Topic: 6enerni
Number: 32
Created:4/23/2003
Len Hilderbrand of Xcel Energy indicated that Public Service Company has an
existing gas main in a 10' wide easement along the north edge of the proposed
project.
JRESPONSE: CSU will contact Len regarding their gas line and easement.
Number: 33
Please see the enclosed red -lined Site Plan with several comments/concerns.
/RE5PON5E: The curb cut on Centre Ave. is restricted to maintenance and
emergency vehicles only, general public and client vehicles will not be allowed
access to the site through this curb cut.
This development proposal has been scheduled for an administrative public
hearing on Thursday, May 8, 2003 in conference rooms A - D at 281 North
College Avenue. The hearing will begin at 4:00 p.m. and this item is one of
several scheduled for that date. An agenda will be prepared at a later date but
prior to the hearing.
The comments and concerns expressed in this letter can be and should be
addressed with the required Final Compliance submittal following the public
hearing for the PDP. Please check with Steve Olt for submittal requirements.
Be sure and return all red -lined plans from City staff when you submit Final
Compliance.
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at (970)221-6341.
Yours Truly,
Steve Olt,
City Planner
Page 5
I.
Number: 28 Created: 4/21/2003
A floodplain use permit is required for this site before any construction takes
place.
✓ RESPONSE: CSU will obtain a floodplain use permit from the City.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 15 Created: 3/28/2003
Staff recommends that adequate bicycle parking facilities be provided for
visitors, not only to the ropes course, but to the planned arboretum and soccer
fields.
/RESPONSE:
Existing bicycle parking is provided for at the parking lot.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 20 Created: 4/16/2003
Will water and sewer services be required for this project? If so, show and
label.
RESPONSE: Water and sewer is not required for this project.
Number: 21 Created: 4/16/2003
Provide a grading plan that shows any changes that would affect exiting water
and sewer lines in the vicinity of this site.
✓RESPONSE: CSU does not plan to change any existing grades. Existing utilities
have been designed around and will not be impacted by the project.
Number: 22 Created: 4/16/2003
Field locate, show and label all existing water and sewer lines in this vicinity.
See project development plan for other comments.
RESPONSE: All utilities will be field located and labeled at CSU's expense prior
to start of the project.
Department: Current Planning Issue Contact: Steve Olt
Page 4
exterior impacts. Access between parking and the ropes course will not be
inhibited and will not restrict wildlife movement along the ditch.
Perimeter fencing will not encroach on the ditch and will not limit wildlife
access to Spring Creek.
Number: 30
Created:4/23/2003
If bridge construction results in the disturbance of wetlands the disturbance
should be restored.
RESPONSE: Construction of the bridge will not occur in a wetland area, and any
disturbances resulting from construction will be restored.
Department: Stormwater Utility
Topic: Stormwater
Number: 25
Issue Contact: Wes Lamarque
Created:4/18/2003
Is any grading being proposed? A grading plan is required if any grading is to be
done. Also, no fill is allowed in the floodplain.
RESPONSE: CSU does not plan to alter the current grades. Minor grade
changes may be required for accessibility between the pedestrian bridge and
the ropes course. Existing vegetation on the course will be removed and
replaced with native grasses.
Number: 26
Created:4/18/2003
Irrigation approval is required on the plans for any improvements, like the
bridge, in the ditch easement or right-of-way.
✓RESPONSE: CSU will provide plans for irrigation and the bridge. CSU will also
obtain a crossing agreement from the ditch company for the bridge.
Number: 27 Created: 4/18/2003
No bathroom, or any habitable structure, can be located in the
floodplain/floodway.
/RESPONSE: Restroom facilities have been deleted from the project. CSU
does not plan on constructing any habitable structure in the
floodplain/floodway.
Page 3
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 16 Created: 4/2/2003
Light & Power will need to know site dimensions, including area and length of
property line along Centre Ave. (street frontage).
✓RESPONSE: The property is
line along Centre Ave. is
Number: 31
feet.
square feet, and the property
Created: 4/16/2003
Development of this site will initiate Light & Power development charges. In
order to determine these charges, Light & Power will need to know site
dimensions (both square footage and front footage along Centre Avenue).
✓ RESPONSE: The site is
Centre Ave. is feet.
Department: Natural Resources
Topic: General
Number: 29
square feet. The property line along
Issue Contact: Doug Moore
Created;4/23/2003
The Natural Resources has data from past projects in the area that conclude
that ditch that runs between the proposed course parking lot and the course
serves as a wildlife movement corridor which the Fort Collins Land Use Code
(3.4.1(E)) would protect with a 50' Natural Habitat and Features Buffer Zone.
Due to the wildlife movement around this ditch lighting of the project should be
dealt with in a sensitive manner. The security lighting located along the fencing
should be design to light as minimally as possible. Lighting at the gates should
light only the gates and be directed in toward the course. Lighting along the
fencing on the north side should be relocated closer to the course and light only
the course. The project should also be design so that pinch points for wildlife
movement don't occur limiting movement between parking and fencing. Fencing
should not also limit wildlife movement between the ditch and Spring Creek with
also serves as a wildlife movement corridor (3.4.1(F%2�.
►RESPONSE: The ropes course has been specifically designed with minimal
security lighting. The course will not be operated in night-time conditions. All
lighting will be focused toward the interior of the course in order to minimize
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Colorado State University
Facilities Management
c/o Fred Haberecht
Facilities Services North
Ft. Collins, CO 80523-6030
Date: 4/23/2003
Staff has reviewed your submittal for CSU ROPES COURSE @ C.A.T.,
PROJECT DEVELOPMENT PLAN (PDP) - TYPE I (LUC) #53-858B, and we offer
the following comments:
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: Genera/
Number: 23 Created: 4/16/2003
Fence shall not encroach into/onto the Ditch Company easement/right-of-way
without their permission.
RESPONSE: The fence will not encroach on the ditch.
Number: 24 Created: 4/16/2003
Additional comments with more complete submittal. Future phases may
generate additional comments as it relates to parking, access road, rest room
facilities and etc.
RESPONSE: CSU plans to utilize the existing CSU parking lot north of the
ditch for parking. Rest room facilities were deleted from the project.
Topic: Transportation
Number: 18 Created: 4/7/2003
Need to dedicate easement for electric and any other facilities that may be
required for this phase.
RESPONSE: CSU is working with the ditch company to establish a crossing
agreement for utilities and access.