HomeMy WebLinkAboutVALLEY STEEL ADDITION PDP - TYPE 1 - 34-05 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (4)•
0
FINAL PLAN ROUTING SHEET
Item: '.4- ' �- o 057,t�, Va`-( Je4,( G � / k;� QYl ._.. t
This project went to ! Public Hearing on h QV, Lo 12( 7
The following table lists final plan submittal requirements for this project.
A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced.
Ci[yof Fort Collins
CURRENT PLANNING
d
.1Ulm
Advance Planning
Building Inspection
Engineering Pavement
Light & Power
Natural Resources
Park Planning
Poudre Fire Authority
==�MMMMMM
Post Office
MEKIMMMMMM�MMMM
ROW Planning
sell
Street Oversizing_
Technical Services
Traffic Operations
Water & Wastewater
Water Conservation
Xcel Energy
County Assessor
Ditch Co.:
Schools: Poudre
Thompson
TOTAL To be Submittw-