Loading...
HomeMy WebLinkAboutSHERWOOD FORTS - PDP/FDP - PDP/FDP110009 - SUBMITTAL DOCUMENTS - ROUND 2 - CORRESPONDENCECity of Transportation Development Review Fee Date Received/ Paid Fort Collins IAi� ,�/ Total Amount Paid P°r Project Name: l( Project Location: Date: Type of Submittal Please indicate the type of application submitted by checking the box Foot Notes: preceding the appropriate request(s). When a development project involves a change of use for a Fee structure amount due building, the charge per square foot shall apply to the portion of Overall Development Plan (013P) $500 each the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing Final Development Plan (FDP) Ak F;Vun, use, as determined by the current Institute of Transportation This fee includes 2 rounds of review $1000 each Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for Additional round of review $ 500 each shall apply only to the net additional building size (if any). i] Annexation $20 X _ acres = _+ $250 = These fees do not include the cost of filing fees for the recording of ❑ Minor Amendment $250 each the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be ❑ Major Amendment $2,500 each responsible for the cost of recording the document. Said filing f:cs shall be calculated and provided when the signed document is — Re -zone $200 each returned to the City for signatures and filing. Modification to Land Use Code $200 each *** This fee does not include the cost of filing fees. Filing Wireless Telecommunication Equipment (WTE) $65 each fees shall be determined at the time of final document Road Projects acres (of roadway) X $250 = submittal and will be required prior to filing. Vacation of Easements) '•• # of vacations _ x $400 = General Information• ❑ Vacation of Right(s)of-Way••• #ofvacations _X$800= OwnersName(s): ❑ Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications _ X $250 — Street address: Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X $160 = Multifamily or other residential units $115 per unit #of units X$115= Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot sq It X $0.25 = Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 = Project fee $2,000 each Total of above amounts City/State/Zip: Telephone: _ Fax: Applicants/ Consultants Firm Name: Contact: Street address: $Z,ggQ City/State/ Zip: If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + r/2 (the amount over 30,000 _ The maximum fee for an project shall be S50_ 0 per rest maximum tmh . is check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or a above calculated amount. 5 0 # of residential units X $500. _ ' JO Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP 5 cc: Christie White, Engineering Development Review Engineering Telephone: Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, i hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): Signature: Telephone: t SMALL PROJECT DEVELOPMENT REVIEW FEE SCHEDULE (All applications mush include .75 cents for each APO label in addition to the review fee) TYPE OF PROJECT REVIEW FEE COMMENTS Structural additions or alterations or change of use to single family, two family, multi -family (up to 4 units) dwellings. Conversions from one use to another use if the proposed conversion will not $2g0.00 per P pmject. Fee collected at project submittal. add more than 25% of new habitable floor area to the existing building or eliminate more than 10% of existing habitable floor area. Family -care home, group home. Minimum fee = $200.00 % of estimated bulls ing permit valuation collected at project submittal. Expansion of existing building of less 1%of building permit valuation. Remaining A% collected at time budding permit than $500,000.00 building permit Is issued. Adjustments made at time building valuation. (V2% of building permit valuation if permit is Issued. Applications submitted as submitted as combined PDPlFinal)- combined POP and Final shall be charged'/.% of building permit valuation as total fee. This %% will be collected when application is submitted with final adjustments made at time building permit is issued. POP, or preliminary subdivision, $100.00 dwellino unl1. V per EtnaI or colts 41Ti<liwsion: $100.0 1 L4 ew residential development of 15 or l 8 ner dweiimo_nFIT� Minimum fee at POP or Final = $200.00. Ion dwelflingling units. Applications submitted as combined POPIFinal; $100.00 per dwelling unit. Qr L r Minimum fee = $200.00 A. of the estimated building permit valuation 1 % of building permit valuation. collected at project submittal. New commercial development of less n (`h% of building permit valuation if on if Remaining %a% collected at time building permit than $500,000.00 of building permit submitted as combined PDPt Is Issued. Applications submitted as combined valuation. PDP/Final shall be charged Y.% of building permit valuation as total fee. This %a%will be collected when application is submitted with final adjustments made at time building permit is issued. Annexation or Rezoning petition of five A of regular fee (5) acres or less. These fees are subject to change. Revised March 3. 2010 2 POP Submittal Requiremoots