Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES (4TH FILING) - PDP - 33-10 - CORRESPONDENCE - (23)Middle School Impact At build out, this development is projected to produce a growth in enrollment of approximately 8 students over the three middle school grades. At current resident student population levels, and given the fact that there are no active development projects within the attendance area, it is believed that no relief action will be necessary for the foreseeable future. As this development does not meet the walk distance criteria as determined by the board of education, transportation will be required. High School Impact At build out, this development is projected to produce a growth in enrollment of approximately 13 students. At current resident student population levels, and considering that LHS hosts a magnet program, relief action may be required in the foreseeable future. There are no other active developments within the current attendance area. As this development does not meet the walk distance criteria as determined by the board of education, transportation will be required Additional Comments The District's citizen -based Master Plan Committee (MPC) monitors capacity levels at each of the district schools and makes annual recommendations for responding to projected enrollment changes. In consideration of the probable impact(s) of this development, the MPC may recommend using one or more of the tools described in Section 7.5, "Accommodating Change", of Master Plan 2010-2011. The selection and timing of the most appropriate tool(s) will be determined by the Board of Education. The size and location of this development indicate that the school district land dedication requirement should be made in the form of payment -in -lieu -of land dedication as per our intergovernmental agreement. Empower to learn — Challenge to achieve — Inspire to excel www.thompsonschools.org ETHOMPSON OOL DISTRICT 800 South Taft Avenue • Loveland, CO 80537 . Office (970) 613-5017 • Fax (970) 613-5o87 March 22, 2011 Planning Department Referral Comments - #33-10 Ridgewood Hills Fourth Filing -Ridgewood Hills Residences PDP - Type 1 (March 11, 2011) Pursuant to Colorado Revised Statutes, the Thompson R2-J School District submits comments describing projected impacts of proposed developments submitted by statutory authority. Comments reflect information and projections available at time of referral. Project Overview The above -named project will consist of 126 two -bedroom and 20 one -bedroom affordable apartments located in the Ridgewood Hills subdivision, currently within the boundaries of Coyote Ridge Elementary School, Lucile Erwin Middle School, and Loveland High School. Construction is estimated to begin in 12-18 months, with build out anticipated in 2015. Impact Overview Resident populations are within capacity at all levels, and this is not expected to change over the timeframe of this project. The District anticipates that the overall impact from this project, when viewed from a feeder -system perspective, will be minimal. Projections are based solely on 2-bedroom units, as the District does not anticipate school - age children occupying the one -bedroom apartments. Elementary Impact At build out, this development is projected to produce a growth in enrollment of approximately 19 students over the six elementary grades. At current resident student population levels, and given the fact that there are no other development projects within the attendance area, it is believed that no relief action will be necessary. As this development meets the walk distance criteria as determined by the board of education, no transportation will be provided. Empower to learn — Challenge to achieve — Inspire to excel www.thompsonschools.org it Page 1 of 1 Steve Olt From: Skip Armatoski [skip.armatoski@thompsonschools.org] Sent: Tuesday, March 22, 2011 11:26 AM To: Steve Olt Cc: Kate Browne Subject: Coyote Ridge Expansion, RH 4th Comments Attachments: RH4thRef.doc Steve, Just a heads up to let you know that our board approved an expansion to Coyote Ridge Elementary School. We'll probably begin construction in August, so if you get any questions, at least you'll know what's going on. The expansion will be as shown in the original site development plan. Also, attached is our response to the 2nd Round of Review for #33-10 Ridgewood Hills 4th Filing. Skip Armatoski GIS Specialist Thompson R2-1 School District Loveland, CO 970.613.5017 3/22/2011