Loading...
HomeMy WebLinkAbout220 EDWARDS STREET - PDP - 36-07/A - CORRESPONDENCE -City staff has determined that another "formal" round of review is not necessary; however, all comments and concerns expressed in this letter must be addressed and included on the mylars (reproducible plans) of the Site, Landscape & Utility Plan and the Building Elevations Plan. Be sure and return all red -lined plans when you submit the mylars of the aforementioned plans. �� y]� s� l�l�E�ii11 CA If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, �Qkt-_ Steve Olt City Planner cc: Randy Maizland Current Planning file #36-07A Page 3 Existing asphalt to be removed and replaced with 6 inches thick concrete connecting the driveway to the sidewalk in the ROW. This revision can be done and submitted on the final mylar. No additional review required. Department: Light & Power Issue Contact: Bruce Vogel Topic: Electric Utility Number: 51 Created: 7/30/2008 [7/30/08] Will need to get existing service located so that it will not be dug up during excavation of new foundation. Service will need to maintain 24" to 30" of cover. Service to new house will come from secondary box in alley. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 16 Created: 12/5/2007 [7/30/08] I'm currently working with several City employees to determine the specific address for the new structure. Regardless of what the determination is, the new structure's address must be mounted in numerals at least six inches high, on the Edwards Street side of the building. [12/5/07] The proposed structure must be given a separate, unique address (22013 Edwards St.). Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 12 Created: 12/4/2007 [7/29/08] Repeat Comment. [ 12/4/07] Please provide the amount of new impervious area being proposed. Number: 55 Created: 7/31 /2008 [7/31/08] Please clarify what the spot elevations are at the corners of the new structure. There are 2 numbers. Is one existing? Number: 56 Created: 7/31 /2008 [7/31/08] Please provide two cross -sections for the swale along the north property line. These cross -sections need to tie in with the existing grade along the property line as discussed in the meeting. Also, provide a couple spot elevations along the flow line of the swale. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 50 Created: 7/29/2008 [7/29/08] Add a note to the plan to "Contact Water Utilities (221-6700) to schedule the water and sewer taps and to coordinate the abandonment of the existing sewer tap". Page 2 STAFF PROJECT REVIEW City of Fort Collins Dave Toll Date: 7/31/2008 1115 Bateleur Lane Fort Collins, CO 80524 Staff has reviewed your submittal for 220 Edwards Street, Final Plans - #36-07A, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Planning Number: 52 Created: 7/31 /2008 [7/31/08] The Building Elevations sheet must be enlarged to 24" x 36" and the mylar, when submitted, must be at this size. Number: 53 Created: 7/31 /2008 [7/31/08] The Technical Services Department indicated that there are minor scanning issues associated with the Site, Landscape & Utility Plan (please see red -lined plan). You can contact them at 221-6588 if you have questions about their comment. Number: 54 Created: 7/31 /2008 [7/31/08] Please see the red -lined Site, Landscape & Utility Plan for additional information needed: * Legal Description: Lot 12, block 8, Craft's Re -Subdivision of Lake Park Addition * Landscape Note: All landscaping shall be installed or the installation shall be secured with a letter of credit, escrow or performance bond for 125% of the value of the landscaping materials and labor prior to the issuance of a certificate of occupancy. Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 49 Created: 7/28/2008 [7/28/08] It has come to my attention that there is an existing asphalt patch between the alley drive approach and the sidewalk. This asphalt patch will need to be removed and replaced with concrete. See the existing concrete alley driveway on the south side directly across the street for an example. Please hatch fill the existing asphalt patch and add a note as follows: Page I