HomeMy WebLinkAboutVALLEY STEEL ADDITION PDP - TYPE 1 - 34-05 - CORRESPONDENCE -L
r1L
REVISION ROUTING SHEET
Item: \(G I ley ,S fee I t LA/ - '-e—
Date Received: Planner: .'fie, f-
la
Engineer: bl:- �eL4 yti�
City of Fort Collins
CURRENT: PLANNING
• - • •
• - • - . ; - • • - - •
EMM
Advance Planning
Building Inspection
Engineering Pavement
•Light
& Power
Natural ResourcesPark
Planning
Poudre Fire Authority
Post Office
ROW Planning
evil
Street Oversizing
Technical Services
Traffic Operations
Water & Wastewater
Water Conservation
Xcel
.. .
................
Ditch Co.:
:........
................
Schools: Poudre
Thompson
................
TOTAL To be Submitted
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 56
[ 10/ 12/05] There needs to be some differentiation in the line weights on
the Site & Landscape Plans.
Number 57:
[ 10/ 12/051 Please clarify some of the symbols on the Site & Landscape
Plans.
This development request has been scheduled for an administrative public
hearing on Thursday, November 10, 2005 at 3:30 p.m. at 281 North
College Avenue.
Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Azu�_
Steve Olt
City Planner
cc: Dan DeLaughter
Stewart & Associates
Project File #34-05
Page 5
•
Department: Water Wastewater
Buffington
Topic: Utility plans
Issue Contact: Roger
Number: 33 Created: 10/ 11 /2005
[ 10/ 11 /05] Show and label the ELCO water main in Hickory Street.
Number: 34 Created: 10/ 11 /2005
[ 10/ 11 /05] Provide insulation for all portions of the sanitary sewer with
less than 4 feet of cover. Insulation must be the type specifically made for
underground applications. Submit design of the insulation for review.
Include specifications for the insulation on the plans. (I have a contact
name for product and design information.) THIS IS A FINAL COMPLIANCE
ITEM.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plans
Number: 16 Created: 9/7/2005
[ 10/ 11 /05] Add note to define the connection as shown on the redlined
plans.
[9/7/05] Clearly define all connections to the existing water main.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 2 Created: 8/22/2005
[9/30/051
[8/22/051 There is no building wall articulation along the south and north
elevations - see section 3.5.30)(2)
Number: 3 Created: 8/22/2005
[9/30/051
[8/22/051 Add a note to the landscape notes regarding installation of
landscaping prior to issuance of a CO.
Number: 4
Created: 8/22/2005
[9/30/051
[8/22/051 On landscape plan, there are no foundation plantings being
shown nor are there any street trees being shown along Hickory. Please
review article 3 of the Land Use Code for landscaping requirements.
9-30-05 Landscaping is insufficient. Does not meet tree stocking
requirements, does not meet foundation planting requirements, nor
perimeter requirements.
Page 4
• 0
Number: 53 Created: 10/ 12/2005
[ 10/ 12/051 Please see redlines for additional minor revisions.
Topic: Technical Services
Number: 54 Created: 10/ 12/2005
[ 10/ 12/051 Technical Services would like to know how the ROW is
dedicated along Hickory.
Number: 55 Created: 10/ 12/2005
[ 10/ 12/051 Technical Services comment: The South ROW is not parallel
with the E/W section line.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 32 Created: 10/ 11 /2005
[ 10/ 11 /051 1. Critical facilities are not
allowed in the floodplain. This includes storage or use of hazardous,
flammable, toxic, or water reactive materials. See the definition in Chapter
10 of City Code. - Please describe in the drainage report that there will not be
any materials meeting the critical facilities definition stored or used in this
building. If there are any questions about material storage, please submit a
copy of the Hazardous materials impact analysis and material safety data
sheets for those items. - REPEAT COMMENT
2. The Site Plan and Landscape Plan show an additional line for a City
Floodway that does not exist. These lines have been removed from the
grading and utility plans. Please remove these lines from the site plan and
landscape plan.
3. Please revise the base flood elevation and floor elevation on the site
plan. - REPEAT COMMENT
Topic: Stormwater
Number: 24 Created: 9/9/2005
[ 10/ 11 /051 Project can go to a hearing.
[9/9/05] Project can go to a hearing after building is elevated to the correct
elevation. No more 50% comments. More comments will be presented at
final compliance submittal.
Department: Transportation Planning
Ravenschlag
Topic: Utility plans
Number: 35
[ 10/ 11 /051 No Comments
Issue Contact: Hurt
Created: 10/ 11 /2005
Page 3
STAFF PROJECT REVIEW
City of Fort Collins
JCL Architecture Date: 10/21 /2005
c/o Justin Larson
201 South College Avenue
Studio 205
Fort Collins, CO. 80521
Staff has reviewed your submittal for VALLEY STEEL ADDITION, PDP -
TYPE 1, and we offer the following comments:
ISSUES:
Department:
DeLaughter
Engineering
Issue Contact: Dan
Topic: General
Number: 36 Created: 10/ 12/2005
[ 10/ 12/051 See redlines for remaining scanability issues -minor.
Number: 37 Created: '10/12/2005
[ 10/ 12/051 Repeat: Grading still doesn't tie into existing contours.
Number: 38 Created: 10/ 12/2005
[ 10/ 12/051 Add standard street cut note: "Limits of street cut are
approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street
repair standards."
Number: 39 Created: 10/ 12/2005
[ 10/ 12/05] Label and dimension the ROW along Hickory Street for the
portion to the East of your property. We need to be sure that the ROW has
actually been dedicated before the sewer can be built.
Number: 40 Created: 10/ 12/2005
[ 10/ 12/05] Entry gates to the property must be far enough back from the
road to allow a standard vehicle to stop behind them and not encroach onto
the street or sidewalk (20'?).
Number: 41 Created: 10/ 12/2005
[ 10/ 12/05] Existing features should be shown in a gray or dashed line
type.
Number: 42 Created: 10/ 12/2005
[ 10/ 12/05] Show parking islands around power poles on the overall utility
plan set to match the site plan.
Page 1
•
•
Number: 43 Created: 10/ 12/2005
[10/12/051 What is happening with the sidewalk along Hickory Street?
Please show clearly which sections are to be removed and replaced and
which sections you plan to widen. Any widening must be at least 4' in
width.
Number: 44 Created: 10/ 12/2005
[10/12/051 Include power and gas in your legend.
Number: 45 Created: 10/ 12/2005
[10/12/051 Please indicate on the overall utility plan that a PVC sleeve will
be installed N/S for future power line undergrounding. Please note which
power lines are to be undergrounded by Fort Collins Light & Power.
Number: 46 Created: 10/ 12/2005
[ 10/ 12/051 Show, label, dimension all easements on plat, overall utility
plan.
Please use a concrete hatch pattern for all sidewalk and standard driveway
approaches to back of ROW.
Number: 47 Created: 10/ 12/2005
[10/12/051 Label all existing and proposed utilities. It does not appear that
you've labeled existing gas.
Number: 48 Created: 10/ 12/2005
[10/12/051 Inconsistent line types are used on profile sheets for contours.
Please revise.
Number: 49 Created: 10/ 12/2005
[10/12/051 Show the locations of the transformers on the utility plan set.
Number: 50 Created: 10/ 12/2005
[10/12/051 Please provide the following standard details:
a. 1601 Standard Sidewalk
b. 1602 Sidewalk Detail- modified to show tree grates
c. 1603 Access Ramp Details
d. 1607 Access Ramp Scoring
e. 2501 (If needed) Sidewalk Widening Detail
Number: 51
Created: 10/ 12/2005
[10/12/051 Reference current/updated soils investigation report on cover
sheet.
Number: 52 Created: 10/ 12/2005
[10/12/051 Show curb return details including spot elevations to verify that
minimum grades are met (FC) .
Page 2