Acknowledged. Please see revised Site Plans on Pages 2 and 3 of 17. • Utility Plans o Number 33: Acknowledged. Please see revised Civil Plan Set. o Number 34: Acknowledged. Please see revised Civil Plan Set. o Number 36: Acknowledged. Please see revised Civil Plan Set. o Number 37: Acknowledged. The requested radii have been added. PFA has reviewed the plan and the truck turning and had no comments. Please see revised Civil Plan Set. o Number 38: Acknowledged. We have shown the street cuts per the redlines; please also note that they are determined in the field. Please see revised Civil Plan Set. o Number 39: Acknowledged. The driveways intersect at less than 10 degrees at a point 25' away from the curb and perpendicular to the street. The arc is used to remove a skew that would be allowed by the standards. o Number 40: Acknowledged. Please advise the applicant of the original escrow for Avondale that is discussed in the 3'd Filing DA. o Number 41: Acknowledged. We believe we meet this standard. Please advise if otherwise. o Number 42: Acknowledged. Interwest Consultants will prepare Final Construction Plans for the road and at Final Design will show the off site design that was included in the P Filing plans. o Number 43: Acknowledged. Critical slopes have been labeled. Please see revised Civil Plan Set. o Number 45: Acknowledged. The symbols in question show utility connections to the buildings, we have noted them as "mechanical equipment" on the plans. Please see revised Civil Plan Set. o Number 46: Acknowledged. We have noted riprap at the ends of the curbs. The slopes tie in at 4:1 on our property. Please see revised Civil Plan Set. o Number 47: Acknowledged. The phasing is now simplified. This information will be noted on all sheets at final as required. o Number 48: Acknowledged. Please see revised Civil Plan Set. o Number 49: Acknowledged. Adjacent streets and the land to the east have been surveyed. The neighbors to the west and south have privacy fences therefore we cannot survey those areas. We have noted on the grading plan that these areas drain into the site and this is also shown on the drainage plan. Please advise if the design contours for the single family lots are required for final design. o Number 50: Acknowledged. If acceptable, we will add this information at Final Design via a Utility Landscape Plan. All landscaped areas are shown on the actual Landscape Plans, therefore we do not want to duplicate or cause confusion by having planting direction on the Civil Plans. Ridgewood Hills Fourth Filing Response Letter — PDP Review Page 4 of 7 n • Traffic Operations: o Number 81: Acknowledged. Please see revised Traffic Impact Study from Delich and Associates to address Items 1-6 as part of this revised submittal. • Utility Plans o Number 74: a. Acknowledged. The District provided language and this has been added to the Plat. Minimum clearances were applied to all trees and district lines within the Landscape Plan. Please see revised Plan Sets. b. Acknowledged. This will be completed with Final Design. c. Acknowledged. One dead end line is noted with the Phasing Plan. d. Acknowledged. The design team will be meeting with the District to discuss the mechanical calculations for these buildings and the tap needs. We will work with the District to ensure that we do not oversize the infrastructure. Sufficient easements are in place if larger services are deemed necessary. e. Acknowledged. This will be completed with Final Design. f. Acknowledged. o Number 77: Acknowledged. No response needed. ENGINEERING • General o Number 30: Acknowledged. No walls are abutting the public sidewalk (they are all interior to the site). Building code does not require the widening that LCUASS requires. Handrails will be provided where required by code. o Number 31: Acknowledged. We have added a connection to Tract Z at the location requested. Please see revised Site Plans and Civil Plans. o Number 32: Acknowledged. Please see revised Civil Plan Set. o Number 35: Acknowledged. Please see revised Civil Plan Set. o Number 44: Acknowledged. All intersections were checked; the only sight distance easement needed was on the north side of Avondale. o Number 58: Acknowledged. All drives meet PFA standards. o Number 59: Acknowledged. There is no Ultimate Design for Avondale. What is built with this project will remain with the exception of the driveover curb at the temporary turnaround. o Number 60: Acknowledged. All redlines have been addressed in the revised set of Civil Plans. Ridgewood Hills Fourth Filing Response Letter— PDP Review Page 3 of 7 • GIS • Meter screen details have been added to Page 15 of 17. • The pool and clubhouse are intentionally separated. The Owner has elected not to provide a pool on Tract A, but rather a Clubhouse for the residences of this development. As for Tract B, a pool has been proposed along with a Cabana which will house restrooms, staff/lifeguard office, pool equipment storage and pool chemical storage. • Please see response to Number 84 above. • Please see response to Number 84 above. • Utility information has been removed from the Site Plan and added to the Landscape Plan. Screened fill areas were added to the walkways. • Bicycle parking has been dispersed adequately for Tract A and Tract B. Tract B has less on -site bicycle parking due to the number of private garages provided for this development. • Cabana Elevations have been added to Page 14 of 17. • 11"x17" color renderings have been provided as part of the revised submittal package. • Based upon the minimum density requirements of an LMN and MMN zoned property, we feel we have met the zoning requirements while also maintaining a balance of open space. • Garage Elevations have been revised to match what is proposed on the Site Plan. Please see Page 15 of 17. • Acknowledged. o Number 24: Acknowledged. No response needed. • Landscape Plan o Number 21: Acknowledged. No response needed. • Neighborhood Services o Number 22: Acknowledged. No response needed. • Parks Planning o Number 23: Acknowledged. No response needed. • Site Lighting o Number 72: Acknowledged. Please see attached cut sheets of the proposed site lighting. o Number 86: Acknowledged. Please see attached cut sheets of the proposed site lighting. • Site Plan o Number 85: Acknowledged. Meter screen details have been added to Page 15 of 17. Ridgewood Hills Fourth Filing Response Letter — PDP Review Page 2 of 7 Response Letter Hendricks Communities LLC Ridgewood Hills Fourth Filing PDP Review Tract A and Tract B March 8, 2011 CURRENT PLANNING • Building Inspection o Number 20: a. Acknowledged. See Site Plan on Page 2 and 3 of 17. b. Acknowledged. See Site Plan on page 2 and 3 of 17. • General o Number 28: Acknowledged. As discussed at the meeting on January 19, 2011 with Steve Olt and Steve Dush, we have revised the proposed Site Plan to take into consideration Staff Comments and revise accordingly. Please see revised Site Plan and revised PDP Submittal. o Number 71: Acknowledged. o Number 73: Acknowledged. The number of trash enclosures has been revised on Tract A (formerly Tract A and B). Please see revised Site Plan on Page 2 of 17. o Number 82: Acknowledged. Please see attached Certificate of Mineral Estate Owner Notification. o Number 83: Acknowledged. o Number 84: Acknowledged. Additional sidewalks have been added throughout the community for connectivity. Per Ward Stanford, a mid -block or intersection cross -walk is not necessary. Please see revised Site Plan on Page 2 and 3 of 17. o Number 29: Acknowledged. Please see complete set of revised plans that have addressed each of the items noted within this comment. • Street Lights have been added to the Landscape Plans and spacing requirements were applied to the street trees accordingly. • Tree species diversities (in percentage) were added to the plant list on Page 6 of 17. • Additional fencing will not be added as part of this development. Existing fencing of the single family residences to the south will be completed as necessary and maintained by the Owner of Ridgewood Hills Fourth Filing. • Landscape buffering was added per the meeting with staff and per Section 3.2.1(E)1. • All retaining walls have been labeled and elevations noted on Civil Drawings Pages 4 and 5 of 9. • A graphic under title "Parking Landscape Coverage' was added to Page 6 of 17 to demonstrate the 10% interior landscape coverage. Ridgewood Hills Fourth Filing Response Letter — PDP Review Page 1 of 7