Loading...
HomeMy WebLinkAboutCOLORADO IRON & METAL - FDP - FDP110005 - CORRESPONDENCE - REVISIONS (3)Oty of F6rt Collins Be sure and return all of your redlined plans when you re -submit. Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov. com If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-221-6206. Sincerely, Emma McArdle City Planner Staff Review Letter Generated: 6/28/2011 at 1:52 pm City of Fort Coltins Department: Technical Services Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax rcgovcom Contact: Jeff County, 970-221-6588, icountyOfcoov.com Topic: Plat Number: 12 06/24/2011: No comments. Topic: Site Plan Number: 4 06/24/2011: No comments. 05/17/2011: No comments. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford(rDfc4ov.com Topic: Construction Drawings Issue Originated: 06/24/2011 Issue Originated: 05/17/2011 Number: 4 Issue Originated: 05/26/2011 05/26/2011: Sheet C10: Please cleanup the signing and striping plans so the curbs, and new lane lines stand out from the existing info. Please minimize the grey scale of the station line and markings. Topic: Landscape Plans Number: 1 Issue Originated: 05/26/2011 05/26/2011: Please move Relocated Tree # 11 further west. It is within the sight triangle of the east access drive. Number: 2 Issue Originated: 05/26/2011 05/26/2011: Please verify that the Patmore Ash shown just west of the middle access drive is not within the sight triangle for the west access. Number: 3 Issue Originated: 05/26/2011 05/26/2011: Please move the Hackberry shown just east of the west access out of the sight triangle area. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(Efcgov.com Topic: Construction Drawings Number: 4 Issue Originated: 06/21/2011 06/21/2011: The existing fire hydrant near the west drive is an older style hydrant with the 6" valve attached to the hydrant. In order to move this hyrant back, it will be necessary to temporarily shutdown the 12" main in Buckingham. This could have an effect on water quality in the area; therefore, it is VERY important for the contractor to coordinate this work with Water Utilities. Add a note on the plans to coordinate the relocation of the hydrant with Water Utilities (See note on redlined plans). Number: 5 06/21/2011: See redlined plans for other comments and revisions. Issue Originated: 06/21/2011 7 Staff Review Letter Generated: 6/28/2011 at 1:52 pm City of Fort Collins `f Department: Stormwater Engineering Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamargueanfcgov.com Topic: General Number: 7 Issue Originated: 05/19/2011 06/24/2011: Reminder 05/19/2011: Please add a note on the site plan that the detention pond can not be used for metal stockpiling. Number: 10 Issue Originated: 06/24/2011 06/24/2011: Please revise water quality calcs and table on the detail sheet per redlines. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(rDfcgov.com Topic: Building Elevations Number: 6 06/24/2011: No comments. 05117/2011: No comments. Topic: Construction Drawings Issue Originated: 05/17/2011 Number: 7 Issue Originated: 05/17/2011 06/2412011: The north arrow is still incorrect. Please change the direction or remove it from the sheet. 05/17/2011: Please correct the north arrow on sheet C9. Number: 13 Issue Originated: 06/24/2011 06/24/2011: There is one line over text issue on sheet C11. Number: 14 Issue Originated: 06/24/2011 06/24/2011: There are two buildings labeled as Proposed Building 2 on sheet C11. Topic: Easements Number: 15 06/24/2011: No comments. Topic: Landscape Plans Number: 5 06/24/2011: No comments. 05/17/2011: No comments. Topic: Plat Number: 1 05/17/2011: The boundary and legal close. Issue Originated: 06/24/2011 Issue Originated: 05/17/2011 Issue Originated: 05/17/2011 Number: 2 Issue Originated: 05/17/2011 05/17/2011: The reception number for the 1 V of Buckingham Street ROW will need to be added prior to mylars. 6 Staff Review Letter Generated: 6/28/2011 at 1:52 pm Community Deveiopment and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgovcom Department: PFA Contact: Carie Dann, 970-219-5337, CDANN(ftoudre-fire.org Topic: General Number: 6 Issue Originated: 05/18/2011 05/18/2011: OCCUPANCY REQUIREMENTS: All existing and proposed structures shall meet requirements for type of occupancy. Number: 7 Issue Originated: 06/20/2011 06/20/2011: Please label the new (proposed) fire hydrant as such. Number: 8 Issue Originated: 06/20/2011 06/20/2011: Please ensure follow-up in completing required documents to dedicate the Emergency Access Easement. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcnov.com Topic: Floodplain Number: 9 06/21/2011: 1) Please resolve per redlines Issue Originated: 06/21/2011 2) Comment carries: Please add note to Platt indicating project is within Poudre River 500-year floodplain. See redlines for suggestion. 3) New comment: Existing note on plat indicates "Property falls in Zone X of map panel 08069C0983F". Please correct note to reflect project is in SHADED Zone X and panel number 08069C0979G. See redlines. 4) Contact Floodplain Administrator, Marsha Hilmes-Robinson at 224-6036, mhilmesrobinson@fcgov.com with any questions. - Topic: General Number: 1 Issue Originated: 05/17/2011 06/21/2011: Reminder 05/17/2011: The final signed off -site drainage easement is required before signing of mylars Number: 2 Issue Originated: 05/17/2011 06/21/2011: Reminder 05/17/2011: Written approval is required from Larimer County for the outfall draining into the Lincoln Channel before signing of mylars. Number: 3 Issue Originated: 05/17/2011 06/2412011: Please add short paragraph in text of the report describing how overflow spill will flow into existing detention pond to the east. 05/17/2011: An analysis of the emergency spill is needed up to Lincoln Avenue. The City requires that the spill get to a right-of-way without inundating any structures. 5 Staff Review Letter Generated: 6/28/2011 at 1:52 pm aty of Fort Collins Department: PFA Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov. com Contact: Carie Dann, 970-219-5337, CDANN(Myoudre-fire.org Topic: General Number: 2 Issue Originated: 05/18/2011 05/18/2011: REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. 4 Have appropriate maintenance agreements that are legally binding and enforceable. 4 Be designated on the plat as an Emergency Access Easement. 4 Maintain the required minimum width of 20 feet throughout the length of the fire lane (26 feet on at least one long side of the building when the structure is three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. KNOX PADLOCKS: The two proposed gates, if locked, must be equipped with a Knox Padlock. PFA sells these padlocks for cost in the Fire Prevention Bureau. ALSO, the proposed EAE is acceptable. Approved signage (NO PARKING - FIRE LANE) must be installed prior to CO. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D Number: 3 Issue Originated: 05/18/2011 05/18/2011: FIRE SPRINKLERS No fire line is shown on the utility plan. Number: 4 Issue Originated: 05/18/2011 05/18/2011: ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). If the numerals are mounted on a side of the building other than the side off of which it is addressed, the street name is required to be posted along with the numerals. At such time buildings 2 and 3 are approved and constructed, we can discuss addressing of these buildings. 2006 International Fire Code 505.1 ►R11t1#77MIP 05/18/2011: FDC CLEARANCE: Issue Originated: 05/18/2011 The fire sprinkler connection must be clear of all vegetation (other than ground cover) and any other obstruction, within 36 inches. Please note this clearance for the planting areas. Staff Review Letter Generated: 6/28/2011 at 1:52 pm City of Fort Collins Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish(&fc4ov.com Topic: General Number: 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Issue Originated: 05/17/2011 06/17/2011: 05/17/2011: Owner is responsible for additional square footage charges that were not previously paid by the Vanworks Sub 2nd Filing. Number: 2 Issue Originated: 05/17/2011 06/17/2011: 05/17/2011: Contact Light & Power with any change in power requirements. Owner will need to submit a C-1 form and a One -line diagram to Light & Power for any additional increase in power requirements. Electric Capacity Fees and Building Site charges will apply for any increase in power. Number: 3 Issue Originated: 05/17/2011 06/17/2011: 05/17/2011: Any relocation or modification to existing electric facilities will be at the owners expense. Department: PFA Contact: Carie Dann, 970-219-5337, CDANN(Maoudre-fire.orci Topic: General Number: 1 Issue Originated: 05/18/2011 05/18/2011: WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: 6 Commercial and multi -family dwellings 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter 4 Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: No existing hydrants are shown on the plans. The existing hydrant near the entrance to the site meets the distance requirements for the existing structure and the phase 2 proposed building. However, we need to meet to discuss and resolve water -supply issues for the phase 3 structure. 2006 International Fire Code 508.1 and Appendix B 3 Staff Review Letter Generated: 6/28/2011 at 1:52 pm aty of F6rt Collins Department: Engineering Development Review Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Contact: Andrew Carney, 970-221-6501, acarney(cDfcgov.com Topic: General Number: 4 Issue Originated: 05/17/2011 06/21 /2011: The easements are being reviewed by the technical services department, I will update if any corrections need to be made. To finalize the dedication, the dedication fee ($250) will need to be paid, a deed of dediction will need to be completed (please contact me for the blank deed) and a check will need to be provided for recording the document at Larimer County. 05/18/2011: To finalize the off -site drainage easement and the Emergency Access Easement, a legal description and an exhibit showing the easement will need to be submitted and reviewed. Also, a Deed of dedication will need to be completed and submitted along with the TDRF easement dedication fee and the applicable recording fees to record the final document with Larimer County. [4/6/10] Letter of intent received. Final easement will be needed prior to approval of plans. Processing and filling fees will be due for the processing and filing of off -site easements. [10/12/09] An off -site easement for the storm pipe is needed with this design. A letter of intent from the off -site property owner(s) is needed prior to being able to schedule this project for hearing. Number: 10 Issue Originated: 05/23/2011 06/21/2011: Comment carried forward as a reminder. 05/23/2011: To finalize the project, both a Development Agreement (DA) and a Development Construction Permit (DCP) will be needed. To begin both please contact Andrew Carney (221-6501, acarney@fcgov.com) to obtain applications for both documents, as well as, more information regarding both processes. Number: 11 Issue Originated: 05/23/2011 06/22/2011: As far as I know, there is no plat being completed with this project. So the EAE will need to be dedicated via seperate document similar to the other easements. Please submit the legal and exhibit for review. 05/23/2011: To finalize the emergency access easement, a legal description and an exhibit showing the easement will need to be submitted and reviewed. Also, a Deed of dedication will need to be completed and submitted along with the TDRF easement dedication fee and the applicable recording fees to record the final document with Larimer County. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex(a)fcgov.com Topic: General Number: 1 05/10/2011: No comments. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish(a)fcgov.com 2 Issue Originated: 05/10/2011 Staff Review Letter Generated: 6/28/2011 at 1:52 pm Fort Coltins June 28, 2011 Troy Jones MTA Planning & Architecture 171 N. College Avenue Fort Collins, CO 80524 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970, 224.6134 - fax fcgov.com City staff and outside reviewing agencies have reviewed your submittal for Colorado Iron & Metal, and we offer the following comments: Department: Current Planning Contact: Emma McArdle, 970-221-6206, emcardle(&fcgov.com Topic: General Number: 25 Issue Originated: 06/28/2011 06/28/2011: We will need to add flags in Accela when building permits are filed for phase 3 and 5. Department: Engineering Development Review Contact: Andrew Carney, 970-221-6501, acamev(d-)fcgov.com Topic: General Number: 3 Issue Originated: 05/17/2011 06/21/2011: The easements are being reviewed by the technical services department, I will update if any corrections need to be made. To finalize the dedication, the dedication fee ($250) will need to be paid, a deed of dediction will need to be completed (please contact me for the blank deed) and a check will need to be provided for recording the document at Larimer County. 05/18/2011: To finalize the off -site grading/slope easement, a legal description and an exhibit showing the easement will need to be submitted and reviewed. Also, a Deed of dedication will need to be completed and submittedalong with the TDRF easement dedication fee and the applicable recording fees to record the final document with Larimer County. [4/6/10]Letter of intent received. Final easement will be needed prior to approval of plans. Processing and filling fees will be due for the processing and filing of off -site easements. [10/12/09] Need to show how the grading at the SW corner of the site will tie back into existing grades. It appears that off -site grading or construction easements will be needed. Letters of intent to grant these easements will need to be provided prior to the project being scheduled for hearing. [5/12/09] Few grade lines at the property lines do not tie to anything. Staff Review Letter Generated: 6/28/2011 at 1:52 pm Cit of Planning, Devinopment & Transportation FCommunity Development & Neighborhood services Fort Collins ma�yy,� 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 Phone: (970)221-6760 � Letter of Transmittal To: Date: Project: 1* From: ins 7C 1S TgA,NSMITTED HEREWITH ARE: Redlined Utility Plans See attached sheet for number of copies to resubmit ❑ Redlined Storm Drainage Report ❑ Development Agreement Please sign, seal, date, and return all copies of this agreement. Changes in the agreement take two (2) days to process if they are acceptable to the City. Please take this into account in your schedule. Again, all copies must be returned. ❑ Original Mylars Needing Revisions Please return with the "post -it" notes intact. ❑ Original Mylars with City Signatures Please return one (1) mylar and signed and stamped blueline print copies for our files. ❑ Development Construction Permit Application Please fill out and return to the front counter with application fee and all required attachments. ❑ Development Construction Permit for your Signatures Please sign (but do not date) and return. ❑ Attached is your Copy of the Development Construction Permit ❑ Draft Development Agreement For your review and comments. Please Call with your comments or questions. Let me know if everything is okay. ❑ Attached is your Copy of the Development Agreement Other. `__ 7