Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PENNY FLATS (BLOCK 33) - FDP - 32-05/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET
d` n % 05A FINAL PLAN ROUTING SHALT Item: --1 City of Fart Collins This project went Public Hearing on �/1y ck (, 2Zw(p CL"RREh'T PLANNING The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver/Reduc ion Approval: Amount: Date: Planner: ABM ffi4oen Engineer: Items Requested • Project �■■n■■onn oil.en■n■■■■�■■■■■■■■ onnnn ■■■■■■■ Power • . " • . ®■■■■■■ate■■■■■■■■■■■ . o■■■■i■©n■■■■■■■■■■■ Transportation Planning ■■■o■n��■■■�■■■■■ Water & ConservationWater ■■o■■.■..■■■.■■■ .... • _ Thompson o■■■■■�■�■■■■■■■