HomeMy WebLinkAboutTOLMAR SUBDIVISION (BLDG EXPAND.) - PDP - 38-07 - CORRESPONDENCE - (13)Mr. Jay Barber, October 26, 2007
Page 2 of 2
We would like to thank you for your time and effort in reviewing these plans and we look
forward to a smooth Final submittal process. If you have any questions or comments, please
contact us at 970.491.9888.
Prepared by:
Ken Witty
Design Engineer
Reyiewe by:
c
John Meyers Jr.
Project Lead
X:\3950000.all\3958100\Word\Letters\Responsse to commentst.doc
February 18, 2008
Steve Olt and City Review Staff
City of Fort Collins
700 Wood Street / 281 N. College Ave.
Fort Collins, CO 80521
Re: Response to comments from staff project review received 1/24/08 for TOLMAR
SUBDIVISION (701 CENTRE AVE. EXPANSION)
JR Project 39581.00
Dear Mr. Olt and City Review Staff,
This letter serves as the response to comments we received from the staff project review
conducted by the City of Fort Collins 1-24-08. The original comment letter has been attached
and used as a reference to the comment number listed above each comment.
Number 19:
The requested temporary asphalt patch was added in this area. pN ,y �qfj
Number 37. �.Vvc1 `((__'��
Plat was revised to note the existing New Mercer Easement -- sj t� eyj cw '^
Number 16. fix arpmak
Detail 701 and 1602 were added to the detail sheets — bh u-iiu-6t r6u-0�2
Number 17.
Per discussions with the city, a note stating, "ALL DETAIL RE ONSITE UNLESS
OTHERWISE NOTED" was added. -- Ors
Number 9:
The label for the sign was removed. -- Dh u�i,�✓
Number 40:
Appropriate text masking was preformed. r.` %rQ
Number 42: `
The storm line alignment was revised to provide clearance from the b ilding. —
bK- !/�^ lo�u,� f�► CU1�NOC �O.�eu�1.1�1P,�twY�J.
Number 25:
The corrected existing service water line was added to the plans and a proposed method of re-
routing was provided. /1r\ al'UC61 JF(M4 7