Loading...
HomeMy WebLinkAboutFIREHOUSE EXPRESS CARWASH - PDP - 1-11 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONDELICH ASSOC ATES Traffic & Transportation Engineering �_ L 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 �. MEMORANDUM ego Rec- o TO: Jim Houck, C-Three LLCQ�F��> J•O•��'� City of Fort Collins ® FROM: Matt Delich E DATE: December 28, 2010 3t�ilA1. SUBJECT: Firehouse Xpress Car Wash Transportation Impact Study (File: 1067ME01) This memorandum addresses the transportation impacts of the proposed Firehouse Xpress Car Wash. Appendix A contains the Tower Shoppes PUD overall plan, which shows the various lots. The Firehouse Xpress Car Wash is proposed to be located on a parcel (Lot 2) in the northwest corner of the Tower Shoppes Shopping Center in Fort Collins. The site location is shown in Figure 1. The Firehouse Xpress Car Wash is an automated ("tunnel") car wash. The scope of this transportation impact study was discussed with Ward Stanford, Fort Collins Traffic Operations. Trip generation and trip distribution analyses were requested. Traffic counts and analysis of the Timberline/Site Access intersection were also requested. Figure 2 shows recent afternoon peak hour counts at the Timberline/3/ Access intersection and daily counts on Timberline Road, north of Horsetooth Road. Only the afternoon peak hour traffic count was requested, since this is, by far, the most active time for the car wash use. Raw traffic counts are provided in Appendix B. Traffic counts at the Timberline/3/ Access intersection were obtained in December 2010. Table 1 shows the current afternoon peak hour operation of the key intersection. Calculation forms are provided in Appendix B. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix B. The Timberline/3/ Access intersection operates acceptably during the afternoon peak hour. Figure 3 shows thesite plan for the Firehouse Xpress Car Wash. The Firehouse Xpress Car Wash will be a single, automated car wash tunnel with vacuum facilities. Access to the site will be primarily via the existing 3/ Access (right-in/right-out/left-in) to/from Timberline Road. There is a right-in/right-out access to/from Horsetooth Road near the existing McDonald's and Sonic parking lots. The Timberline/Horsetooth intersection can be reached from this access for.exiting traffic. Trip Generation, 8th Edition, ITE is customarily used as the reference document in calculating the trip generation. That reference has limited information related to this type of car wash operation. Therefore, a similar automated car wash site was observed in Fort Collins. Table 2 shows the trip generation for that automated car wash. Since the observation =wwo� 1,1 I 1 "ww_�p3 • wIn wpwrca so >z III III II - ii rmwp i FQo M III III , Up OK�V'pwN til III I � >a_ II I III 111 1 ziaacJw zw� Know what's bCIOW. o�aaaaowa Call before you dig. I--- ---------------------------------------------- I I III �� oro 0 U LEGENDr U ZD it N I IM1 •• _ p O 0 ID - - - - - - PROPOSED MINOR/1' CONTOUR W I O= Z Z IIII \ \ _ i SOOOZi of PROPOSED MAJOR/5' CONTOUR d ZO Q J N ___ _ U 5000- -� EXISTING MAJOR/5 CONTOUR O Z O N O III - - ' tt ___________ ______`______- `_____________ EXISTING MINOR/1 CONTOUR O- _ O � �_______ _________________ ______________________________________________ ROW DIRECTION � O III ________ _ III � III _ � � � — III 91 III _ BASIN NAME NOR III III I � MINOR RUNOFF COEFFICIENT III I I III III I I 'i � ` 9t8t BY AREA � g III III III III III N II II III I I II III III $ z 'm III III III III n Ipy� I� I_ III III S III W 7llShr---- �r--- 5 IWy� III pl I \ 1 I H U II I N III H II \` fy IIII I I II III III I I i v m,_ IIII III� III IQ III III ;Y I///� III I I 11 I Ill _ P III m I III III III � 0.9 JS I v I III I III III I I � \y '/X� 0 I III I III III III \ � ♦ } I II II III Y9t0 Y9 I �• I III III `a III II I IP hl III w 0 I III III I I � r III I III III III � i 10111 III III III I�0 m III m III NI a 1 9ai I ie II ;' u m o I I III III Of W II to III Tr III I III III Z \\V\ /. 1. ass —•-- � J � _ <Ygt \ 1 __ III II III III W � _ _ III I I 0] III o' 1 9A, I � I 1111111 � o p� 1111/111 a`J e9A4 III`y n94] / z , n5 0 0 IIII III �p ____ AN neAs �� i' III ;it to III m III III w w m > m III III pl III III III dI ti' / _._ _ o u a z IIII I III III I I I, r �_-- is 9" 1 II A III /� I III III III , 1 L _ I u 1 11 III I III I IIII III 10 141 ��. III III IU l 11 lii / d (A m III III III • pl It_ _- I 20 10 0 20 aD Q II III it III III — ORIGINAL SCALE: 1" = 20 Of J II IIII III III I III NIII III III \ Ij i-sa\ xU7 lY III NI III III III I III III Q W III Ed III W III III III III' PREPARED UNDER THE DIRE OFW Q IIII m U II III III III II III I N IIII III II II I ', jj1 -_ III III �� III i III III U iIn I�1 111 O U 12� ILLI S a _ O 2v �49 SHEET 1 OF 1 J RS JR. DATE COLORADO P.E. No. «ass JOB No. 39671.00 FOR AND W BDUAL OF AENWNEERING RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Lot 2 - Tower Shoppes PUD PROJECT NO: 39671.00 COMPUTATIONS BY: jmj DATE: 111112011 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Sidewalks (concrete): Roofs: Lawns (flat <2%, sandy soil): Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.10 0 JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 8525 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.ft) SIDEWALK AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) PROPOSED 0.90 39,153 3626.67 22,372 4,133 9,022 0.75 Equations - Calculated C coefficients & % Impervious are area weighted c=�(C,A1) 0 At C; = runoff coefficient for specific area, A; A; = areas of surface with runoff coefficient of C; n = number of different surfaces to consider A t = total area over which C is applicable; the sum of all A is 3967100-c-eval-proposed only.xls proposed project does not need to provide additional storm water improvements. Therefore, the storm water management design approved with the Sonic Drive -In, and updated with this addendum is assumed adequate for the construction of the project. We greatly appreciate your time and consideration in reviewing this submittal. If you have any questions or required additional information please call (970) 222-1317. Sincerely, JR Engineering Prepared by, John E. Meyers Jr., P. Project Engineer and Reviewed by, Michael S. Brake, P.E., P.L.S. Principal and Vice President January 11, 2011 Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 J•R ENGINEERING A CL•arian compzn7 RE: Lot 2 Tower Shoppes PUD - Drainage Addendum for Firehouse Express Carwash Dear Wes, JR Engineering is pleased to submit, for your review and approval, this addendum that describes the proposed drainage conditions for the revised layout for Lot 2 of the Tower Shoppes PUD. This addendum references the originally approved drainage report entitled "Final Drainage and Erosion Control Report for Tower Shoppes PUD" prepared by RBD Engineering Consultants dated June 7, 1995 and an addendum to the study from 2005. The addendum, entitled "Final Drainage and Erosion Control Report for Sonic Drive -In — Lot 4, Tower Shoppes P.U.D., " prepared by Interwest Consulting Group and dated June 29, 2005, updated the original design with current City drainage requirements. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria dated May 1984, revised April 1997. The revised plans for Lot 2 includes an automatic car wash building and self serve vacuum bays in the paved parking lot. Calculations included in the attachment show that the runoff coefficient of the proposed site will remain within 1 % of the coefficient for the same site under the previously approved plans. Although a slight increase is indicated, it is our opinion that the increase is negligible. In addition, the intent of the proposed design is to maintain the drainage patterns associated with the previously approved plans. This includes stormwater entering the swale in the southeast corner of the site. In the approved addendum for the Sonic Drive -In, the report discusses the regional detention pond capacity and states the following: "Thus detention for Lots 2 and 4 will be provided in the regional pond and on -site detention for Lots 2 and 4 will not be required." The report goes on to discuss water quality for which it offers a design that, "is located in its final location and is sized to provide the required amount of water quality enhancement for all of the Tower Shoppes P.U.D. to be developed." The above mentioned revisions have been designed with provisions for safe and efficient control of stormwater runoff in a manner that will not adversely affect the stormwater system. Due to the fact that the attached calculations indicate a negligible difference in discharge when compared to the original design, and the approved design states that both water quality and detention is provided by existing facilities, it is evident that the Ti-iE Wo�, COMPANIES 1800 Broadway, Suite 210 * Boulder, CO 80302 January 27, 2011 Re: Firehouse Car Wash — Lot 2 Tower Shoppes PUD To whom it may concern: This letter is to acknowledge and approve the intended entry way improvements to the Tower Shoppes entrance off of Timberline Road within Lot 1 Tower Shoppes PUD per the submitted Firehouse Car Wash Project Development Plans by C-Three, LLC, with the understanding that any improvements requiring restricted vehicular and/or pedestrian access shall be constructed during non - business hours in a mutually agreeable manner. Additionally, WW Reynolds intends to grant an emergency access easement across Lot 1 Tower Shoppes PUD as required for the approval of the Firehouse Car Wash project. Furthermore, WW Reynolds acknowledges and supports the amended Tower Shoppes PUD plans as submitted by C-Three, LLC on behalf of WW Reynolds, subject to WW Reynolds approval of the exact location and configuration of the proposed easement, and the terms and conditions of the specific grant of easement. Authorized signature and title for WW Reynolds: Name: Title: Fire House Xpress Car Wash conceptual schedule Jan 20- submit to City for review Mid Feb award contract to General Contractor end Feb apply for building permit end of March break ground grand opening mid July C-Three LLC Owners Jason Luy/ Jen Luy 3527 Hearthfire dr Ft Collins, CO 80524 970-214-1499 Jim Houck/ Kara Houck 3520 Hearthfire dr Ft Collins, CO 80524 970-222-7624 Doug Lee/ Wendy Lee 5906 Falling Water Dr Ft Collins, CO 80528 970-219-5320 PDQ of the Rockies John Brinkman 8214 East Park Meadows Dr Lonetree,CO 80124 303-662-9100 YR ENGINEERING A Company LEGAL DESCRIPTION Lot 2, Tower Shoppes PUD, City of Fort Collins, Colorado. 7200 E. Alton Way. Suite C100, Centennial. CO 80112 970-222-1317 • oww.jreneineering.com Given the proposed carwash use, pedestrian circulation within the property is expected to be minimal. The existing Timberline Road pedestrian trail is to remain in place. The existing attached sidewalk stub following the north curb of the entry drive is to be removed as a part of this project. Buffering. The land use of the proposed car wash on Lot 2 is compatible with the automobile -oriented retail and commercial uses allowed within the Tower Shoppes PUD, as approved. Current users within the PUD include a drive - through McDonald's and Sonic restaurant, while Lot 1 remains vacant. Buffering between Lots 1 and 2 is not anticipated at this time. The northeast corner of Lot 2 is over four hundred feet from the nearest corner of the Fort Collins High School building (generally to the northeast), with the school bus drop off acting as a buffer between the two uses. Evergreen and shrub plantings are proposed along the north wall of the car wash to provide a visual transition from the school property. A colonnade of Linden trees on the school property following an existing sidewalk provides an additional buffer from the school. The nearest residential property is over 400' from the southeast corner of the property, south of Horsetooth Road. Currently, portions of Lot 2 are only partially visible from ground level south of Horsetooth Road due to the existing McDonald's and Sonic buildings. Statement of proposed ownership and maintenance of public and private open space areas; applicant's intentions with regard to future ownership of all or portions of the project development plan. C-Three, LLC, the developer of the property, will own and operate the carwash business. No open space, public or private, is proposed within Lot 2. Landscaped areas within Lot 2 will be privately maintained, along with the small portion of right of way near the southwest corner of the property. Estimate of number of employees for business, commercial, and industrial uses. The total number of employees at the carwash facility is unknown, although a typical shift will generally not exceed two employees. Should additional employee parking be required, vacuum stalls may serve as overflow parking. Narrative description of how conflicts between land uses or disturbances to wetlands, natural habitats and features and or wildlife are being avoided to the maximum extent feasible or are mitigated. Following approval of the Tower Shoppes PUD in 1995, Lot 2 was graded and seeded, and appears to have low habitat value. The property is currently vacant, and no wetlands exist on the property. The existing trees on the property to be removed are being replaced with larger trees, as required in the Land Use Code. Name of the project as well as any previous name the project may have had during Conceptual Review. Lot 2 of the Tower Shoppes PUD is being submitted as the Firehouse Express Carwash. No other names have been proposed. Page 2 of 2 t,. Statement of Planning Objectives Firehouse Carwash Express — Lot 2, Tower Shoppes PUD City of Fort Collins, Colorado Specific City Plan policies being implemented with this project are: Policy CAD-3.1, "Modification of Standardized Commercial Architecture;" The building shell of the carwash facility has been designed to reflect the appearance of a fire station, complete with a red brick tower, to pay tribute to the applicants' backgrounds as firefighters. Policy CAD-3.2, "Compatibility with Surrounding Development;" The most significant architectural element in the area is the Fort Collins High School. Building colors on the carwash will be generally neutral grey with red brick accents to complement the high school architecture. Cornices will define the roof line, further reflecting the school's design. Policy CAD-4.1, "Crime Prevention and Building Security;" and, The location and orientation of the building relative to the vacuum stalls minimizes potential hiding places and maximizes visibility through the site. Policy CAD-4.2, "Lighting and Landscaping." Lighting and landscaping are proposed to be consistent with existing commercial development in the area. The proposed landscape palette uses materials that were approved and installed with the original Tower Shoppes PUD. Description of proposed open space, wetlands, natural habitats and features, landscaping, circulation, transition areas, and associated buffering on site and in the general vicinity of the project. Open Space. No additional open space is proposed with the project. A major pedestrian trail paralleling Timberline Road was built on Lot 2 as part of the first phase of the Tower Shoppes PUD, and is proposed to remain in place. Wetlands, Natural Habitats and Features. The subject property was graded for development in 1996, and landscape along the entry drive and Timberline Road was installed at approximately the same time. The most significant features near the property are stands of mature trees, particularly west of Timberline Road. Landscaping. The landscape design uses plant materials that are consistent with the Tower Shoppes PUD, as constructed. Existing trees on the property to be removed to accommodate the proposed use are to be replaced with similar species at a larger size. All of the plant material is consistent with the City's plant list and hydrozone requirements. Circulation. Vehicular access to the property is via Timberline Road, north of Horsetooth Road, via the entry drive already built with the first phase of the Tower Shoppes PUD. The entry drive is proposed to be reconfigured to allow improved access. Page 1 of 2 y�❑ Lighting Plans (7 copies 24" x 36" — folded). �► �N� 01b Hazardous Materials Impact Analysis (3 copies). ,Y(n Street cross sections schematics (if not included in the utility plans) (8 copies 24" x 36" — folded). ❑ Explanation of any variance request(s). ❑ Signed letters of intent indicated that all required off -site easement and off -site rights -of -way can be negotiated in time for final development plan submittal. ❑ Other information that the Director may require: — Natural area or environmental study (4 copies)' — Wetland Delineation (4 copies) 'This document is meant to be used as a checklist only. For a more detailed list and explanation of each of these items, please see the handout: "Submittal Requirements: Project Development Plan" Revised March 3, 2010 2 PDP Submittal Requirements Fcof o'rt�Collins E?edveloprnent Refw-Guide S7 SUBMITTAL CHECKLIST: PROJECT DEVELOPMENT PLAN (PDP) The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Community Development and Neiahborhood Services Department. ❑ Application form, filing fee (plus .75 cents for each APO label), and sign posting fee. Application Form.pdf ❑ Transportation Development Review Fee — please contact Engineering at 221-6605 for information. TDR Fees and Application.pdf ,5�Three lists (3) of names and addresses of all owners of record of real property within at least 800' of the property lines for the parcel of land for which the project is proposed, exclusive of public right-of-way. (Two (2) lists typed on mailing labels (33 names per sheet) and the other list on a reproducible copy of those labels). I ( i-A I(rf;Ltt Lit" Statement of planning objectives (31 copies). Copy of applicable conceptual letter and response letter explaining how issues have been addressed (31 copies) # Complete list of proposed street names for the development. Legal description of the site (one copy on 8'/2 x 11" sheet). Name and address of each owner of property within the boundaries of the development plan area. List of names of all general and limited partners and/or officers involve as either applicants or owners. ❑ Development phasing schedule. �ite plan drawings. (Refer to the submittal requirements for specific information to be presented on the site plan.) (31 copies 24" x 36" — folded). `0 ❑ Subdivision Plat (23 copies 24" x 36" —folded). .01'Architectural elevations copies 24" x 36" folded). /Landscape Plan (Refer to the submittal requirements for specific information to be presented on the landscape plan.) (21 copies 24" x 36" — folded). Transportation Impact Analysis (TIA) (7 copies). All�utility plans (existing and proposed utility systems) (17 copies 24" x 36" — unfolded). Utility Plans Checklist.pdf /Requirements for utility plans checklist (1 copy). ;Ylbrainage and erosion control report (4 copies). Soils Report (3 copies). . Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580 art Collins Site Address: Transactions Community L elopment & Neighborhood Services 281 N. College Ave Fort Collins, CO 8o522 970.221.676o 970.224.6134 -fax BMISC110 BUILDING PERMIT #: 038 Permit Type: General Method Check Number Date Paid Amount Paid Comments Fund Transfer CK # NA 01/26/2011-$250.00 TRANSFERRING THE $250 FOR THE MINOR AMENDMENT FROM THIS RECEIPT TO MA1100007 - BALANCE IN TDR SHOULD BE 2,880 - SL Check CK# 1007 01/20/2011 $7,096.25 PAID BY C-THREE LLC CK #1007 Receipt issued: 01/26/2011 Total Paid to Date: $6,846.25 Fee Description Account Code Fee Amount Amount Paid Planning: Dev. Review 1000.444040 $3,887.00 $3,887.00 Planning: Mailings 1000.444050 $29.25 $29.25 Planning: Sign Posting 1000.444050 $50.00 $50.00 Transportation Dev Review 902010.444030 $2,880.00 $2,880.00 TOTAL FEES: $6,846.25 $6,846.25 Date Paid Amount Due 01/20/2011 $0.00 01/20/2011 $0.00 01/20/2011 $0.00 01 /26/2011 $0.00 $0.00 TOTAL BALANCE DUE AS OF 01/26/2011: 0.00 Fee Amounts are valid for date of this document only. Fees subject to change without notice. Form Revised October 2008 Accela Automation: ShowPayD-`zi140 - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS COMMUNITY DEVELOPMENT 8: NEIGHBORHOOD SERVICES 281 N. COLLEGE AVE 970.221.6760 PO BOX S80 970.224.6134 - fax Application # : BMISC110038 Project Name (Subdivision) : FIREHOUSE XPRESS CAR WASH Application Type : Building / Misc / General / NA Receipt No.: 159075 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 1007 $7,096.25 01/20/2011 02:30:31 PM KTHARP PAID BY C-THREE LLC CK #1007 Owner Info.: Work POP SUBMITTAL FIREHOUSE XPRESS CAR WASH PLANNING FEE 3887.00 Description: SIGN POSTING $50.00 APO LABELS (39) $29.25 TOR FEE $2880.00 MINOR AMENDMENT $250.00 T8108-D Version 4.0 https://dtsweb02.fcgov.com/operations/perniitlindex.cfm?FUSEACTION=ShowPayDetail... 1 /20/2011 City of Transpot-W` in Development Reyiew FeP Date Received/ Paid 1'7'0'17 Fit Collins 24otal Amount Paid 300,00 POT Project Name: k&-hogip, )�t*SS L tArUlash Project Location: 3500 6Timbgkw1L Date: Type of Submittal Please indicate the type of application submitted by checking the box Foot Notes: preceding the appropriate request(s). When a development project involves a change of use for a Fee structure amount due building, the charge per square foot shall apply to the portion of ❑ Overall Development Plan (ODP) $500 each the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing ❑ Final Development Plan (FDP) use, as determined by the current Institute of Transportation This fee includes 2 rounds of review $1000 each Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for ❑ Additional round of review $ 500 each shall apply only to the net additional building size (if any). ❑ Annexation $20 X _ acres = _ + $250 = These fees do not include the cost of filing fees for the recording of Minor Amendment $256 each the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be ❑ Major Amendment $2,500 each responsible for the cost of recording the document. Said filing fees ❑ Re -zone $200 each shall be calculated and provided when the signed document is retuned to the City for signatures and filing. ❑ Modification to Land Use Code $200 each *** This fee does not include the cost of filing fees. Filing ❑ Wireless Telecommunication Equipment (WTE) $65 each fees shall be determined at the time of final document ❑ Road Projects acres (of roadway) X $250 = submittal and will be required prior to filing. ❑ Vacation of Easement(s) *** # of vacations _ X $400 = 0 Vacation of Right(s)-of-Way *** # of vacations _ X $800 = ❑ Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications _ X $250 = Multifamily or other residential units $115 per unit # of units X $115 = ------- --- -- - — -- --- --- -- - -- Commerctal, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot j6sq ft X $0.25 = Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 = Project fee $2,000 each $2.000 11 General Information: , ,, Owners Name(s): _ibr t�&A Street address: 3 f 2 itleof 1t ' �/ Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. \ Detached Single Family $160 per unit City/State/Zip: _r—T 4oIIt, U S NP1 # of units X $160 = Telephone. Fax Applicants/ Consultants Firms Name: Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + r/z (the amount over 30,000 I = The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing - a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP cc:. Christie White, Engineering Development Review Engineering Contact: Street address: City/State/ Zip: � Telephone: Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (pleas JGftLS V Signature: n Telephone: CIiQ Type of Request Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Additional handouts are available explaining the submittal requirements for each of the following review processes. ❑ Annexation Petition with Initial Zoning REQUESTED ZONE: _ Fee $1,188.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Rezoning Petition REQUESTED ZONE: Fee $977.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Overall Development Plan (ODP) Fee: $1,599.00 + $50.00 sign posting fee + $.75 for each APO label lD Project Development Plan (PDP) without Subdivision Plat &btb Fee: $3,887.00 + $50.00 sign posting fee + $.75 for each APO label .3 a#I. aS ❑ Project Development Plan (PDP) with Subdivision Plat Fee: $5,879.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Final Plan without Subdivision Plat Fee: $1,000.00 ❑ Final Plan with Subdivision Plat Fee: $1,000.00 ❑ Modification of Standards/Text and Map Amendment Fee: $200.00+ $50.00 sign posting fee ❑ Basic Development Review Fee: $200.00 ❑ Major Amendment Fee: $3,206.00 + $50.00 sign posting fee + $.75 for each APO label ❑ Non -Conforming Use Review Fee: $1,389.00 ❑ Vacation of ROW or Easement Fee: $5.00 per sheet of filing document ❑ Small Project Fees Fee: Varies -Check with the Current Planning Department ❑ Street Name Change Fee: $5.00 ❑ Extension of Final Approval Fee: $566.00 ❑ Site Plan Advisory Review NO FEE ❑ Addition of Permitted Use Fee: $500.00 + $50.00 sign posting fee + $.75 for each APO label Revised January 21, 2010 2 PDP Submittal Requirements City of Fort Collins DEVELOPMENT REVIEW: APPLICATION FORM For Office Use Only Date Submitted Current Planning File #�// Planner Project Name: Firk-hadit- i%ffsSS Cnrwach Project Location (Street Address): yTIA6kiu- Land Use Information: Gross Acreage/SquareFootage: Existing Zoning: �v C Proposed Use: f�- n+�Jjt vf,04� Total Number of Dwelling Units: Total Number of Affordable Dwelling Units: Percentage of Affordable Dwelling Units (out of total): Total Commercial Floor Area: _itrl 3i0 Additional Information (if Applicable): Project Description: TuricI Cor Wqh (Choose the type of project from the list on the back) General Information: List all property owners having a legal/equitable interest in the property (attach separate sheets if necessary). Owner's Name(s): Jie3 oovdj< Street Address: UM Gh+N, „ram r City/statelZip: (-T 1'z 1fil/� [. (Z_� Telephone: q76 ZZi=% Fax: Applicant's/Consultant's Name: Name of firm: Contact Street Address: City/State/Zip: Telephone: Fax: E-mail: CERTIFICATION I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if necessary, for posting of public notice on the property. Name (Please PRINT): L, , V• .ZO11< C~TAA& L&(- Address: OS�kO% gzaP44f& d4. F-t 4011� ✓ o Cd Telephone: ! f 70-122-^i624 Sig re: d title showing authority to sign, if applicable) 6-r U- I✓ '*CERTIFICATION MUST BE SIGNED:.p Community Development & Neighborhood Services - 281 N College Ave - Fort Collins, CO 80522-0580