Loading...
HomeMy WebLinkAboutPROVINCETOWNE FILING FOUR - FDP - FDP110020 - CORRESPONDENCE -Comment Number: a comment Originated: 11/29/2011 11/29/2011: The line showing the phasing also needs to be adjusted on the plans. Topic: Plat Comment Number: 2 Comment Originated: 11/29/2011 11/29/2011: Need to identify who is to own and maintain Outlot A. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex(cDfcgov.com Topic: General Comment Number: 1 11/28/2011: No comments. Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(a)fcgov.com Topic: General Comment Originated: 11/28/2011 Comment Number: 1 Comment Originated: 11/21/2011 11/21/2011: Comments by JR Engineering indicate that Light & Power construction has already begun on several lots. Light & Power construction on an adjacent site has begun which will provide a source of power to Provincetowne Filing Four. Light & Power has not invoiced for filing four, the electric system has not been designed, and construction has not begun. Please contact Doug Martine in Light & Power Engineering at 224-6152. Department: Technical Services Contact: Jeff County, 970-221-6588, lcountycDfcgov.com Topic: Construction Drawings Comment Number: 7 11/29/2011: No comments. Topic: Landscape Plans Comment Number: 6 11/29/2011: No comments. Topic: Plat Comment Number: 1 11/29/2011: The subdivision boundary closes. Comment Originated: 11/29/2011 Comment Originated: 11/29/2011 Comment Originated: 11/29/2011 This completes our comments at this time. Please contact me or the person commenting if you have questions regarding any comment or concern. Sincerely, sow Olt Steve Olt Project Planner Fo`'`rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentre view November 30, 2011 Cole Evans Provincetowne West LLC 2725 Rocky Mountain Ave Fort Collins, CO 80538 RE: Provincetowne Filing Four, FDP110020, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Steve Olt, at 970-221-6341 or soltnafcgov.com. Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221.6573, slangenberger(ED ov.com Topic: Construction Drawings Comment Number: 3 Comment Originated: 11/29/2011 11/29/2011: The first note on sheet 3 is incorrect. Only lots 8-11 will be eligible for building permits with Provincetowne Filing Three Phase 3D. Lot 7 can not be included as a part of this because not all the frontage of the lot will be constructed with Phase 3D as required for a building to be eligible for building permit, also in accordance with section 3.6.2(C) of the LUC for this lot to take access off of this stub (a house with a driveway) a temporary turnaround would need to be dedicated and provided at the end of the street. If you really want to include lot 7 then we will need to revise Phase 3D, showing the additional frontage that is to be constructed, relocate the FH (may not be necessary don't know for sure where it got placed), pay the additional inspection fees, dedicate a temporary turn around easement and construct a gravel turn around. Topic: General Comment Number: 1 Comment Originated: 11/29/2011 11/29/2011: The development agreement has been drafted and is with the attorneys office for review. As soon as I receive it back I will forward it on.