Anne Aspen - Penny Flats: Final Mylar Check Set
From:
"Dan Rotner" <drotner@cobumdev.com>
To:
"Anne Aspen" <AAspen@fcgov.com>
Date:
08/18/2006 4:40 PM
Subject:
Penny Flats: Final Mylar Check Set
Anne:
Attached is a pdf draft of the final site plan set for your review prior to the creation of mylars. Landscape plans will
be submitted today (or have been submitted) by Jim Sell Design. For your reference, the following changes have
been accomplished since the submittal of 06-21-06:
Sheet SA1
Drawing list has been revised to exclude the civil construction drawings and the photometric drawings. The civil
construction drawings have their own signature cover sheet and signature lines and stand alone. -Per our
discussion, the photometric drawings will not be included in the mylar set pending redesign.
Idt� Fw4.yy,*nPf fir+ r�e�a+ w%-� Gvwe.»%�fL t adaCc�✓�o
SheetSA2 L911vile ri1 b,t
Floor area table for Building 5 was corrected to remove commercial floor areas duplicated in the residential floor
area column. Floor area totals remain unchanged.
Sheet SA3.1
- Central Fire Control Room for the project has been added off the drive aisle behind Building 5 in place of one
parking space
- Underground parking access ramps and curb cuts were incorrectly noted as 24' not 22' as has been drawn on
,our set and the civil engineering set. These dimensions have been revised on the current drawings to 22'.
-Pedestrian access aisles at circulation and accessible parking have been clarified
Sheet SA3.2
- Parking count has been corrected and updated. In the end we picked up 3 spaces which is nice.
Bollards and striping have been added at back-up and ped. circulation.
Sheet SA4
-Unchanged
Sheet SA5
/ -Minor revisions to alley elevation associated with addition of central fire control room
Sheet SA6
-Unchanged
Sheet SA7
-Unchanged
Thanks again for accepting these in .pdf format for the check. It saved time and fuel.
Call me with any questions or problems.
Dan
Daniel R. Rotner, AIA I Coburn Development, Inc. 11811 Pearl Street I Boulder, CO 80302 1 303 442 3351 x1113