Loading...
HomeMy WebLinkAboutSOLAR VILLAGE MAPLE PDP TYPE 1 - 23-07 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (8)f3� %os�3i Transportation Development review Fee Date Received/ Paid 5' (" f Total Amount Paid Citvo( Fort Collins Project Name: �1 V Project Location: T„/,� Date: n Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate requests). Fee stricture amount due G Overall Development Plan (ODP) $500 each ;. Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each ,71 Additional round of review $ 500 each Annexation $20 x _ acres = _ + $250 = Minor Amendment $250 each Major Amendment $2,500 each D Re -zone $200 each Modification to Land Use Code $200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each -. Road Projects acres (of roadway) X $250 = F Vacation of Easement(s) *** # of vacations _ X $400 = Vacation of Right(s)-of-Way *** # of vacations _ X $800 = Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications X $250 = *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X $160 = Multifamily or other residential units $115 per unit _ZjE� # of units X S 115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot ft X $0.?5 , 1 Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre _ acres X $ 250 =, Project fee $2,000 each $? 44Q Total of above amounts 3 If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 +'h (the amount over 30,000 _ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the .fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP S - Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: Z: Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): _Z Non residential building square footage: 5.3 �r sq ft Gross Acreage: acres General Information: Owners Name(s): A! 1--. '-'>_A,7_7 Street address: iz t_ City/State/Zip: Telephone: �?� �4" Fax: �L� -,�, i�-_% Applicants/ Consultants Firm Name: Contact: Street address City/State/Zip: r am; -­);! 1" Telephone: 17 , .4:4 S71/) Fax: .J %^ 4 -7) Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): , . � —' %jJ lire') J i Signature: Telephone: 7,�L-L-� cc: Christie White, Engineering Development Review Engineering