HomeMy WebLinkAboutOTTER BOX DISTRIBUTION/WAREHOUSE EXPANSION - PDP & APU - 17-10 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTErosion Control Cost Estimate Project Number: 236-002 Location: Fort Collins, CO Date: July 13, 2010 Total Disturbed Acres: 1.9 Estimated Unit Total EROSION CONTROL MEASURE Units Quantity Price Price Wattle Inlet Filters each 3 $100.00 $300.00 Silt Fencing L.F. 325 $1.50 $487.50 Wattle Dikes each 2 $125.00 $250.00 Vehicle Tracking Control Pads each 1 $300.00 $300.00 TOTAL = $1,337.50 AMOUNT OF SECURITY = 1.5 x $1,337.50 = TOTAL = $2,006.25 -OR- COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 = TOTAL = $2,850.00 (WHICHEVER IS GREATER) REQUIRED AMOUNT OF SECURITY = $2,850.00 0 ATTACHMENT 4 EROSION CONTROL SURETY CALCULATION CALCULATIONS FOR RIPRAP PROTECTION AT PIPE OUTLETS Project: 236-002 Date: 7113/10 By: ATC INPUT CALCULATE -. OUTPUT Storm Line/Culvert Label Design Discharge (cfs) Culvert Parameters Y ' Tailwater Depth (ft) Circular Pipe (Figure MD-21) Rectangular Pipe (Figure MD-22) Expansion Factor 1/ 2tan ( q) (From Figure MD-23 or MD-24) Froude Parameter Q/D21 Max 6.0 or Q/vVFI15 Max 8.0 Urban Drainage pg MD-107 Ri ra y p Type (From Figure MD-21 or MD-22) Spec Min. Length of Riprap (ft) Spec Min. Width of of (ft) 2'dso. Depth p of Riprap Ri ra (ft) for L/2 Circular Box Culvert A,=QN (ft) L= 1/(2lanq)' [AUYt)-W] (ft) D or Da, Pipe Diameter (ft) H or H„ Culvert Height (ft) W, Culvert Width (ft) Y,/D ,s Q/p a Q/p Y,/H os Q/WH Roof Drain Oulfall 4.00 0.83 0.33 0.40 5.26 6.32 N/A N/A 2.00 6.32 0.80 3.14 Type L 4.00 4.00 1.5 Parking Lot Drain 2.10 1.25 0.50 0.40 1.50 1.20 N/A N/A 4.10 1.20 0.42 5.00 Type L 5.00 5.00 1.5 J • C1 ATTACHMENT 3 RIPRAP CALCULATIONS W AT-1<2. QJ4L-t7j }po r,�t, STAGE STORAGE TABLE ELEV AREA (sq. ft.) DEPT H (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) 4,922.000 1.17 N/A N/A 0.00 N/A 0.00 4,922.200 64.73 0.200 6.59 6.59 4.97 4.97 4,922.400 225.82 0.200 29.05 35.64 27.43 32.40 4,922.600 477.00 0.200 70.28 105.93 68.73 101.14 4,922.800 751.82 0.200 122.88 228.81 121.84 222.98 4,923.000 1,027.97 0.200 177.98 406.79 177.26 400.24 4,923.200 1,305.57 0.200 233.35 640.14 232.80 633.05 4,923.400 1,585.44 0.200 289.10 929.24 288.65 921.69 4,923.600 1,867.19 0.200 345.26 1274.50 344.88 1266.57 4,923.800 2,152.00 0.200 401.92 1676.42 401.58 1668.15 4,924.000 2,442.02 0.200 459.40 2135.83 459.10 2127.25 4,924.200 2,739.53 0.200 518.16 2653.98 517.87 2645.12 4,924.400 5,081.09 0.200 782.06 3436.04 770.10 3415.22 4,924.600 6,113.70 0.200 1119.48 4555.52 1117.89 4533.11 4,924.800 7,246.21 0.200 1335.99 5891.51 1334.39 5867.50 4,925.000 8,172.74 0.200 1541.89 7433.41 1540.97 7408.47 n I� • WATER QUALITY POND DESIGN CALCULATIONS Southeast Water Quality Pond Project: 236-002 By: ATC Date: 7.7.10 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 0.990 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 95.00 <-- INPUT from impervious talcs BASIN IMPERVIOUSNESS RATIO = 0.9500 <— CALCULATED WQCV (watershed inches) = 0.447 <— CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.044 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WO Depth (ft) = 1.800 <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a(in) = 0.131 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 7/16 <-- INPUT from Figure 5 n = 1 <-- INPUT from Figure 5 t (in) = 1 /4 <— INPUT from Figure 5 number of rows = 4 <-- CALCULATED from WQ Depth and row spacing STAGE STORAGE TABLE ELEV AREA (sq. ft.) DEPT H (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) 4,920.600 12.62 N/A N/A 0.00 N/A 0.00 4,920.800 67.22 0.200 7.98 7.98 7.26 7.26 4,921.000 137.79 0.200 20.50 28.48 20.08 27.35 4,921.200 212.14 0.200 34.99 63.48 34.73 62.07 4,921.400 292.44 0.200 50.46 113.94 50.24 112.32 4,921.600 386.01 0.200 67.84 181.78 67.63 179.95 4,921.800 496.03 0.200 88.20 269.98 87.97 267.92 4,922.000 624.99 0.200 112.10 382.09 111.85 379.77 4,922.200 765.98 0.200 139.10 521.18 138.86 518.63 4,922.400 914.09 0.200 168.01 689.19 167.79 686.42 4,922.600 1,067.86 0.200 198.19 887.39 198.00 884.42 4,922.800 1,244.75 0.200 231.26 1118.65 231.03 1115.45 4,923.000 1,422.22 0.200 266.70 1385.34 266.50 1381.95 4,923.200 1,610.36 0.200 303.26 1688.60 303.06 1685.02 4,923.400 1,810.29 0.200 342.06 2030.67 341.87 2026.89 4,923.600 2,023.08 0.200 383.34 2414.00 383.14 2410.03 4,923.800 2,251.28 0.200 427.44 2841.44 427.23 2837.26 4,924.000 2,582.32 0.200 483.36 3324.80 482.98 3320.24 • (WATER QUALITY POND DESIGN CALCULATIONS Southwest Water Qualitv Pond Project: 236-002 By: ATC RED STORAGE & OUTLET WORKS: BASIN AREA = 0.750 <-- INPUT from impervious talcs BASIN IMPERVIOUSNESS PERCENT = 85.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.8500 <-- CALCULATED WQCV (watershed inches) = 0.362 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.027 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = 2.200 <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a (in2) = 0.061 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1 /4 <— INPUT from Figure 5 n = 1 <-- INPUT from Figure 5 t (in) = 1/4 <-- INPUT from Figure 5 number of rows = 6 <-- CALCULATED from WO Depth and row spacing i ATTACHMENT 2 WATER QUALITY POND CALCULATIONS DEVELOPED CONDITIONS RUNOFF COMPUTATIONS Project: 236-002 Date: 7.12.10 By: ATC Design Point Basins Area, A acres 2-yr Tc min 100-yr T� in C2 C100 Intensity, 12 in/hr Intensity, Itoo in/hr Flow, Q2 cfs Flow, Qioa cfs 1 1 0.21 5.0 5.0 0.95 1.00 2.85 9.95 0.6 2.1 2 2 0.14 5.5 5.1 0.25 0.31 2.85 9.95 0.1 0.4 3 3 0.40 5.0 5.0 0.95 1.00 2.85 9.95 1.1 4.0 4 4 0.99 5.0 5.0 0.95 1.00 2.85 9.95 2.7 9.8 • DEVELOPED CONDITIONS 100-YR TIME OF CONCENTRATION COMPUTATIONS _Fort Collins. Colorado Overland Flow, Time of Concentration: T - 1.87(l.1-C*Cf)�-L SY3 Gutter/Swale Flow, Time of Concentration: Tt=L/60V Tc = T; + Tt (Equation RO-2) Intensity, i From Figures 3.3.1-2 (Area II) Velocity (Gutter Flow), V = 20•S (Equation R0-4) Velocity (Swale Flow), V =15•S h Rational Equation: Q = CIA (Equation Project: 236-002 Date: 7.12.10 By: ATC Overland Flow Gutter Flow Swale Flow Time of Concentration Design Point Basins C'CT Length, L ft Slope, S % Ti min Length, L ft Slope, S % Velocity, V ft/s T, min Length, L ft Slope, S % Velocity, V Otis) T, min 100-YR T° min 1 1 1.00 40 2.0 0.9 60 0.6 1.55 0.6 0 0.0 0.00 N/A 5.0 2 2 0.31 30 4.0 5.1 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.1 3 3 1.00 156 0.5 2.9 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 4 4 1.00 150 0.5 2.8 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 0 • DEVELOPED CONDITIONS 2-YR TIME OF CONCENTRATION COMPUTATIONS Fort Collins, Colorado Overland Flow, Time of Concentration: T = 1. 87(1.1 - C * Cf Sy Gutter/Swale Flow, Time of Concentration: Tt=L/60V Tc = Ti + Tt (Equation RO-2) Intensity, i From Figures 3.3.1-2 (Area II) Velocity (Gutter Flow), V = 20•S (Equation RO-4) Velocity (Swale Flow), V = 15•S /' Rational Equation: Q = CiA (Equation Project: 236-002 Date: 7.12.10 By: ATC Overland Flow Gutter Flow Swale Flow I Time of Concentration Design Point Basins C'Cf Length, L (ft) Slope, S (%) Ti (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2_ R T. (min) 1 1 0.95 40 2.0 1.4 60 0.6 1.55 0.6 0 0.0 0.00 N/A 5.0 2 2 0.25 30 4.0 5.5 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.5 3 3 0.95 156 0.5 4.3 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 4 4 0.95 150 0.5 4.2 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 C] • DEVELOPED COND. COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Character of Surface Streets, Parking Lots, RoolS, Alleys, and Drives: Asphalt................................................................................. Concrete.............................................................................. Gravel.................................................................................. Roofs.................................................................................. Lawns and Landscaping SandySoil............................................................................ Clayey Soil............................................................................ Runoff Coefficient Percentage Imperviousness Project: 236-002 Date: 7.12.10 By: ATC 2-year Cl = 1.00 100-year Cl = 1.25 0.95 100 0.95 90 0.50 40 0.95 90 0.15 0 0.25 0 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3 Basin ID Basin Area (s.f.) Basin Area (acres) Area of Asphalt Streets, Parking Lots, and Alleys (sf) Area of Roofs, Walks, and Driveways (sf) Area of Gravel Parking and Drives (sf) Area of Lawn and Landscape (sf) 2-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Impervious 1 9002 0.21 9002 0 0 0 0.95 1.00 100.00 2 6096 0.14 0 0 0 6096 0.25 0.31 0.60 3 17600 0.40 0 17600 0 0 0.95 1.00 90.00 4 42991 0.99 10651 32340 0 0 0.95 1.00 92.48 -•-- ••••••••• UoFpgan U, wn.,i c.c, navc upon yivupcu luyeuu7l M MU Abplltlll wiumn CJ • • ATTACHMENT 1 DEVELOPED DRAINAGE CALCULATIONS • 0 floodplain and floodway boundaries shown on the Drainage Exhibit are consistent with the FIRM. The base (100-year) flood elevation in the vicinity of the proposed structure is 4925.00 which is referenced to the City of Fort Collins NGVD 29. The finished floor of the proposed structure is at elevation 4929.42, allowing the regulatory flood protection elevation (minimum 2-feet above base flood elevation) to be met. All HVAC will also exceed the regulatory flood protection elevation. The proposed structure is located outside of the 100-year floodplain boundary. Proposed use of the structure is a warehouse facility. The regulatory half -foot floodway also encroaches the site and is delineated on the Drainage Exhibit. No fill is proposed within the half -foot floodway. A floodplain use permit will be required for each structure and each site construction element (water quality pond, bike path, parking lots, utilities, etc.) in the floodplain. Additionally, FEMA elevation certificates must be completed and approved for any structures in the floodplain prior to issuance of Certificate of Occupancy. The development will be in compliance with all applicable floodplain regulations per Chapter 10 of City Code. Please see attachments 1 through 4 for all pertinent drainage calculations for the proposed construction: Attachment 1- Developed drainage calculations. Attachment 2 - Water quality pond calculations. Attachment 3 - Riprap calculations. Attachment 4 - Erosion control surety deposit calculations. If you should have any questions as you review this report, please feel free to contact US. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PE • NORTHERN 200 S. ColADDRESlllege Ave. Suite 100 PHONE: 970.221.4156 WERSITE: ENGINEERING Fort Collins, CO60524 FAX:970.221.4159 www.northernengineering.com July 14, 2010 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Addendum to Final Drainage Report — Interchange Business Park Otterbox Warehouse Expansion Dear Staff: Northern Engineering is pleased to submit this Addendum to the Final Drainage Report for Interchange Business Park dated April 13, 2001. The Otterbox Warehouse Expansion will occur within Lots 10 and 11 of Interchange Business Park. The expansion will consist of the addition of warehouse space to the current Otterbox facility located within Lots 9 and 10 of Interchange Business Park. In addition to construction of the warehouse addition, associated parking space and utilities will be constructed with the expansion. Also, expansion/modification to the existing water quality pond, at the rear of the building, will be constructed. A new water quality pond will be constructed at the northwest corner of the property as well. The expanded/modified pond at the rear of the building will consist of the addition of volume by grading. Also a modified outlet structure, consisting of the addition of a standpipe with water quality holes, will be constructed. The new water quality pond at the northwest corner of the property will be constructed as a standard 40-hour extended detention basin. In conformance with the approved report for Interchange Business Park, water quality enhancement is required. However, detention is not required with the Interchange Business Park development, due to its proximity to the Boxelder Creek major drainageway. The Boxelder Creek 100-year floodplain encroaches the project site and is delineated on the Drainage Exhibit (see back map pocket). FEMA FIRM Panel Number 1003 for Larimer County (LOMR dated 2/22/2010) is referenced in this study, and delineation of