Cityof_ Planning and Zoning COMMENT SHEET
PO Box 580
Fort Collins. CO 80522-0580
Fax: 970-41 h-2020
DATE: December 5, 2007
TO: County Assessor
PROJECT PLANNER: Steve Olt
# 38-07 TOLMAR SUBDIVISION EXPANSION
(701 CENTRE AVE) PDP — TYPE I
Associated with #53-85 (Atrix Laboratories —C.A.T. 8th Filing)
Please return all comments to the project planner no later than the staff
review meeting:
December 26, 2007
Note - Please identify your redlines for future reference
No Problems
[f Problems or Concerns (see below, attached, or DMS)
C 0w1v,,Lo-6 Ref TVARMA (fit)) QRS
0
Name (please print)
< ae� �E9�-7a6s�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
I Z� PROJECT
Cityof_ Planning and Zoning COMMENT SHEET
PO Box 580
Fort Collins. CO 80522-0580
Fax: 970-416-2020
DATE: December 5, 2007
TO: Technical Services
PROJECT PLANNER: Steve Olt
# 38-07 TOLMAR SUBDIVISION EXPANSION
(701 CENTRE AVE) PDP — TYPE I
Associated with #53-85 (Atrix Laboratories —C.A.T. 8th Filing)
Please return all comments to the project planner no later than the staff
review meeting:
q. TI-�e � N &7- !� .9� G A.Sc mcJ�9- — uJ/ �L wrc�
T74- u l ` n"f December 26 2007
�a ?
Note - Please identify your redlines for future reference
�, BOZIND� %JOE.i n16 % 26O5E.
Z, C3ou,tiafi�y Do c S Nam- /�7RTGF1 Tf/t ,4 TlIaX La9�R� ;-v./�1~S OGAT,
❑ No Problems
0 Problems or Concerns (see below, attached, or DMS)
Z. I F % r/t✓ /3Z 5,r ;4,1T d F Lo r 2 J,4J L_ E-e-a w -41 S1406Vni
Di,l lq72i)e 6�,3. tcfr 7?Va-&1 T-rfe- Ti -za. aF 7 4/1 12&/"T
,07e U S ra 120' o Cr N _ L�jA� /Ala 6a1 7,6
LeZIM
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
—Plat _Site _Drainage Report _Other
_Utility _Redline Utility —Landscape
Number: 28 Created: 12/26/2007
[12/26/071 Will there be a conflict between the proposed storm sewer and
the existing sanitary sewer service at the crossing in the northeast part of
the site?
In review, to be addressed at final.
Number: 29 Created: 12/26/2007
[12/26/071 What is stored in the UG storage tank? Where is the new
proposed location?
Information and details submitted to Carie Dann. New location noted on plans.
Number: 30 Created: 12/26/2007
[12/26/071 It would be helpful to schedule a meeting to review these
comments and potential concerns.
Have met with Roger, January 3, 2008.
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 1 Created: 12/ 18/2007
[12/18/07] No comment
Be sure and return all red -lined plans when you re -submit documents.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt
City Planner
cc: Susan Joy
W.P. Carey and Co. LLC
Planning & Zoning file #38-07
Page 8
6. Please clearly specify how disturbed areas will be vegetated in the
interim period, prior to Phase 2 or Phase 3 construction.
To be addressed at final.
7. Any work within the ditch right of way will require ditch company
approval.
Ditch company has been contacted and sent plan for review.
8. Please provide a hydrology and detention pond summary table on
drainage plan.
To be addressed at final.
9. Please provide a silt fence along the ditch during construction of the
line around the ditch. The detention pond should have a sediment trap
during each phase of construction. Please provide a phased erosion
control plan.
To be discussed with Basil and addressed at final.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 25 Created: 12/26/2007
[12/26/07] Provide a blow-up of the area where the proposed re-route of
the fire line and domestic water service is shown. It appears that the re-
routes (particularly the fire line) are much too close to the proposed building
addition on the north side of the building.
Met with Roger and have revised plans.
Number: 26 Created: 12 / 26/ 2007
[12/26/071 The Phase 2 and Phase 3 utility plans both include the re-route
of the fire line and domestic water service. Please clarify.
Revised notes per phasing.
Number: 27 Created: 12/ 26/ 2007
[12/26/07] What is the function of the valve shown in the east part of the
north parking lot adjacent to Centre Avenue?
This valve is being investigated with help of Roger.
Page 7
Department: Transportation Planning Issue Contact: Denise Weston
Topic: Transportation Planning
Number: 6 Created: 12 / 21 / 2007
[ 12 / 21 / 071 Please provide sidewalk connectivity externally with Centre
Avenue for Phase 1 and internally for access to all proposed buildings.
Please label clearly with width on site plan.
Revised layout per conversations with Denise. -- Ail. kz%e AANeAAAv .*AA37
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Plat
Number: 21 Created: 12/24/2007
[12/24/071 Please exclude the building envelope including future phases
from the blanket access utility and drainage easement.
Plat has been revised per comments.
Topic: Stormwater
Number: 14 Created: 12/24/2007
[12/24/071
1. Please provide a revised erosion control plan and calculations for
erosion escrow.
To be addressed at final per conversations with Basil.
2. At final please provide profiles with 100 year HGL for all proposed storm
lines.
At final.
3. Please recalculate the detention requirements for the site with these
revised impervious areas as shown for all phases of construction.
To be discussed with Basil and addressed at final.
4. Please check for potential conflict between storm line and sanitary
service line.
Conflicts have been reviewed.
5. Call out all proposed and existing storm lines and inlet sizes and types
on overall utility plans.
In progress and will be complete at final.
Page 6
Number: 13 Created: 12/24/2007
[ 12 / 24 / 071 Sheet 7 shows the temp asphalt driveway into the new parking
area wider than the 24' drive aisle which will cause the car in the first stall
to "stick out".
The temp asphalt driveway has been modified as requested.
Number: 18 Created: 12/24/2007
[12/24/07] Please dimension all existing and proposed sidewalks (can do
this once on the Ultimate Horizontal Control Sheet and be done with it).
Existing and proposed sidewalks have all been dimensioned.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 31 Created: 12 / 26/ 2007
[12/26/071 Electric development charges will apply for the previously
undeveloped portion of this site. These charges will apply even if no
additional power is required, and will be payable as a condition of continued
electric service to the site. Please contact Doug Martine at Light & Power
Engineering (224-6152).
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 2 Created: 12 / 21 / 2007
[12/21/071 AUTOMATIC FIRE SPRINKLERS: The proposed building
addition shall be equipped with approved automatic fire sprinklers.
To be addressed by architect at final
Number: 3 Created: 12/ 21 / 2007
[12/21/07] EMERGENCY ACCESS EASEMENT: The EAE shall be posted
with approved fire lane markings (no parking signs and/or red curb paint).
Top be addressed at final per further discussion with clients and PFD.
Number: 4 Created: 12/21 /2007
[12/21/07] UST: What does the current underground storage tank hold?
What will the proposed, relocated UST hold?
Information and details have been submitted to Carie Dann for review. Additional
notes to be added if required at final.
Page 5
[12/24/071 Please add 701, 1601, 1602, 1603, 1606a, 1607.
All details noted have been added.
Number: 17 Created: 12/24/2007
[12/24/071 Please label all onsite details as "On -site"
To be updated at final.
Topic: Utility - General
Number: 8 Created: 12/24/2007
[12/24/071 Centre Avenue is considered a Collector street on the Master
Street Plan. 50' parking setbacks from Centre Avenue apply and it appears
that one parking stall will be eliminated.
Parking stall removed to meet 50" setback requirement.
Number: 9 Created: 12/24/2007
[12/24/07] Please remove the proposed ground sign shown at the driveway
off Centre. Signage is requested through a separate permit at the time of
building permit.
Proposed ground sign has been removed.
Number: 10 Created: 12/24/2007
[12/24/07] Please add the following street cut note to both the
Ultimate/Phase 2/Phase 3 Demo, Horizontal Control and Grading sheets:
Note has been added as requested above.
Limits of street cut are approximate. Final limits are to be determined in
the field by the City Engineering Inspector. All repairs to be in accordance
with City street repair standards.
Number: 11 Created: 12/24/2007
[12/24/07] 15' radius curb returns are required off Centre Avenue (10' are
shown) .
Both entrance radii have been modified to 15"
Number: 12 Created: 12/24/2007
[12/24/07] Please remove D 14 from sheet 19 and replace it with detail 707
(high volume driveway). Please design and construct both driveways in
accordance with 707.
D14 has been replaced with 707 and entrances modified per 707 detail.
Page 4
Number: 20 Created: 12/24/2007
[12/24/07] All of my comments can be addressed in Final Compliance.
This project is ready for hearing.
Topic: Plat
Number: 22 Created: 12/24/2007
[12/24/07] The blanket access, drainage and utility easements don't quite
work because it puts your buildings smack dab in them. Need to plat
around them...
Plat has been updated per comments.
Number: 23 Created: 12/24/2007
[12/24/07] Not sure what the additional 1' UE is for along Centre
Avenue... wouldn't this be included in the larger overall UE, Access and
drainage easement? Also, the sidewalk is located within public row so the
sidewalk easement along Worthington and Centre Avenue is not necessary.
We don't have sidewalk easements - just access easements, so that would
also be included in the overall access easements. As a side
thought... wouldn't it be easier to call out a 15' UE on Worthington and a 9'
UE on Centre rather than splitting them up?
Topic: Site/Landscape Plans
Number: 24 Created: 12/24/2007
[12/24/071 These were submitted as a minor amendment and all
comments from this submittal (plat and utility plans) need to be coordinated
so that all plan sets match. Site and Landscape plans must be phased as
well.
Please time the Minor Amendment submittal with this one so that they both
come in at the same time. That way we can review all plan sets as a whole
and avoid a mix up at mylars - much appreciated!
Topic: Utility - Cover Sheet
Number: 7 Created: 12/24/2007
[12/24/07] Please remove the word "Preliminary" from the project title.
"Preliminary" removed from the project title.
Topic: Utility - Detail Sheets
Number: 15 Created: 12/24/2007
[12/24/07] There are several sheets that have been mis-numbered.
Sheets have been renumbered and corrected.
Number: 16
Created: 12/24/2007
Page 3
Stormwater/Basil Hamdan (224-6035)
a. The erosion control plan that was submitted is not sufficient.
To be addressed during final.
b. The phasing plan as submitted is not adequate.
To be addressed during final.
Planning/Steve Olt (221-6341)
a. With the exception of Utility Easements around the perimeter of the
site, plus a 10' wide Utility Easement and a 25' wide Emergency Access
Easement within the site, the entire property is a blanket Access,
Drainage and Utility Easement. This cannot be permitted because it
puts the existing building and proposed building expansions (plus
potential future buildings) in the Access, Drainage and Utility
Easement.
Plat has been updated and addresses these comments
Number: 33 Created: 12 / 28/ 2007
[12/28/07] The subdivision plat (plus utility plans) may be scheduled for
an administrative public hearing as soon as the comments and concerns
expressed in this letter are satisfactorily addressed. Another round of
"formal" development review is not necessary prior to the public hearing.
Please work directly with the various City departments by making the
necessary revisions to the subdivision plat and utility plans and submitting
copies to Engineering, Water & Wastewater, Stormwater, and Planning. The
sooner these revisions are submitted and reviewed by City staff the sooner
the public hearing can be scheduled.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 19 Created: 12/24/2007
[12/24/071 Sidewalk connectivity for pedestrian access must be provided
with each phase. You can do this with the ultimate concrete walk OR with
temp asphalt connections to be removed and replaced with concrete in
subsequent phases.
Revised plans per conversations with Denise Weston of Transportation.
Page 2
STAFF PROJECT REVIEW
JR Engineering, LLC Date: 12/28/2007
c/o Timothy J. Halopoff, P.E./Michael Walker, P.E.
2620 East Prospect Road, Suite 190
Fort Collins, CO 80525
Staff has reviewed your submittal for TOLMAR SUBDIVISION (701 IAWZ>5
CENTRE AVENUE EXPANSION) PDP - TYPE 1, and we offer the following
comments:
ISSUES:
Department: Current Planning
Topic: Fire
Number: 5
[ 12 / 21 / 07] No comments.
Issue Contact: Dana Leavitt
Created: 12/ 21 / 2007
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 32 Created: 12/28/2007
[12/28/07] The following comments were expressed at the City staff review
meeting on Wednesday, December 26th:
Engineering/Susan Joy (221-6605)
a. As shown on the Utility Plans that are part of the Tolmar Subdivision
process and on the Site Plan that is part of the Minor Amendment
process, there is a required 50' parking setback from Centre Avenue.
There appears to be one or more spaces that do not satisfy this
requirement.
One Space was removed to meet the 50' requirement.
Water & Wastewater/Roger Buffington (221-6854)
a. Water & Wastewater has some concerns with the Utility Plans. Roger
would like to meet with JR Engineering as soon as possible.
Met with Roger and will meet his requirements at final.
Page 1