Loading...
HomeMy WebLinkAboutPRPA UG TRANSMISSION LINE - UPRR CROSSING OF TRILBY RD. TO PORTNER SUBSTATION - N.A. (9-09) - CORRESPONDENCE -�i City of Fort Collins CONCEPTUAL REVIEW STAFFCOMMENTS 7. Current Planning has the following comments regarding this proposed development: a. The proposed underground transmission lirie may not have to go through any City review process if it is contained entirely within public street right-of-way or public easements. b. A Site Plan Advisory Review with the City would be required for any portion of the underground transmission line that would be contained in a private easement. Steve Olt is your contact, at 221-6341, if you have questions about these comments. CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins South Fort Collins Sanitation District. Please contact the water and sanitary sewer districts directly, at 226-3104, for their requirements. 4. Glen Schlueter of the Stormwater Utility offered the following comments: a. The crossing of Fossil Creek will need to be wider since the existing culvert will be replaced with box culverts in the future. b. The channel along East Trilby Road will need to be maintained and restored if it is to be disturbed. Please contact Glen, at 224-6065, if you have questions about these comments. 5. Rob Irish of the Light & Power Department asked the Applicant if there would be any directional boring. Mr. Dahl responded by saying that there may be. Other than that Rob had no comments. 6. Dana Leavitt, the City's Environmental Planner, offered the following comments: a. Please familiarize yourself with Section 3.4.1 — Natural Habitats and Features of the Land Use Code (LUC) to determine if there are any such features and what impacts there may as a result of this underground transmission line. b. Please visit with Black & Veatch about the underground transmission line. C. Irregardless of the type of review, if any, required by the City, a meeting with the Environmental Planner - Dana Leavitt (tel. 970-224-6143) is required. This meeting will help the engineering consultant understand the standards set forth in Section 3.4.1 (E) (2). Please contact Dana, at 224-6143, to discuss potential impacts to wetlands along the route of the underground transmission line. WrwiCONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: March 31, 2008 ITEM: PRPA Underground Transmission Line from UPRR Crossing of East Trilby Road to Portner Substation Site next to Transfort Facility on East Trilby Road APPLICANT: Platte River Power Authority c/o Mike Dahl 2000 East Horsetooth Road Fort Collins, CO. 80525 e-mail: dahlm prpa.om LAND USE DATA: Request for an underground transmission line along East Trilby Road between the existing overhead PRPA line at the Union Pacific Railroad tracks (between South Lemay Avenue and South Timberline Road) to the future Portner Substation just west of the City's Transfort facility, west of South Lemay Avenue. The applicant's intent is to contain the transmission line in public right-of-way and/or public easements. COMMENTS: 1. Gary Lopez of the Zoning Department was present at this conceptual review meeting and expressed No Comment. 2. Susan Joy of the Engineering Department indicated that her only comment associated with the underground transmission line is that PRPA would be subject to the standard street cut fees, if applicable, plus possible dedication of off -site easements, if necessary. Please contact Susan, at 221-6605, if you have questions about her comment. 3. Roger Buffington of the Water/Wastewater Department indicated that water and sanitary sewer services for properties in this area will be provided by the Fort Collins -Loveland Water District and the 2 Planning, Development and Transportation Services 6aCurrent Planning r-A� City of Fort Collins April 4, 2008 Platte River Power Authority c/o Mike Dahl 2000 East Horsetooth Road Fort Collins, CO. 80525 Dear Mike, For your information, attached is a copy of the Staffs comments concerning the request for a PRPA Underground Transmission Line from UPRR Crossing of East Trilby Road to Portner Substation Site next to Transfort Facility on East Trilby Road, which was presented before the Conceptual Review Team on March 31, 2008. This is a request for an underground transmission line along East Trilby Road between the existing overhead PRPA line at the Union Pacific Railroad tracks (between South Lemay Avenue and South Timberline Road) to the future Portner Substation just west of the City's Transfort facility, west of South Lemay Avenue. The applicant's intent is to contain the transmission line in public right-of-way and/or public easements. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6341. Sincerely, Steve Olt, Project Planner cc: Stormwater Utility Traffic Operations File 281 North College Avenue — P.O. Box 580 — Fort Collins, CO 80522-0580 — (970) 221-6750 — FAX (970) 224-6134