Loading...
HomeMy WebLinkAboutTOLMAR SUBDIVISION (BLDG EXPAND.) - PDP - 38-07 - CORRESPONDENCE - (16)It is probable that City staff will be requesting mylars of the appropriate documents when this item is discussed at staff review on Wednesday morning, March 26th. Be sure and return all red -lined plans if/when you re -submit Final Plans. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yo.tirs Truly, Steve Olt, City's Project Planner cc: Susan Joy W.P. Carey and Co., LLC Planning & Zoning file #38-07A Page 4 Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Drainage report Number: 48 Created: 3 / 25 / 2008 [3/25/08] Please provide a reference for the original drainage report for the Atrix Labs site in the addendum. Explain how water quality is being addressed with the proposed addition. Does the pond have a water quality outlet structure and was it designed to handle this addition? Please add a discussions the addendum. �4�r. C ,��.��^^►►�� �.' Q r' "-J r^CwtA1 G1/ a-r-t A PL4 SG Topic: Utility Plans 04 7�4 �( 4 p t, " Number: 49 Created: 3 / 25 / 2008 [3/25/08] Please add maintenance notes to the pipe profile sheets stating that the owner shall be responsible for maintaining the storm sewers on this site. A note should also be added stating that all storm sewer construction shall be inspected by the City. Specify that all storm sewers shall have water tight joints in compliance with ASTM C443 standards. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 25 Created: 12 / 26 / 2007 [3/25/08] The re-route shown on the plans to too close to the UG electric. If moved south to provide separation, the re-route is too close to the building excavation, and the integrity of the thrust block at the 45-degree bend is jeopardized. Has consideration been given to starting the re-route in the street north of the curb and gutter? [ 1 / 22 / 08] The alignment of the fire line has been checked in the field and extends onto the site perpendicular to the water main in the street. As such, re-routing of the fire line will likely be needed prior to the building expansion to the north in Phase 3. Revise the utility plans with the existing alignment and a proposed method of re-routing. [ 12 / 26/ 07] Provide a blow-up of the area where the proposed re-route of the fire line and domestic water service is shown. It appears that the re- routes (particularly the fire line) are much too close to the proposed building addition on the north side of the building. Number: 47 Created: 3 / 25 / 2008 [3/25/08] Revise note, etc. where fire hydrant is being re -located as shown on the redlined plans. Show existing location of the hydrant. Include the fire hydrant standard detail. Page 3 Topic: Site/Landscape Plans Number: 38 Created: 1 / 18/ 2008 [3/24/08] The Site/Landscape plans received with this submittal are not showing any phasing this time? As long as they show phasing as shown in the Minor Amendment submittal, we're good to go. [1/ 18/08] Beautiful job coordinating the phasing with the utility plans. Thank you very much! The only comment I will have in Final Compliance is that a few scanning issues need to be addressed and that's pretty much it. I highlighted the line over text problem areas so you can block out the background in those places. The color phasing lines are great(!) but unfortunately it's not allowed per Appendix E6. You may substitute the 3 lines of color with just one black and white line separating the phases. The labeling you have shown addressing the overlapped phasing is perfect! Thanks again. Topic: Utility - Detail Sheets Number: 16 Created: 12 / 24 / 2007 [3/24/08] Thank you for adding the details. I hate to be "picky" but the entire 1602 detail has to be on the sheet, not just a portion of it. I'm sorry. [1/18/081 Final Compliance: Please provide 701 and 1602. [12/24/07] Please add 701, 1601, 1602, 1603, 1606a, 1607. Topic: Utility - General Number: 40 Created: 1 / 18/ 2008 [3/24/08] Only two minor places that need "tweaking" before going to mylars. I tabbed the sheets with a post it note and highlighted them in pink so you can easily find them. [1/ 18/08] I've highlighted in pink a few scanning issues that will need to be addressed in Final Compliance prior to going to mylars. Great job with the plans! Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 31 Created: 12 / 26/ 2007 [2/29/08] [12/26/07] Electric development charges will apply for the previously undeveloped portion of this site. These charges will apply even if no additional power is required, and will be payable as a condition of continued electric service to the site. Please contact Doug Martine at Light & Power Engineering (224-6152). Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 46 Created: 3 / 25 / 2008 [3/25/081 Poudre Fire Authority has no additional comments or concerns. Page 2 STAFF PROJECT REVIEW City of Fort Collins JR Engineering, LLC Date: 3/26/2008 c/o Timothy J. Halopoff, P.E./Michael Walker, P.E. 2620 East Prospect Road, Suite 190 Fort Collins, CO 80525 Staff has reviewed your submittal for TOLMAR SUBDIVISION (BUILDING EXPANSION - 701 CENTRE AVE.) - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 43 Created: 3 / 24 / 2008 [3/24/081 Megan Harrity of the Larimer County Assessor's office indicated that the signature block on the subdivision plat is stating a different owner [W.P. Carey &_Co., Inc. -]-than what the County's records currently show E[TFARMA(CO)QRS-1-6-93; 1NC].---� Number: 44 Created: 3 / 24 / 2008 [3/24/08] The condition of Project Development Plan approval has been satisfied with the addition of the word "Existing" in front of the New Mercer Ditch Easement label (located near the southeast corner of the site) on the Final subdivision plat. Department: Engineering Issue Contact: Susan Joy Topic: Platt Number: Created: 1/18/2008 [3/24/08] .Repeat:-Minor-corre_cti0as-equi-r-ed-to-the-Stat�tMen of— Ow.nersh-ip-see-redhnes-or-plat-larrguage-dac—If-you-rre-ed-the up- ate — vgrsion,-please-email-mtart s-o , c ov.co . [ 1 / 18 / 08] Final Compliance: The plat language needs to be updated. Please email me at sio�fcgov.com and I'll send you the current language. In addition to minor changes in the Statement of Ownership, we have removed all caps from the paragraphs. Number: 45 Created: 3/25/2008 [3/25/08] From Technical Services: 1. Boundary closes. 2. Lot 1 has no sight distance easement, so the restriction statement on Sheet 1 of the subdivision plat is not needed. Page 1