Loading...
HomeMy WebLinkAboutTOLMAR SUBDIVISION (BLDG EXPAND.) - PDP - 38-07 - CORRESPONDENCE - (15)Stormwater: "Minor amendment OK, need plat and utility plans to be finalized before condition is removed." The Final Plans for the replat of the property (subdivision replat and utility plans) are now in the request for mylars and recording stages of City review. An amended Development Agreement (administered by the Engineering Department) is a part of this Final Plan review and approval. The subdivision plat as submitted with the Final Plans package includes the Existing New Mercer Ditch Easement (as labeled on the plat). This satisfies the condition placed on the Project Development Plan approval. Please call us if you have questions or need additional information regarding this matter. Sincerely, Stephe Olt, City Project Planner (970)221-6341 Peter Barnes, Zoning Administrator (970)416-2355 cc: Cameron Gloss, Current Planning Director Susan Joy, City Engineering (970)221-6605 VF Ripley Associates Current Planning File #38-07 2 R g Planning, Development and Transportation Services Current Planning City of Fort Collins April 23, 2008 To: TFARMA "CO" QRS 16-93, Inc. To Whom It May Concern: This letter is with regards to the Tolmar Subdivision and Building/Parking Lot Expansion (701 Centre Avenue), Project Development Plan/Final Plan and Minor Amendment. The property, being part of the Centre for Advanced Technology and located on the north side of West Drake Road between South College Avenue and South Shields Street, is in the E - Employment Zoning District in the City of Fort Collins, Colorado. The Project Development Plan, as submitted, includes a subdivision replat of the property (from 2 lots to 1 lot) and utility plans. It has gone through the City's standard development review process and was approved by an authorized Hearing Officer on February 5, 2008, with one condition: "The Applicant shall revise the subdivision plat to reflect the existing New Mercer ditch easement prior to plat map recordation." This condition of approval has been adequately satisfied with the final subdivision plat as submitted. However, the Final Plans (and plat) have not yet been recorded. • The Minor Amendment, as submitted, includes a Site Plan, Landscape Plan, Building Elevations, and Lighting Plan. It has been through the standard development review process and has been approved, with conditional approval from the City's Transportation Planning, Light & Power, and Stormwater departments, as follows: Transportation Planning: "Per Ward Stanford: The development proposes shift work that starts and ends outside of normal rush hours. Their work shifts should maintain that characteristic. If that should change to be within rush hours, they would be required to submit a new TIS and be responsible for any future mitigation needed." Light & Power: "Once the power requirements are known, please contact Light & Power Engineering at 221-6700 to coordinate work and electric charges." 281 North College Avenue — P.O. Box 580 — Fort Collins, CO 80522-0580 — (970) 221-6750 — FAX (970) 224-6134