HomeMy WebLinkAboutVALLEY STEEL ADDITION PDP - TYPE 1 - 34-05 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE (5)cc: Dan DeLaughter, Engineering
Clark Mapes, Advance Planning
Stewart 8s Associates, Inc.
Randy Wright, Quality Wholesale, Building Products
Current Planning file #34-05
Page 7
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Utility plans
Number:.34 Created: 10/ 11 / 2005
[12/27/05] Include specifications for the insulation so that contractor
knows it's not available a Home Depot or similar home improvement centers
[ 10 / 11 / 05] Provide insulation for all portions of the sanitary sewer with
less than 4 feet of cover. Insulation must be the type specifically made for
underground applications. Submit design of the insulation for review.
Include specifications for the insulation on the plans. (I have a contact
name for product and design information.) THIS IS A FINAL COMPLIANCE
ITEM.
Topic: Water/WW plans
Number: 79 Created: 12 / 27/ 2005
[ 12 / 27 / 05] Is gas line moving out into the street? If so, provide 10 feet of
separation to sewer and check that sewer is a minimum of 10 feet from the
water main.
Please contact Clark Mapes of the Advance Planning Department, at 221-
6225, to see if he has any outstanding concerns or comments regarding the
Landscape Plan for the Vallev Steel Addition.
Be sure and return all red -lined plans if / when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
Page 6
•
R.
•
Number: 76
f 12 / 23 / 051 Details are
Created: 12 / 23 / 2005
some dimensions.
Topic: Technical Services
Number: 54 Created: 10/ 12/2005
[12/23/05]
[10/ 12/05] Technical Services would like to know how the ROW is
dedicated along Hickory Street.
Stewart°8associatesResponseRlssue resolvecsltowrion ptat,_
yam,
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Erosion Control
Number: 82 Created: 12/ 28/ 2005
[12/28/051
1. Please do a complete sediment/erosion control submittal with all the
required elements, including the correct plan notes, project .schedule,
PS and EFF calculations, etc. Plan will be reviewed at that time.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Floodpiain
Number: 61 Created: 12/ 23/ 2005
[12/23/05] No more floodplain comments.
Stewart '8a ,Assoctates Response: " cknowiedgeat
Topic: Stormwater
Number: 62 Created: 12/23/2005
[ 12 / 23 / 05] Please use the City of Fort Collins. standard detail for the water
quality outlet structure. This can be sent to you electronically.
Number: 63 Created: 12 / 23 / 2005
[12/23/05] Please revise detention pond summary table. Basin A and D
show release rates when there is no pond.
Page 5
•
[12/23/05]
Number: 68 Created: 12 / 23 / 2005
[ 12 / 23 / 05] PRPA line shown as WAPA on plat.
Number: 69 Created: 12/ 23/ 2005
[ 12 / 23 / 05] See redlines for legend revisions.
Number: 70 Created: 12 / 23 / 2005
[ 12 / 23 / 05] Drive access radii are not labeled- please add these labels to the
grading plan.
Number: 71 Created: 12 / 23 / 2005
[ 12 / 23 / 05] Label all retaining walls on plans.
Stewcii-t,�� Associates Res _onset Labeted=on detazt"slceeth=8: I
Number: 80 Created: 12 / 28/ 2005
[ 12 / 28 / 05] Please provide some spot elevations on the grading and
drainage plan in the area around the dumpster and parking. We want to be
sure that the ramp wall doesn't impede drainage to the detention pond.
Number: 81 Created: 12 / 28/ 2005
[ 12 / 28 / 05] Light and Power has stated that conduit does not need to be
provided on this site for future undergrounding. This will be done by the
city in the future.
Topic: Site & Landscape Plan
Number: 74 Created: 12 / 23 / 2005
[ 12 / 23 / 051 No north arrows shown on Site and Landscape Plans.
Page 4
e. 2501 (If needed) Sidewalk Widening Detail
5 ewart`Sz �lssoctate�s Response ���Notneedeai :see comment725
Number: 51 Created: 10/ 12/2005
[12/23/051 repeat
[10/ 12/05] Reference current/updated soils investigation report on cover
sheet.
Number: 52 Created: 10/ 12/2005
[ 12 / 27 / 05] It appears that the west access to the site is flat. How will this
drain?
[10/ 12/05] Show curb return details including spot elevations to verify that
minimum grades are met (FC).
Number: 64 Created: 12 / 23/ 2005
[ 12 / 23 / 05] ;Signature block should be on every page.
Number: 65 Created: 12 / 23 / 2005
[12/23/05] We will need to resolve the issue of the gas/electric/sewer
locations. Minimum separation between gas and sewer is 10' (some
flexibility on this if it is absolutely impossible).
Number: 66 Created: 12/ 23/ 2005
[ 12 / 23 / 05] Please show the power to be undergrounded with the proposed
location of the new line.
Number: 67
Created: 12/ 23/ 2005
Page 3
f
Topic: General
Number: 21 Created: 9/ 8/ 2005
[ 12 / 27 / 05] Power line easement on the north part of the site not shown on
construction plans.
[9/8/05] Show all easements needed for the development on both plat and
plans. Detention areas need to be included in drainage easements.
Number: 39 Created: 10/ 12/2005
[12/ 19/05]
[10/ 12/05] Label and dimension the right-of-way (ROW) along Hickory
Street for the portion to the east of your property. We need to be sure that
the ROW has actually been dedicated before the sewer can be built.
Number: 50 Created: 10/ 12/2005
[12/27/05] 1602 should be modified to include tree grates. You can also
remove the sidewalk widening detail since all sidewalk will be new.
[ 10 / 12 / 05] Please provide the following standard details:
a. 1601 Standard Sidewalk
b. 1602 Sidewalk Detail- modified to show tree grates
C. 1603 Access Ramp Details
d. 1607 Access Ramp Scoring
Page 2
STAFF PROJECT REVIEW
City of Port Collins
JCL Architecture Date: 01/05/2006
c/o Justin Larson
201 South College Avenue
Fort Collins, CO. 80524
Staff has reviewed your submittal for VALLEY STEEL ADDITION, FINAL
PLANS TYPE 1, and we offer the following comments:
ISSUES:
Department: Engineering
DeLaughter
Topic: Details
Number: 72
[12/23/051
1. Sheet 6A detail
grading starts.
Issue Contact: Dan
Created: 12/23/2005
provide l' clear flat area behind sidewalk before any
2. Section lines not shown on southwest ramp detail.
Stewart Associates Response Section lines aatded toµ
3. Modify Drawing 1602 to include street trees.
4. Add a plan view of sidewalk showing curbside tree plantings with all
appropriate dimensions. This is on the Landscape Plan but must be in
the construction set as well.
5. You can remove detail # 2501 since all sidewalks will be new (not
widened).
Page 1