Loading...
HomeMy WebLinkAboutCENTRE AVE. RESIDENCES - PDP - 17-09 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONReview Procedures), Article 3. General Development Standards, and Article 4. Districts (specifically Division 4.27, Employment Zoning District). The most pertinent sections of Article 3 (relative to this new multi- family residential development) are Sections 3.2.1 - Landscaping, 3.2.2 - Parking, 3.5.1 - Architectural Compatibility, and 3.5.2 — Residential Building Standards. Also, there are Land Use and Development Standards specific to the E District that development on this property will be subject to. Section 4.27(D)(2) in the Land Use Standards in the E District relates to Secondary Uses and their limitation to no more than 25% of the gross area of a development plan. This requirement will be evaluated against the most current, valid ODP for the Centre for Advanced Technology and not just the property containing this proposed site specific development plan. Copies of Article 3 and Division 4.27 are available in the Current Planning Department or on the City of Fort Collins website @ www.fcgov.com. Go to Departments, then the Current Planning Department. 11. The City's Current Planning Department will coordinate the development review process. The required submittal package will be submitted to the Development Review Center and distributed accordingly to other City departments and outside reviewing agencies involved in development review. The submittal requirements for Project Development Plans and Final Compliance Plans are available on the City's website. 12. The proposed multi -family residential use in multiple buildings is permitted in the E District as a Type 2 review. A public hearing in front of the Planning & Zoning Board will be required at the end of the staff review process for the PDP. See Section 4.27(B)(3)(a)4 of the LUC. 13. The applicant for this development request will not be required to hold a neighborhood information meeting prior to formal submittal of the project since a neighborhood meeting was conducted for the project during the request for a Modification of Standard in Section 4.27(D)(4)(a) of the LUC to allow the residential buildings to be 4 stories in height instead of the 3 stories permitted in the E District. The request was approved by the Planning & Zoning Board on January 15, 2009. P property; and, the buffer is measured from the top of embankment. A separate meeting is needed to review to site constraints to determine the best way to evaluate the impacts of intruding into the 50' buffer. Based upon meeting with Dana, we have provided a wildlife corridor area 12% greater than the requirement to off set the slight encroachment of building 1. b) Any trash enclosures proposed for the project shall comply with Section 3.2.5 of the LUC. Noted c) Consider recycling the existing asphalt. Noted Please contact Dana, at 224-6143, if you have questions about these comments. 8. Matthew Wempe of the Transportation Planning Department offered the following comments: a) Where will bicycle parking be located? Indoor or covered parking are preferred whenever possible. At a minimum bicycle parking should be located near a building entrance, on a hard surface, in a well -lit area. Noted. bike parking has been provided in a central area b) What is the gate/signage crossing the internal sidewalk along Centre Avenue (can't read note on plans)? All sidewalk connections should remain free and open, similar to all the other sidewalks on the site plan. There is no gate. A open arbor type structure is planed over the walk that will not impede pedestrian travel. The design of the arbor and walls will be shown on the final plans. Please contact Matthew, at 224-6058, if you have questions about these comments. 9. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the appropriate development review process (Project Development Plan and Final Plan) by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. Noted. 10. This development proposal is subject to all the requirements set forth in the City's LUC, specifically Article 2. Administration (Development 1J floor; a fire pump may be required to achieve the minimum pressure. 2006 International Fire Code Sections 905 and 913, Noted f) KEY BOXES REQUIRED Poudre Fire Authority requires a key box ("Knox Box") to be mounted in approved location(s) on every new building equipped a required fire -sprinkler system or fire -alarm system. 2006 International Fire Code 506.1; PFA BUREAU POLICY 88-20 Noted g) IDENTIFICATION OF FIRE PROTECTION EQUIPMENT Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, electrical rooms, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. 2006 International Fire Code 5 10. 1 Noted h) TURNING RADII The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3 Noted, in addition Auto Turn computer software was utilized to ensure PFA fire apparatus could navigate the site. i) STAIRWAY SIGNAGE Approved stairway identification signs shall be posted at each floor level in all enclosed stairways in buildings more than three stories in height. 2006 International Fire Code 1020.1.6 Noted j) ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 2006 International Fire Code 505.1 Noted Please contact Carie, at 416-2869, if you have questions about these comments. 7. Dana Leavitt, the City's Environmental Planner, offered the following comments: a) All aspects of this project shall comply with Section 3.4.1- Natural Habitats and Features of the Land Use Code (LUC). There is a 50- foot buffer along the canal that is the northern boundary of the 7 fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: 0 Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. 0 Have appropriate maintenance agreements that are legally binding and enforceable. 0 Be designated on the plat as an Emergency Access Easement. 0 Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D. Per meeting with (and recommendations from) Carie Dann, portions of internal drives have been widened to 28' and a 12' wide path through the site has been provided. The path was designed to accommodate a PFA truck. d) FIRE DEPARTMENT CONNECTION Fire department connections shall be installed remote from the buildings, and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. 2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy. Noted, see plans e) FIRE STANDPIPE SYSTEM Structures four or more stories in height and parking structures are required to be equipped with an approved fire standpipe system capable of supplying at minimum of 100 psi to the top habitable F d) Maintain a 40' horizontal separation between street trees and streetlights. Noted e) Street trees may be planted over the electric line. Noted Please contact Alan, at 224-6153, if you have questions about these comments. 6. Carie Dann of the Poudre Fire Authority offered the following comments: a) WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter; residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter; residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. 2006 International Fire Code 508.1 and Appendix Noted. b) RESIDENTIAL AUTOMATIC FIRE SPRINKLERS An automatic sprinkler system installed in occupancies in accordance with Section 903.3 shall be provided throughout all buildings with a Group R (Residential) fire area. (Exceptions: Detached one- and two- family dwellings and multiple single-family dwellings (townhomes) not more than three stories above grade plane in height with a separate means of egress.) 2006 International Fire Code 903.2.7 and 2006 International Building Code 101.2. The building will have sprinklers c) REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This c) Water quality treatment is also required as described in the Urban Storm Drainage Criteria Manual, Volume 3 — Best Management Practices (BMPs). The use of any of the BMPs is encouraged. If the existing detention pond is to be modified to include the water quality capture volume (WQCV), it must include runoff from the existing improvements to the east that drain to the pond. Another option is to provide water quality treatment for the new building onsite before it drains to the detention pond. Since the shared detention pond is existing and if adding the WQCV to the pond would cause major revisions and/or retaining walls; a variance could be requested to include the WQCV instead of expanding the pond and adding the additional capacity. Modifications to the outlet for water quality treatment would still be required. Since the detention pond is shared, there should be a maintenance agreement between all parties that drain to it. A variance is hereby requested to include the WQCV within the 100-yr detention storage volume. Please see the drainage report text for further discussion on water quality. d) The design of this site must conform to the drainage basin design of the Spring Creek Drainage Master Drainage Plan as well the City's Design Criteria and Construction standards. Noted. e) The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new impervious area over 350 sq.-ft. No fee is charged for existing impervious area. This fee is to be paid at the time the building permit is issued. Noted. Please contact Glen, at 224-6065, if you have questions about these comments. 5. Alan Rutz of the Light & Power Department offered the following comments: a) A C-1, Commercial Form is not needed for this residential development. The form is for commercial service. Noted b) Normal development charges will apply. Noted c) Coordinate transformer location with Light and Power. The transformer must be within 10' of a drivable surface. Noted 4 a) Existing mains: 8-inch water mains in both Worthington Circle and Centre Avenue; 8-inch sanitary sewer in Worthington Circle and 21- inch sanitary sewer in Centre Avenue. Noted. b) Any connections to the 21-inch sanitary sewer must be at a manhole. New sanitary sewer connections are proposed to the 8-inch main only. c) The existing water/sanitary sewer services stubbed onto the site must be used or abandoned at the main. The services will be utilized for Building 2. d) Development fees and water rights will be due at building permit. Noted. Please contact Roger, at 221-6854, if you have questions about these comments. 4. Glen Schlueter of the Stormwater Utility offered the following comments: a) A drainage and erosion control report and construction plans are required and must be prepared by a Professional Engineer registered in Colorado. Noted. b) The Final Drainage Report for the Seventh Filing of the Centre for Advanced Technology, dated August 5, 1988, provides documentation of the required release rate and detention volume. The site release rate is 1.38 cfs, and the volume is 1.45 acre feet. The release rate must stay the same unless a study is conducted to show that the downstream system has capacity for a higher release rate. The volume provided needs to be confirmed since there were no certification requirements in 1988. As long as the developed runoff coefficient remains the same (0.71) or less and the required volume does exist, no additional detention would be required. In other words, the original approved design is grandfathered even though one of the buildings was never built. If the runoff coefficient is increased, additional detention is required using the present rainfall criteria. The original utility plans show a storm sewer outfall system which runs along the west and south sides of the project site. Please see drainage report text for full response, and don't hesitate to call Northern Engineering at 221.4158 to discuss further. 3 d) Please contact Joe Olson, the City's Traffic Engineer at 224-6062 and Transportation Planning at 224-6058 to schedule a seeping meeting for the Traffic Study. Done (per Matt Delich) e) Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). Noted. f) This project is responsible for dedicating any right-of-way and easements that are necessary for this project. Dedications may include drainage, access or emergency access easements which can be dedicated by separate document or by plat, if replatting. There is a separate TDRF of $250 per dedication in addition to a Larimer County filing fee for each dedication. Noted. g) Utility plans will be needed for this project. Noted. h) A Development Agreement (DA) will be done with this project. Noted. i) A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. A separate street cut permit will be required if cutting into the street and all street repair must be repaired to standard. Noted. j) Driveways must align or a variance request must be submitted for Traffic Engineering's review. Please see LCUASS, Chapter One for variance submittal requirements. Driveways have been aligned k) Driveways must be built to standard with radii meeting requirements in table 8-2 of LCUASS. Existing driveways will be utilized. 1) Please see Transportation Planning and PFA for their requirements. Noted. Please contact Susan, at 221-6605, if you have questions about these comments. 3. Roger Buffington of the Water/Wastewater Department offered the following comments: 2 Centre Avenue Residences response to conceptual review comments: See responses in red COMMENTS: Gary Lopez of the Zoning Department offered the following comments: a) The property is in the E, Employment zone. This would be a Type 2 review, with residential uses only permitted as a "secondary" principal use whereby only 25% of a development plan can be residential and the other 75% must be primary principal uses. The project fits withion the 25% secondary uses allowed within the CAT development b) 3 stories is the maximum height allowed for residential uses in the E zone. However a modification of standard was previously approved to allow 4 stories in this development. Noted Please contact Gary, at 416-2338, if you have questions about these comments. 2. Susan Joy of the Engineering Department offered the following comments: a) Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 221-6108 if you have any questions regarding these fees. Noted b) Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees please see the development review bullet under www.fceov.com/en ing eefing/ Noted c) Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. Noted Policy ENV-3.3: Water Demand Management The landscape plan for the project will utilize the following xeriscape principles: Plant material with low to moderate water requirements Limited turf areas Effective use of soil amendments An efficient irrigation system Appropriate maintenance PRINCIPLE ED-1: Employment districts will be major employment centers in the community. These districts will also include a variety of complimentary uses to meet the needs of employees, such as business services, convenience retail, lodging, child care, recreation, housing and restaurants. By design, they will encourage non -auto travel, car and van pooling, telecommuting and transit use. Their attractive appearance should allow them to locate ,adjacent to residential neighborhoods and along primary entryways into the community. Policy ED-1.3 Secondary and supporting uses (f.) Multi family Housing Centre Avenue Residences provides a high density multi family use within the heart of this primary employment district. Allowing residences the ability to walk or bike to work and services. Policy ED-1.5 Walkable Destinations As stated above, the location of the project provides easy access to employment and commercial services. Centre Avenue residences embodies the City's vision for development by locating near many employment opportunities and commercial services. Thank you for your time and consideration. I look forward to working with you during the development review process. Sincerel , 7 Russell Lee VFR Design, Inc. 3 than 2 tenths of a mile from the Market Centre retail area. The project has easily accessible sidewalks internally and along the streets making pedestrian travel a viable alternative to the automobile. PRINCIPLE T-1: The physical organization of the city will be supported by a framework of transportation alternatives that maximizes access and mobility throughout the city, while reducing dependence upon the private automobile. Policy T-1.1 Land Use Patterns The nearest transit stop is at the corner of Research and Centre Avenue. The close proximity to a transit stop permits public transit to become a viable alternative to the automobile. PRINCIPLE T-4: Bicycling will serve as a viable alternative to automobile use for all trip purposes. Policy T-4.1 Bicycle Facilities There are bike lanes in Centre Avenue making biking a viable alternative to the automobile. PRINCIPLE T-5: The City will acknowledge pedestrian travel as a viable transportation mode and elevate it in importance to be in balance with all other modes. Direct pedestrian connections will be provided and encouraged from place of residence to transit, schools, activity centers, work and public facilities. Policy T-5.1 Land Use Policy T-5.2 Connections Centre Ave Residences is adjacent to primary employment and they are less than 2. tenths of a mile from the Market Centre retail area. The project has easily accessible sidewalks internally and along the streets making pedestrian travel a viable alternative to the automobile. PRINCIPLE HSG-1: A variety of housing types and densities will be available throughout the urban area for all income levels. Policy HSG-1.1 Land Use Pattern. Although not intended to be deed restricted, Centre Avenue Residences provides a place designed around the needs of mature individuals. The project is located in an active centrally located area of the City adjacent to many services. PRINCIPLE ENV-2: The City will reduce total motor vehicle emissions of high priority pollutants by focusing on both technology and behavior. Policy ENV-2.1: Actions on Vehicle Miles Traveled. The project is located within walking distance to recreation, shopping and transit stops. PRINCIPLE ENV-3: Drinking water provided by the City's Water Utility will meet or exceed customer expectations for quality, quantity and reliability. Water Conservation will be strongly encouraged. 2 >,• architecture ■ land planning ■ landscape architecture ■ interior design April 15, 2009 Mr. Steve Olt City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80522 RE: Planning Objectives for Centre Avenue Residences PDP Proiect Description Centre Avenue Residences is located in the Center for Advanced Technology (CAT) master planned development. The 2.4-acre site is located on the northeast corner of Centre Avenue and Worthington Drive. The proposed multi -family development has three (3) four-story buildings consisting of 10 dwelling units per building, 30 dwelling units total and a density of 12.5 d.u. per acre. The target market is for mature adults desiring to live in an upscale condominium project designed specifically with these residents in mind, located in a convenient location close to a variety of services. The site is located adjacent to Mercer Ditch. The project provides an ample wildlife corridor along the ditch utilizing native shrub species and native grasses. Parking is provided in underground garages and surface parking. The site is accessed from existing curb cuts along Centre Avenue and Worthington Circle. City Plan Principles and Policies achieved by The Retreat 60200 Plum rp olect PRINCIPLE LU-1: Growth within the city will promote a compact development pattern within a well-defined boundary. Policy LU-1.1 Compact Urban Form Centre Ave Residences is located in the heart of the Centre for Advanced Technology. The residences will have immediate access to primary employment and they are less VAUGHT FRYE RIPLEY DESIGN INC. 401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.1191 ■ fax 970.224.1662 ■ www.vfrdesigninc.com NORTHERN ADDRESS: PHONE:970.221.4158 WEBSITE: 200 S. College Ave. Suite 100 www.northernen ineerin com E N G I N E E R I N G Fort Collins, CO80524 FAX: 970.221.4159 g g' LEGAL DESCRIPTION: A tract of land located in the Section 23, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado being more particularly described as follows: Tract A and Tract C, Centre for Advanced Technology P.U.D., Seventh Filing (described at Reception No. 19880049607 recorded at the Larimer County Office of the Clerk and Recorder), County of Larimer, State of Colorado. The above described tract of land contains 105,607 square feet or 2.424 acres more or less and is subject to all easements and rights -of -way now on record or existing. Centre Avenue Residences Owner Everitt Companies Contact: Stan Everitt 3003 E. Harmony Road Suite 400 Fort Collins, CO 80528 P:970-226-1500 F:970-224-1662 VIA 4gW Transportation Impact Analysis (TIA) (7 copies). 144 Utility plans (existing and proposed utility systems) (14 copies 24" x 36" — unfolded). Requirements for utility plans checklist (1 copy). No Drainage and erosion control report (4 copies). v% Soils Report (3 copies). I t&V Lighting Plans (4 copies 24" x 36" — folded). V Hazardous Materials Impact Analysis (4 copies). y� s (if not included in the utility plans) (8 copies 24" x 36" — folded). €planation of anv variance rPn11PC}(, pt Signed letters of intent indicated that all required off -site easement and off -site rights -of - way can be negotiated in time for final development plan submittal. Other information that the Director may require: Natural area or environmental study (4 copies) — Wetland Delineation (4 copies) Revised September 4, 2007 PDP Checklist PDP Checklist 'Citv.Of.FdtfCOiii-o Submittal Checklist: Project Plan o Planning and Zoning � Development la (PDP) The following information is required to be submitted with all applications, unless waived by staff. Any item waived must be dated and initialed by a planner with the City of Fort Collins Planning and Zoning Department. ,v�rt'� Application form, filing fee (plus .75 cents for each APO label), and sign posting fee. `' �;� " X Transportation Development Review Fee — please contact Engineering at �/ 221-6605 for information. / Vfit Three lists (3) of names and addresses of all owners of record of real property within at V least 800' of the property lines for the parcel of land for which the project is proposed, exclusive of public right-of-way. (Two (2) lists typed on mailing labels (33 names per sheet) and the other list on a reproducible copy of those labels). (1 dent Jau Statement of planning objectives (27 copies). Qb Copy of applicable conceptual letter and response letter explaining how issues have been addressed (27 copies) A Complete list of proposed street names for the development. 13 Np4er Legal description of the site (one copy on 8'/z x 11" sheet). r,mr•A Name and address of each owner of property within the boundaries of the development plan area.� Vis(V List of names of all general and limited partners and/or officers involve as either vV applicants or owners. Development phasing schedule. C er ni> OWIIJ43) r Site plan drawings. (Refer to the submittal requirements for specific information to be ' presented on the site plan.) (31 copies 24" x 36" — folded). Subdivision Plat (23 copies 24" x 36" — folded). Architectural elevations (8 copies 24" x 36" — folded). FPO Landscape Plan (Refer to the submittal requirements for specific information to be presented on the landscape plan.) (21 copies 24" x 36" — folded). ��� Revised September 4, 2007 PDP Checklist Accela Automation: ShowPayDetail4r' T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS NEIGHBORHOOD & BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. BOX 580 Fax:970-224-6134 Application #: B0902064 Project Name (Subdivision): CENTRE AVENUE RESIDENCES Application Type: Building / Misc / General / NA Receipt No.: 140617 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 041301 $12,004.50 04/15/2009 10:39:58 AM SLINDELL DEVELOPMENT SUBMITTAL FOR CENTRE A\ Owner Info.: Work DEVELOPMENT PLANNING FEES $5,879, $50 SIGN POSTING, $25.50 APO Description: LABELS TRANSPORTATION DEVELOPMENT FEES $6,050 PAID BY EVERITT ENTERPIRSES, INC CK#041301 T8108-D Version 4.0 https:Hdtsweb02.fcgov.comloperations/permit/index. cfm?FUSEACTION=ShowPayDetail4O&RECEIPT_.!. 4/ 15/2009 Transportation Development Review Fee Date Received/ Paid Total Amount Paid CityofFort"Collins Project Name: ��-,<,e��/�j/�.�p /L,OSi�p�,{/� _r Project Location: Date: Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due ❑ Overall Development Plan (ODP) $500 each ❑ Final Development. Plan (FDP,) This fee includes 2 rounds of review $1000 each ❑ Additional round of review $ 500 each ❑ Annexation $20 x acres = + $250 = ❑ Minor Amendment $250 each ❑ Major Amendment $2,500 each ❑ Re -zone $200 each ❑ Modification to Land Use Code $200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects acres (of roadway) X $250 = ❑ Vacation of Easement(s) '** # of vacations X S400= ❑ Vacation of Right(s)-of-Way •" # of vacations — X $800 = ❑ Dedication of Easement(s) and/or Right(s}of-Way'*• # of dedications X $250 = •'+ This fee does not include the cost of filing fees. Filing fees shall be determined at time of final document submittal and will be required prior to filing. Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit " # of units X S160 = Multifamily or other residential units $115 per unit o#ofunits X$115= 3,450 Commercial, Industrial, Retail, and/or Non residential " building square footage $0.25 per square foot sgfit X$0.25= Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre acres X $ 250 =� Project fee $2,000"each $2.000 Total of above amounts . p SO If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula:...: $30,000 + '/, (the amount over 30,000 ) _ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verifythe fee amount (does not apply to mixed-use'developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing - a copy of the City letter certifying/ authorizing the affordable'housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP $ Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: --C) Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): Non residential building square footage: sq ft Gross Acreage: acres General Information: Owners Name(s): pneAi CS Goo 45�4qel 6vw: N Street address:: 3t jp 3 E Vr r_ p3tn l 14cr-,A -4-op City/State/Zip: 42 CC MNS 'ro E306Z8 Telephone: Fax: 225-4[sS Applicants/ Consultants Firm Name: VF1. 'A:� Contact: V 11 Street address: mm%A44 .y Aj44 5L;4-e- ZcJb City/State/Zip: -F Coll; u$ LO 'I Telephone: 2,7,l.1 -1/y l Fax: 27 Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): Signature: Telephone: ZZLI_ Itgl cc: Christie White, Engineering Development Review Engineering Type of Request Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Additional handouts are available explaining the submittal requirements for each of the following review processes. ❑ Annexation Petition with Initial Zoning REQUESTED ZONE: _ Fee $1,188.00 + $50.00 sign posting fee + $. 75 for each APO label ❑ Rezoning Petition REQUESTED ZONE: Fee $977.00 + $50.00 sign posting fee + S.75 for each APO label ❑ Overall Development Plan (ODP) Fee: $1, 599.00 + $50.00 sign posting fee + $, 75 for each APO label ❑ Project Development Plan (PDP) without Subdivision Plat 'Fee: $3, 887.00 + $50.00 sign posting fee + $.75 for each APO label U /Project Development Plan (PDP) with Subdivision Plat Fee: $5, 879.00 + $50.00 sign posting fee + $, 75 for each APO label ❑ Final Plan without Subdivision Plat Fee: $1,000.00 ❑ Final Plan with Subdivision Plat Fee: $1,000.00 ❑ Modification of Standards(fext and Map Amendment Fee: $200.00+ $50.00 sign posting fee ❑ Basic Development Review Fee: Varies: Check with the Zoning Department ❑ Major Amendment Fee: $3, 206.00 + $50.00 sign posting fee + $. 75 for each APO label ❑ Non -Conforming Use Review Fee: $1,389.00 ❑ Vacation of ROW or Easement Fee: $5.00 per sheet of filing document ❑ Small Project Fees Fee: Varies -Check with the Current Planning Department ❑ Street Name Change Fee: $5.00 ❑ Extension of Final Approval Fee: $566.00 ❑ Site Plan Advisory Review NO FEE City of eoyy �qA o& � 6 Fort Collins Development Review Application Current Planning For Office Use Only Date Submitted Current Planning File # Planner5yl � 0 Project Name: 9e. Project Location (Street Address): �CoE r�.,.cm Wew4iliW ov% Land Use Information: Gross Acreage/Square Footage: Existing Zoning: Proposed Use: 4d,..14i-1".....:t-� Total Number of Dwelling Units: DO Total Number of Affordable Dwelling Units: Percentage of Affordable Dwelling Units (out of total): Total Commercial Floor Area: Additional Information ('rf Applicable): 1� Project Description._p c.n,T M[.l{;.�.,�•I� Pra i eu+ — (Choose the type of project from the list on the back) General Information: List all property owners having a IegaUequdable interest in the property (attach separate sheets if necessary). Owner's Name(s): „ i:e. C St ,�. �i Street Address: c'',003 /5- it/aicwmx 9W S4"ietM CitylStatelZ[p: �o 4- fa0:y.0 to So52t3 Telephone: -J L - [Soo Fax: 27,3-4rSR Applicant'slConsukant's Name: \4V_JL VhgM6s I Ili — Name of firm: Contact:i.. sxf/ LPL Street Address: O/o l was ► ,Neow l.:a Sk4c Zoo CitylState0p: 4tr-f 4d s 8+?62V Telephone: 7411-//9 f Fax: ? 2H -%&07 E-mail: rr..sssrl -lee-.�e�.r�4.,n inc. ro.n --- CERTIFICATION I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with the knowledge, consent, and authority of the owners of the real property, as those terms are defined in Section 1-2 of the City Code (including common areas legally connected to or associated vdth the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if necessary, for posting of public notice on the property. Name (Please PRINT): a II Lee' I 14� 12� Address: AYC71 L AJYC,.,. 4wW A<x . '5 Telephone: 2�7_12 - /1 `l 1 Sig and title showing authority to sign, if applicable) *CERTIFICATIONMUSTBESIGNED. h