HomeMy WebLinkAboutFIREHOUSE EXPRESS CARWASH - PDP - 1-11 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONDELICH ASSOC ATES Traffic & Transportation Engineering �_ L
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669-2061 Fax: (970) 669-5034 �.
MEMORANDUM
ego Rec-
o
TO: Jim Houck, C-Three LLCQ�F��> J•O•��'�
City of Fort Collins
®
FROM: Matt Delich E
DATE: December 28, 2010 3t�ilA1.
SUBJECT: Firehouse Xpress Car Wash Transportation Impact Study
(File: 1067ME01)
This memorandum addresses the transportation impacts of the proposed
Firehouse Xpress Car Wash. Appendix A contains the Tower Shoppes PUD overall
plan, which shows the various lots. The Firehouse Xpress Car Wash is proposed to be
located on a parcel (Lot 2) in the northwest corner of the Tower Shoppes Shopping
Center in Fort Collins. The site location is shown in Figure 1. The Firehouse Xpress
Car Wash is an automated ("tunnel") car wash. The scope of this transportation impact
study was discussed with Ward Stanford, Fort Collins Traffic Operations. Trip
generation and trip distribution analyses were requested. Traffic counts and analysis of
the Timberline/Site Access intersection were also requested.
Figure 2 shows recent afternoon peak hour counts at the Timberline/3/ Access
intersection and daily counts on Timberline Road, north of Horsetooth Road. Only the
afternoon peak hour traffic count was requested, since this is, by far, the most active
time for the car wash use. Raw traffic counts are provided in Appendix B. Traffic
counts at the Timberline/3/ Access intersection were obtained in December 2010.
Table 1 shows the current afternoon peak hour operation of the key intersection.
Calculation forms are provided in Appendix B. A description of level of service for
signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a
table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also
provided in Appendix B. The Timberline/3/ Access intersection operates acceptably
during the afternoon peak hour.
Figure 3 shows thesite plan for the Firehouse Xpress Car Wash. The Firehouse
Xpress Car Wash will be a single, automated car wash tunnel with vacuum facilities.
Access to the site will be primarily via the existing 3/ Access (right-in/right-out/left-in)
to/from Timberline Road. There is a right-in/right-out access to/from Horsetooth Road
near the existing McDonald's and Sonic parking lots. The Timberline/Horsetooth
intersection can be reached from this access for.exiting traffic. Trip Generation, 8th
Edition, ITE is customarily used as the reference document in calculating the trip
generation. That reference has limited information related to this type of car wash
operation. Therefore, a similar automated car wash site was observed in Fort Collins.
Table 2 shows the trip generation for that automated car wash. Since the observation
=wwo�
1,1 I 1 "ww_�p3
• wIn wpwrca
so >z
III III II - ii rmwp i FQo
M III III , Up OK�V'pwN
til III I � >a_
II I III 111
1 ziaacJw zw�
Know what's bCIOW. o�aaaaowa
Call before you dig.
I---
----------------------------------------------
I I III �� oro
0
U
LEGENDr U ZD it N
I IM1 •• _
p O 0 ID
- - - - - - PROPOSED MINOR/1' CONTOUR W I O= Z Z
IIII \ \ _ i SOOOZi of
PROPOSED MAJOR/5' CONTOUR d ZO Q J N
___ _ U
5000- -� EXISTING MAJOR/5 CONTOUR O Z O N
O III - - ' tt
___________ ______`______- `_____________ EXISTING MINOR/1 CONTOUR O-
_ O � �_______ _________________ ______________________________________________ ROW DIRECTION � O
III ________ _
III � III _ � � � —
III 91 III _ BASIN NAME
NOR
III III I � MINOR RUNOFF COEFFICIENT
III I I III III I I 'i � ` 9t8t BY AREA � g
III III III III
III N II II III
I I II III III $ z 'm
III III III III n Ipy�
I� I_ III III S III W
7llShr---- �r--- 5 IWy�
III pl I \ 1 I H U
II I N III H II
\` fy
IIII I I II III III I I i v m,_
IIII III�
III IQ III III ;Y I///�
III I I 11 I Ill _ P
III m I III III III � 0.9 JS I v
I
III I III III I I � \y '/X� 0 I
III I III III III \ � ♦ } I II II III Y9t0 Y9 I �• I
III III
`a
III II I IP hl III w
0
I III III I I �
r
III I III III III �
i
10111 III III III I�0 m
III m III NI
a 1 9ai
I
ie
II ;'
u m o
I I III III Of W
II to III
Tr
III I III III Z \\V\ /. 1. ass —•--
� J � _ <Ygt \ 1
__
III II III III W � _ _
III I I 0]
III o' 1 9A,
I �
I 1111111 � o
p� 1111/111 a`J
e9A4
III`y n94] / z
, n5 0 0
IIII III �p ____ AN neAs �� i'
III ;it
to III m III III
w w m > m
III III
pl III III III dI ti' / _._ _ o u a z
IIII I III III I I I, r �_-- is 9"
1 II A III /�
I III III III , 1 L _ I
u 1 11 III I
III I IIII III 10 141 ��.
III III IU l 11 lii /
d (A
m III III III • pl It_ _- I 20 10 0 20 aD Q
II III it III III — ORIGINAL SCALE: 1" = 20 Of J
II IIII III III
I
III NIII III III \ Ij i-sa\ xU7 lY
III NI III III III I III III Q W III Ed
III W III III III III' PREPARED UNDER THE DIRE OFW Q
IIII m U II III III III II
III I N IIII III II II I ', jj1 -_ III III ��
III i III III U iIn I�1 111 O U 12�
ILLI S a _
O
2v �49
SHEET 1 OF 1
J RS JR. DATE
COLORADO P.E. No. «ass JOB No. 39671.00
FOR AND W BDUAL OF AENWNEERING
RUNOFF COEFFICIENTS & % IMPERVIOUS
LOCATION: Lot 2 - Tower Shoppes PUD
PROJECT NO: 39671.00
COMPUTATIONS BY: jmj
DATE: 111112011
Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria
Recommended % Impervious from Urban Storm Drainage Criteria Manual
Streets, parking lots (asphalt):
Sidewalks (concrete):
Roofs:
Lawns (flat <2%, sandy soil):
Runoff
%
coefficient
Impervious
C
0.95
100
0.95
96
0.95
90
0.10
0
JR Engineering
2620 E. Prospect Rd., Ste. 190
Fort Collins, CO 8525
SUBBASIN
DESIGNATION
TOTAL
AREA
(ac.)
TOTAL
AREA
(sq.ft)
ROOF
AREA
(sq.ft)
PAVED
AREA
(sq.ft)
SIDEWALK
AREA
(sq.ft)
LANDSCAPE
AREA
(sq.ft)
RUNOFF
COEFF.
(C)
PROPOSED
0.90
39,153
3626.67
22,372
4,133
9,022
0.75
Equations
- Calculated C coefficients & % Impervious are area weighted
c=�(C,A1)
0 At
C; = runoff coefficient for specific area, A;
A; = areas of surface with runoff coefficient of C;
n = number of different surfaces to consider
A t = total area over which C is applicable; the sum of all A is
3967100-c-eval-proposed only.xls
proposed project does not need to provide additional storm water improvements.
Therefore, the storm water management design approved with the Sonic Drive -In, and
updated with this addendum is assumed adequate for the construction of the project.
We greatly appreciate your time and consideration in reviewing this submittal. If you
have any questions or required additional information please call (970) 222-1317.
Sincerely,
JR Engineering
Prepared by,
John E. Meyers Jr., P.
Project Engineer and
Reviewed by,
Michael S. Brake, P.E., P.L.S.
Principal and Vice President
January 11, 2011
Mr. Wes Lamarque
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80521
J•R ENGINEERING
A CL•arian compzn7
RE: Lot 2 Tower Shoppes PUD - Drainage Addendum for Firehouse Express
Carwash
Dear Wes,
JR Engineering is pleased to submit, for your review and approval, this addendum that
describes the proposed drainage conditions for the revised layout for Lot 2 of the Tower
Shoppes PUD. This addendum references the originally approved drainage report
entitled "Final Drainage and Erosion Control Report for Tower Shoppes PUD" prepared
by RBD Engineering Consultants dated June 7, 1995 and an addendum to the study from
2005. The addendum, entitled "Final Drainage and Erosion Control Report for Sonic
Drive -In — Lot 4, Tower Shoppes P.U.D., " prepared by Interwest Consulting Group and
dated June 29, 2005, updated the original design with current City drainage requirements.
All computations within this report have been completed in compliance with the City of
Fort Collins Storm Drainage Design Criteria dated May 1984, revised April 1997.
The revised plans for Lot 2 includes an automatic car wash building and self serve
vacuum bays in the paved parking lot. Calculations included in the attachment show that
the runoff coefficient of the proposed site will remain within 1 % of the coefficient for the
same site under the previously approved plans. Although a slight increase is indicated, it
is our opinion that the increase is negligible. In addition, the intent of the proposed design
is to maintain the drainage patterns associated with the previously approved plans. This
includes stormwater entering the swale in the southeast corner of the site.
In the approved addendum for the Sonic Drive -In, the report discusses the regional
detention pond capacity and states the following: "Thus detention for Lots 2 and 4 will be
provided in the regional pond and on -site detention for Lots 2 and 4 will not be required."
The report goes on to discuss water quality for which it offers a design that, "is located in
its final location and is sized to provide the required amount of water quality
enhancement for all of the Tower Shoppes P.U.D. to be developed."
The above mentioned revisions have been designed with provisions for safe and efficient
control of stormwater runoff in a manner that will not adversely affect the stormwater
system. Due to the fact that the attached calculations indicate a negligible difference in
discharge when compared to the original design, and the approved design states that both
water quality and detention is provided by existing facilities, it is evident that the
Ti-iE Wo�, COMPANIES
1800 Broadway, Suite 210 * Boulder, CO 80302
January 27, 2011
Re: Firehouse Car Wash — Lot 2 Tower Shoppes PUD
To whom it may concern:
This letter is to acknowledge and approve the intended entry way improvements
to the Tower Shoppes entrance off of Timberline Road within Lot 1 Tower
Shoppes PUD per the submitted Firehouse Car Wash Project Development
Plans by C-Three, LLC, with the understanding that any improvements requiring
restricted vehicular and/or pedestrian access shall be constructed during non -
business hours in a mutually agreeable manner.
Additionally, WW Reynolds intends to grant an emergency access easement
across Lot 1 Tower Shoppes PUD as required for the approval of the Firehouse
Car Wash project. Furthermore, WW Reynolds acknowledges and supports the
amended Tower Shoppes PUD plans as submitted by C-Three, LLC on behalf of
WW Reynolds, subject to WW Reynolds approval of the exact location and
configuration of the proposed easement, and the terms and conditions of the
specific grant of easement.
Authorized signature and title for WW Reynolds:
Name:
Title:
Fire House Xpress Car Wash
conceptual schedule
Jan 20- submit to City for review
Mid Feb award contract to General Contractor
end Feb apply for building permit
end of March break ground
grand opening mid July
C-Three LLC Owners
Jason Luy/ Jen Luy
3527 Hearthfire dr
Ft Collins, CO 80524
970-214-1499
Jim Houck/ Kara Houck
3520 Hearthfire dr
Ft Collins, CO 80524
970-222-7624
Doug Lee/ Wendy Lee
5906 Falling Water Dr
Ft Collins, CO 80528
970-219-5320
PDQ of the Rockies
John Brinkman
8214 East Park Meadows Dr
Lonetree,CO 80124
303-662-9100
YR ENGINEERING
A Company
LEGAL DESCRIPTION
Lot 2, Tower Shoppes PUD, City of Fort Collins, Colorado.
7200 E. Alton Way. Suite C100, Centennial. CO 80112
970-222-1317 • oww.jreneineering.com
Given the proposed carwash use, pedestrian circulation within the property is
expected to be minimal. The existing Timberline Road pedestrian trail is to
remain in place. The existing attached sidewalk stub following the north curb of
the entry drive is to be removed as a part of this project.
Buffering. The land use of the proposed car wash on Lot 2 is compatible with
the automobile -oriented retail and commercial uses allowed within the Tower
Shoppes PUD, as approved. Current users within the PUD include a drive -
through McDonald's and Sonic restaurant, while Lot 1 remains vacant. Buffering
between Lots 1 and 2 is not anticipated at this time.
The northeast corner of Lot 2 is over four hundred feet from the nearest corner of
the Fort Collins High School building (generally to the northeast), with the school
bus drop off acting as a buffer between the two uses. Evergreen and shrub
plantings are proposed along the north wall of the car wash to provide a visual
transition from the school property. A colonnade of Linden trees on the school
property following an existing sidewalk provides an additional buffer from the
school.
The nearest residential property is over 400' from the southeast corner of the
property, south of Horsetooth Road. Currently, portions of Lot 2 are only partially
visible from ground level south of Horsetooth Road due to the existing
McDonald's and Sonic buildings.
Statement of proposed ownership and maintenance of public and private open
space areas; applicant's intentions with regard to future ownership of all or
portions of the project development plan.
C-Three, LLC, the developer of the property, will own and operate the carwash
business. No open space, public or private, is proposed within Lot 2.
Landscaped areas within Lot 2 will be privately maintained, along with the small
portion of right of way near the southwest corner of the property.
Estimate of number of employees for business, commercial, and industrial uses.
The total number of employees at the carwash facility is unknown, although a
typical shift will generally not exceed two employees. Should additional
employee parking be required, vacuum stalls may serve as overflow parking.
Narrative description of how conflicts between land uses or disturbances to
wetlands, natural habitats and features and or wildlife are being avoided to the
maximum extent feasible or are mitigated.
Following approval of the Tower Shoppes PUD in 1995, Lot 2 was graded and
seeded, and appears to have low habitat value. The property is currently vacant,
and no wetlands exist on the property. The existing trees on the property to be
removed are being replaced with larger trees, as required in the Land Use Code.
Name of the project as well as any previous name the project may have had
during Conceptual Review.
Lot 2 of the Tower Shoppes PUD is being submitted as the Firehouse Express Carwash.
No other names have been proposed.
Page 2 of 2
t,.
Statement of Planning Objectives
Firehouse Carwash Express — Lot 2, Tower Shoppes PUD
City of Fort Collins, Colorado
Specific City Plan policies being implemented with this project are:
Policy CAD-3.1, "Modification of Standardized Commercial Architecture;"
The building shell of the carwash facility has been designed to reflect the
appearance of a fire station, complete with a red brick tower, to pay
tribute to the applicants' backgrounds as firefighters.
Policy CAD-3.2, "Compatibility with Surrounding Development;"
The most significant architectural element in the area is the Fort Collins
High School. Building colors on the carwash will be generally neutral
grey with red brick accents to complement the high school architecture.
Cornices will define the roof line, further reflecting the school's design.
Policy CAD-4.1, "Crime Prevention and Building Security;" and,
The location and orientation of the building relative to the vacuum stalls
minimizes potential hiding places and maximizes visibility through the
site.
Policy CAD-4.2, "Lighting and Landscaping."
Lighting and landscaping are proposed to be consistent with existing
commercial development in the area. The proposed landscape palette
uses materials that were approved and installed with the original Tower
Shoppes PUD.
Description of proposed open space, wetlands, natural habitats and features,
landscaping, circulation, transition areas, and associated buffering on site and in
the general vicinity of the project.
Open Space. No additional open space is proposed with the project. A major
pedestrian trail paralleling Timberline Road was built on Lot 2 as part of the first
phase of the Tower Shoppes PUD, and is proposed to remain in place.
Wetlands, Natural Habitats and Features. The subject property was graded
for development in 1996, and landscape along the entry drive and Timberline
Road was installed at approximately the same time. The most significant
features near the property are stands of mature trees, particularly west of
Timberline Road.
Landscaping. The landscape design uses plant materials that are consistent
with the Tower Shoppes PUD, as constructed. Existing trees on the property to
be removed to accommodate the proposed use are to be replaced with similar
species at a larger size. All of the plant material is consistent with the City's plant
list and hydrozone requirements.
Circulation. Vehicular access to the property is via Timberline Road, north of
Horsetooth Road, via the entry drive already built with the first phase of the
Tower Shoppes PUD. The entry drive is proposed to be reconfigured to allow
improved access.
Page 1 of 2
y�❑ Lighting Plans (7 copies 24" x 36" — folded). �► �N�
01b Hazardous Materials Impact Analysis (3 copies).
,Y(n Street cross sections schematics (if not included in the utility plans) (8 copies 24" x 36" — folded).
❑ Explanation of any variance request(s).
❑ Signed letters of intent indicated that all required off -site easement and off -site rights -of -way can be
negotiated in time for final development plan submittal.
❑ Other information that the Director may require:
— Natural area or environmental study (4 copies)'
— Wetland Delineation (4 copies)
'This document is meant to be used as a checklist only. For a more detailed list and explanation of each of
these items, please see the handout: "Submittal Requirements: Project Development Plan"
Revised March 3, 2010 2 PDP Submittal Requirements
Fcof
o'rt�Collins
E?edveloprnent Refw-Guide S7
SUBMITTAL CHECKLIST:
PROJECT DEVELOPMENT PLAN (PDP)
The following information is required to be submitted with all applications, unless waived by
staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins
Community Development and Neiahborhood Services Department.
❑ Application form, filing fee (plus .75 cents for each APO label), and sign posting fee. Application Form.pdf
❑ Transportation Development Review Fee — please contact Engineering at 221-6605 for information.
TDR Fees and Application.pdf
,5�Three lists (3) of names and addresses of all owners of record of real property within at least 800' of the
property lines for the parcel of land for which the project is proposed, exclusive of public right-of-way. (Two
(2) lists typed on mailing labels (33 names per sheet) and the other list on a reproducible copy of those
labels). I ( i-A I(rf;Ltt
Lit" Statement of planning objectives (31 copies).
Copy of applicable conceptual letter and response letter explaining how issues have been addressed (31
copies)
# Complete list of proposed street names for the development.
Legal description of the site (one copy on 8'/2 x 11" sheet).
Name and address of each owner of property within the boundaries of the development plan area.
List of names of all general and limited partners and/or officers involve as either applicants or owners.
❑ Development phasing schedule.
�ite plan drawings. (Refer to the submittal requirements for specific information to be presented on the
site plan.) (31 copies 24" x 36" — folded).
`0 ❑ Subdivision Plat (23 copies 24" x 36" —folded).
.01'Architectural elevations copies 24" x 36" folded).
/Landscape Plan (Refer to the submittal requirements for specific information to be presented on the
landscape plan.) (21 copies 24" x 36" — folded).
Transportation Impact Analysis (TIA) (7 copies).
All�utility plans (existing and proposed utility systems) (17 copies 24" x 36" — unfolded). Utility Plans
Checklist.pdf
/Requirements for utility plans checklist (1 copy).
;Ylbrainage and erosion control report (4 copies).
Soils Report (3 copies). .
Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580
art Collins
Site Address:
Transactions
Community L elopment & Neighborhood Services
281 N. College Ave Fort Collins, CO 8o522
970.221.676o 970.224.6134 -fax
BMISC110
BUILDING PERMIT #: 038
Permit Type: General
Method Check Number Date Paid Amount Paid Comments
Fund Transfer CK # NA 01/26/2011-$250.00 TRANSFERRING THE $250 FOR THE MINOR
AMENDMENT FROM THIS RECEIPT TO MA1100007 -
BALANCE IN TDR SHOULD BE 2,880 - SL
Check CK# 1007 01/20/2011 $7,096.25 PAID BY C-THREE LLC CK #1007
Receipt issued: 01/26/2011 Total Paid to Date: $6,846.25
Fee Description
Account Code
Fee Amount
Amount Paid
Planning: Dev. Review
1000.444040
$3,887.00
$3,887.00
Planning: Mailings
1000.444050
$29.25
$29.25
Planning: Sign Posting
1000.444050
$50.00
$50.00
Transportation Dev Review
902010.444030
$2,880.00
$2,880.00
TOTAL FEES: $6,846.25 $6,846.25
Date Paid
Amount Due
01/20/2011
$0.00
01/20/2011
$0.00
01/20/2011
$0.00
01 /26/2011
$0.00
$0.00
TOTAL BALANCE DUE AS OF 01/26/2011: 0.00
Fee Amounts are valid for date of this document only. Fees subject to change without notice.
Form Revised October 2008
Accela Automation: ShowPayD-`zi140 - T8108-D
Page 1 of 1
RECEIPT
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT 8: NEIGHBORHOOD SERVICES
281 N. COLLEGE AVE
970.221.6760
PO BOX S80
970.224.6134 - fax
Application # : BMISC110038
Project Name (Subdivision) : FIREHOUSE XPRESS CAR WASH
Application Type : Building / Misc / General / NA
Receipt No.: 159075
Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments
Check 1007 $7,096.25 01/20/2011 02:30:31 PM KTHARP PAID BY C-THREE LLC CK #1007
Owner Info.:
Work POP SUBMITTAL FIREHOUSE XPRESS CAR WASH PLANNING FEE 3887.00
Description: SIGN POSTING $50.00 APO LABELS (39) $29.25 TOR FEE $2880.00 MINOR
AMENDMENT $250.00
T8108-D
Version 4.0
https://dtsweb02.fcgov.com/operations/perniitlindex.cfm?FUSEACTION=ShowPayDetail... 1 /20/2011
City of Transpot-W` in Development Reyiew FeP Date Received/ Paid 1'7'0'17
Fit Collins 24otal Amount Paid 300,00
POT Project Name: k&-hogip, )�t*SS L tArUlash
Project Location: 3500 6Timbgkw1L Date:
Type of Submittal
Please indicate the type of application submitted by checking the box
Foot Notes:
preceding the appropriate request(s).
When a development project involves a change of use for a
Fee structure amount due
building, the charge per square foot shall apply to the portion of
❑
Overall Development Plan (ODP)
$500 each
the overall building size for which the change of use is proposed,
provided that the new use generates more traffic than the existing
❑
Final Development Plan (FDP)
use, as determined by the current Institute of Transportation
This fee includes 2 rounds of review
$1000 each
Engineers Trip Generation. If the new use does not generate more
traffic than the existing use then the charge per square foot for
❑
Additional round of review
$ 500 each
shall apply only to the net additional building size (if any).
❑
Annexation $20 X
_ acres = _ + $250 =
These fees do not include the cost of filing fees for the recording of
Minor Amendment
$256 each
the Development Agreement. When a Development Agreement or
Amendment Agreement is entered into the Developer shall be
❑
Major Amendment
$2,500 each
responsible for the cost of recording the document. Said filing fees
❑
Re -zone
$200 each
shall be calculated and provided when the signed document is
retuned to the City for signatures and filing.
❑
Modification to Land Use Code
$200 each
*** This fee does not include the cost of filing fees. Filing
❑
Wireless Telecommunication Equipment (WTE) $65 each
fees shall be determined at the time of final document
❑
Road Projects acres (of roadway) X $250 =
submittal and will be required prior to filing.
❑ Vacation of Easement(s) *** # of vacations _ X $400 =
0 Vacation of Right(s)-of-Way *** # of vacations _ X $800 =
❑ Dedication of Easement(s) and/or Right(s)-of-Way ***
# of dedications _ X $250 =
Multifamily or other residential units $115 per unit
# of units X $115 =
------- --- -- - — -- --- --- -- - --
Commerctal, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
j6sq ft X $0.25 =
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre acres X $ 250 =
Project fee $2,000 each $2.000
11
General Information: , ,,
Owners Name(s): _ibr t�&A
Street address: 3 f 2 itleof 1t ' �/
Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review. \
Detached Single Family $160 per unit City/State/Zip: _r—T 4oIIt, U S NP1
# of units X $160 =
Telephone. Fax
Applicants/ Consultants Firms Name:
Total of above amounts
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
the following formula:
$30,000 + r/z (the amount over 30,000 I =
The maximum fee for any residential ONLY project shall be $500 per
residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
or the above calculated amount.
# of residential units X $500 =
Reduction for affordable housing - a copy of the City letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP
cc:. Christie White, Engineering
Development Review Engineering
Contact:
Street address:
City/State/ Zip:
�
Telephone: Fax:
Certification:
By signing this permit I acknowledge that I am acting with
the knowledge, consent, and authority of the owners of the
property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the
City Code; and including common areas legally connected
to or associated with the property which is the subject of
this application) without whose consent and authority the
requested action could not lawfully be accomplished.
Pursuant to said authority, I hereby permit City officials to
enter upon the property for purposes of inspection.
Name (pleas JGftLS V
Signature: n
Telephone: CIiQ
Type of Request
Please indicate the type of application submitted by checking the box preceding the appropriate request(s).
Additional handouts are available explaining the submittal requirements for each of the following review
processes.
❑ Annexation Petition with Initial Zoning REQUESTED ZONE: _
Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label
❑ Rezoning Petition REQUESTED ZONE:
Fee $977.00 + $50.00 sign posting fee + $.75 for each APO label
❑ Overall Development Plan (ODP)
Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label
lD Project Development Plan (PDP) without Subdivision Plat &btb
Fee: $3,887.00 + $50.00 sign posting fee + $.75 for each APO label .3
a#I. aS
❑ Project Development Plan (PDP) with Subdivision Plat
Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label
❑ Final Plan without Subdivision Plat
Fee: $1,000.00
❑ Final Plan with Subdivision Plat
Fee: $1,000.00
❑ Modification of Standards/Text and Map Amendment
Fee: $200.00+ $50.00 sign posting fee
❑ Basic Development Review
Fee: $200.00
❑ Major Amendment
Fee: $3,206.00 + $50.00 sign posting fee + $.75 for each APO label
❑ Non -Conforming Use Review
Fee: $1,389.00
❑ Vacation of ROW or Easement
Fee: $5.00 per sheet of filing document
❑ Small Project Fees
Fee: Varies -Check with the Current Planning Department
❑ Street Name Change
Fee: $5.00
❑ Extension of Final Approval
Fee: $566.00
❑ Site Plan Advisory Review
NO FEE
❑ Addition of Permitted Use
Fee: $500.00 + $50.00 sign posting fee + $.75 for each APO label
Revised January 21, 2010 2 PDP Submittal Requirements
City of
Fort Collins DEVELOPMENT REVIEW:
APPLICATION FORM
For Office Use Only
Date Submitted Current Planning File #�// Planner
Project Name: Firk-hadit- i%ffsSS Cnrwach
Project Location (Street Address):
yTIA6kiu-
Land Use Information:
Gross Acreage/SquareFootage:
Existing Zoning: �v C
Proposed Use: f�- n+�Jjt vf,04�
Total Number of Dwelling Units:
Total Number of Affordable Dwelling Units:
Percentage of Affordable Dwelling Units (out of total):
Total Commercial Floor Area: _itrl 3i0
Additional Information (if Applicable):
Project Description: TuricI Cor Wqh
(Choose the type of project from the list on the back)
General Information: List all property owners having a legal/equitable
interest in the property (attach separate sheets if necessary).
Owner's Name(s): Jie3 oovdj<
Street Address: UM Gh+N, „ram r
City/statelZip: (-T 1'z 1fil/� [. (Z_�
Telephone: q76 ZZi=% Fax:
Applicant's/Consultant's Name:
Name of firm:
Contact
Street Address:
City/State/Zip:
Telephone: Fax:
E-mail:
CERTIFICATION
I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with
the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including
common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the
purpose of inspection, and if necessary, for posting of public notice on the property.
Name (Please PRINT): L, , V• .ZO11< C~TAA& L&(-
Address: OS�kO% gzaP44f& d4. F-t 4011� ✓ o Cd
Telephone: ! f 70-122-^i624
Sig re: d title showing authority to sign, if applicable)
6-r U- I✓
'*CERTIFICATION MUST BE SIGNED:.p
Community Development & Neighborhood Services - 281 N College Ave - Fort Collins, CO 80522-0580