Loading...
HomeMy WebLinkAboutVALLEY STEEL ADDITION PDP - TYPE 1 - 34-05 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (4)• 0 FINAL PLAN ROUTING SHEET Item: '.4- ' �- o 057,t�, Va`-( Je4,( G � / k;� QYl ._.. t This project went to ! Public Hearing on h QV, Lo 12( 7 The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Ci[yof Fort Collins CURRENT PLANNING d .1Ulm Advance Planning Building Inspection Engineering Pavement Light & Power Natural Resources Park Planning Poudre Fire Authority ==�MMMMMM Post Office MEKIMMMMMM�MMMM ROW Planning sell Street Oversizing_ Technical Services Traffic Operations Water & Wastewater Water Conservation Xcel Energy County Assessor Ditch Co.: Schools: Poudre Thompson TOTAL To be Submittw-