HomeMy WebLinkAboutSOLAR VILLAGE MAPLE PDP TYPE I - 23-07 - CORRESPONDENCE - (5)Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: F/oodp/ain Comments Number: 74 Created: 9/21/2007 [9/21/07] Please coordinate with Marsha Hilmes-Robinson on the remaining floodplain issues and building design required before the hearing. Marsha will have additional written comments the week of 9/24/07. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Landscape plan Number: 40 Created: 8/16/2007 [9/18/07] [8/16/07] Show water/sewer lines on landscape plan and provide required landscape separation distances. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 73 Created: 9/20/2007 [9/20/07] Before the hearing, please show how the pervious pavement underdrain system will outfall into the storm sewer in maple. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 36 Created: 8/16/2007 [9/18/07] [8/16/07] Indicate size of new water services to be installed. Number: 37 Created: 8/16/2007 [9/18/07] [8/16/07] Label intended use of water services (commercial vs residential). Number: 39 Created: 8/16/2007 [9/18/07] [8/16/07] Provide copy of the management organizations governing documents that outline maintenance responsibility for the common fire line. Number: 61 Created: 9/18/2007 [9/18/07] Applicant has delayed response to several comments until final compliance which is acceptable. A detailed review and additional comments will be made at that time. Number: 62 Created: 9/18/2007 [9/18/07] See redlined plans for additional comments. Be sure and return all of your redlined plans when you submit your Final Plans. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6206. Sincerely, Anne H. Aspen City Planner Page 5 Number: 52 Created: 9/13/2007 [9/13/07] The retaining walls within the ROW adjacent to the sidewalks will require hand rails or possibly seat walls for safety and ADA compliance. Number: 53 Created: 9/13/2007 [9/13/07] The planters and steps mid block on Maple should be revised such that the planters are not extending into the sidewalk area. Try to keep them entirely within the parkway strip. Number: 54 Created: 9/13/2007 [9/13/07] There appears to be planters being shown within the sidewalk area along Meldrum. The City would prefer not to have planter boxes encroaching into the sidewalk space. Please also show how doorways will function on the building fronting Meldrum. No doorways may swing into the ROW. Number: 55 Created: 9/13/2007 [9/13/07] Please provide more information on the plan for constructing the sidewalk chase that drains the alley. Spot elevations, dimensions etc... Provide a blow up detail if needed. The metal plate on the chase needs to extend 1 foot past the concrete on both sides. Number: 56 Created: 9/13/2007 [9/13/07] Alley Design - Please provide additional plan view information such as sidewalk widths, truncated dome panels, concrete pan in the alley etc.... See sheet RD01 of the redlines for clarification. Number: 57 Created: 9/13/2007 [9/13/07] See redlines for additional comments. Please return all redlines with you next submittal. Will need a revised signed easement dedication or letter of intent for the off -site drainage easement prior to scheduling a hearing. All current comments can be addressed at final compliance review. Number: 58 Created: 9/13/2007 [9/13/07] Please see the comments regarding the separate drainage easement document. Please use the standard easement dedication template provided with attorney certification page (I can email this document on request) and attach an Exhibit "A" Map to the document. A $250 easement document review fee must be paid to the City. Prior to scheduling a hearing, a letter of intent or signed easement dedication must be submitted. 5kel- �16- eV)'7VmvY1- J Number: 59 Created: 9/13/2007 [9/13/07] Please provide detailed site plan data regarding the exact number of residential units, commercial/retail area (SF) and gross site area (ac) so we can accurately calculate the review fees for this project. If additional fees are due the City they must be paid prior to scheduling a public hearing or the City may allow them to be paid at final compliance. Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 60 Created: 9/18/2007 [9/18/07] PFA has no additional comments or concerns. Page 4 not to have this corner dedicated as ROW or an easement. Please remove all references on the plans that show this corner as ROW. Please submit a new variance request modified to request no ROW or easement dedication at this corner. [8/14/07] Clearly show and label all ROW dimensions from centerline on Maple and Meldrum. No utility easements have been shown or dedicated on the plat. Please submit a variance request to this standard and list the variance on note no. 48 in the General Notes section. Number: 7 Created: 8/14/2007 [9/13/07] Please call out all new C&G to be constructed or reconstructed on Maple & Meldrum. Provide dimensions. [8/14/07] Clearly show, dimension and label on the Utility Plan sheet all new and reconstructed curb and gutter to be installed on Maple and Meldrum. Show the approximate limits of street cuts needed for all work in the existing street (i.e. curb and gutter, driveways, utility service connections etc... ). Add the standard street cut note to the plans. Number: 11 Created: 8/14/2007 [9/13/07] Please show the westerly side of the driveway intersection to be constructed at 90 degrees with the street. This will narrow the driveway slightly but it is still adequate for alley access. The easterly side can remain skewed to avoid relocation of the vaults. [8/14/07] The alley intersection driveway will need to be reconstructed per LCUASS Drawing 803 provided. A few things to be noted regarding this standard intersection design: Pedestrian ramps are required on both sides of the driveway. No more than 0.5 cfs for the Design 2 year storm may drain over the sidewalk (alley flows and detention area flows combined). No part of the building structure may encroach into the ROW dedicated at the corner for sight distance. The driveway shall intersect Maple Street at 90 degrees with radius comers on both sides. Number: 18 Created: 8/14/2007 [9/13/07] Please provide pipe elevations and describe or show how the pipe will outlet to the alley. If you are proposing a single point pipe discharge to the alley then you will need to install a standard concrete pan in the alley to convey the concentrated flows to the gutter pan on the east side of the alley. See redlines for clarification. [8/14/07] Please remove the deck from the grading plan and show the proposed outfall concrete drainage channel between the buildings to the alley. Provide flowline elevations. Number: 20 Created: 8/14/2007 [9/13/071 All LCUASS standard details for the sidewalks, C&G, chase drain etc... are required at final compliance. [8/14/07] Construction details will be required at the final compliance review stage. Number: 51 Created: 9/13/2007 [9/13/07] Based on the Maple Street sidewalk cross sections provided, it will be necessary to widen the sidewalk to a min. of 8 feet wide adjacent to the retaining walls. If desired, you may taper the walks or maintain 8 feet in width continuously. A flat landing mid way is also required where the sidewalks slope at 5 percent adjacent to the retaining walls to be A.D.A compliant. Please see the redlines for clarification. Provide adequate spot elevations to show mid way flat landing areas. Page 3 [8/14/07] Please dimension alley, drive aisles, setbacks, buildings, sidewalks and walkways. Topic: Elevations Number: 29 Created: 8/14/2007 [9/19/07] 1 have not received the visual or written analysis. [8/14/07) You are correct that in the Downtown Civic Center Subdistrict the maximum building height is 45 feet, however, there is a general standard that applies to buildings city- wide over 40 feet, which requires a special height review. The Review Standards are located in Section 3.5.1 (G). There are a few additional submittal items that are required too including a shadow study, a visual analysis and a written analysis. These must be reviewed prior to your administrative hearing. Number: 30 Created: 8/14/2007 [9/19/07) I'm still not convinced about the north elevation. It is somewhat hard to glean the design given that the software you use is primarily modeling software but I'd like to discuss this some more or perhaps see some perspectives of this side. [8/14/07] 1 have a number of concerns about the architectural detailing and materials on the elevations. Please see redlines. Topic: Landscape plan Number: 71 Created: 9/19/2007 [9/19/07] Add another approved street tree to the west side of the plan, where indicated on my redlined landscape plan. Topic: Lighting Plan Number: 75 Created: 9/24/2007 [9/24/07] The lighting plan looks very good in terms of fixtures and light levels. A few small comments: please label the fixtures' cut sheets with the fixture name (WP1,2, P1, RR1) for easier reference; add a cut sheet for P1, adjust LLF to 1.0, use a house side shield, adjust light level or adjust fixture placement to reduce or preferably eliminate light spill onto neighbor to north's property. A couple other minor comments on redlines. Please return redlines with next submittal. Topic: Plat Number: 72 Created: 9/19/2007 [9/19/07] Remove City Clerk signature line and change Director of Planning to Director of Current Planning. See redlines. Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 2 Created: 8/14/2007 [9/13/07] Please remove Fort Collins, CO from the title on the Utility Plan Cover sheet. All of the plan titles should be identical and match the Plat title. The legal description sub -title provides the location. [8/14/07] All of the plans should have identical titles and should match the title of the Plat (i.e. Solar Village Maple Subdivision) Number: 5 Created: 8/14/2007 [9/13/07] The City has approved the variance requests as submitted however, since the structural column at the southeast comer and other improvements will be allowed we prefer Page 2 STAFF PROJECT Justin Larson JCL Architecture, Inc. 401 S. Mason St. Fort Collins, CO 80524 REVIEW Date: 9/24/2007 Staff has reviewed your submittal for SOLAR VILLAGE MAPLE PDP - TYPE I, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 63 Created: 9/18/2007 [9/18/07] The following departments or agencies have no further comments or issues with the proposed project: Environmental Planning, Comcast. Topic: Cover Sheet Number: 21 Created: 8/14/2007 [9/18/07] Still no lighting plan. Please submit. This is required pre -hearing and must be submitted in time for staff review prior to hearing. Update: lighting plan was submitted after staff review. See comments below. [8/14/07] Please submit Lighting Plan with next submittal for timely review. Number: 64 Created: 9/18/2007 [9/18/07] Remove all interior information from sheet. You lost some neighboring building Pr", s o footprint information on this round. Please correct. The carport area is shaded with this�- submittal and should not be. Topic: Site Plan Number: 65 Created: 9/18/2007 [9/18/07] Thank you for increasing the size of the site plan. It is much easier to review now. Number: 66 Created: 9/18/2007 [9/18/07] Please remove interior information. Number: 67 Created: 9/18/2007 [9/18/07] The bike racks shown on the site plan do not jive with the bike racks shown in the detail. Which is it? Be sure to locate the bike racks so that bikes can access both sides on concrete and such that parked bikes will not obstruct walkways or accessible ramps. Number: 68 Created: 9/18/2007 [9/18/07] Please remove or identify miscellaneous items redlined on the plans. Number: 69 Created: 9/18/2007 [9/18/07] Please show dotted line of balconies above to ensure no tree conflicts will arise. Number: 26 Created: 8/14/2007 [9/19/07] There are still some key dimensions missing. I've indicated them on the redlines. Page 1