Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout220 EDWARDS STREET - PDP - 36-07/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETFinal Plan Routing Sheet
Item: ��n•OiAtZO '�h Ujar 4 J1 •
ueroe�nc�u�
This project went to4twgbemyp�Public Hearing on:
The following table lists final plan submittal requirements for this proj Flannm_ and 7 .nm ,
A final fee of $1,000.00 is required at the time of submittal unless otherwise umi Fureduced &UVt.-
Fee *Vm Reduction Approval: —'(��t V� Amount: 42� . 6� —� tow. CO -I'F-V—�
Date:ri
:r _e t4C)l
Engineer: 06a-L-t
Advance Planning
Inspection
..Building
• -- •
nr�nnn©�n�n��nnn
Environmental Planner (Dana)
Transportation Planning
■■0■■■■■■■■■■■■■
WaterConservation
..
n■s�n�®�����
����
Revised 3/4/08
W 22h6f � �dpp��T
VJ