Loading...
HomeMy WebLinkAboutDECHAIRO SUBDIVISION - PDP - 35-06 - CORRESPONDENCE - (4)If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours ,T�ruuly, 4m)e.. W Steve Olt City Planner cc: Susan Joy Current Planning file #35-06 Page 3 Topic: Plat Number: 10 Created: 12/26/2006 [12/26/06] From Technical Services: Plat matches legal description, area is good, plat closes. Number: 11 Created: 12/26/2006 [ 12/26/06] From Technical Services: Please show how existing Plum Street was dedicated. Number: 12 Created: 12/26/2006 [ 12/26/06] From Technical Services: Sight Distance statement not needed if no Sight Distance easement is being dedicated. Number: 13 Created: 12/26/2006 [ 12/26/06] From Technical Services: Check the existing ROW width of Plum Street. We show 50'. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 5 Created: 12/18/2006 [12/18/06] Poudre Fire Authority has no comments or concerns at this time. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 6 Created: 12/ 19/2006 [12/19/06] No comments or concerns from Transportation Planning at this time. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Stormwater Number: 9 Created: 12/22/2006 [12/22/06] At time of building permit a detailed grading and erosion control plan will be required. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 7 Created: 12/19/2006 [12/19/06] No comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number: 1 Created: 12/6/2006 [12/6/06] NO COMMENTS Be sure and return all red -lined plans when you re -submit. Page 2 City of Fort Collins Dechairo Construction c/o Roger Dechairo 601 Gait Circle Fort Collins, CO. 80524 STAFF PROJECT REVIEW Date: 12/26/2006 Staff has reviewed your submittal for DECHAIRO SUBDIVISION (1205 WEST PLUM STREET), PDP - TYPE 1, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Plat Number: 14 Created: 12/26/2006 [ 12/26/06] The City's Approval signature block for the Planning & Zoning Board must be changed to the Director of Planning (please see red -lined plat). The Board will not review and approve this plat, the Director of Planning will. Number: 15 Created: 12/26/2006 [12/26/06] This item is ready to be scheduled for an Administrative Public Hearing. Steve Olt of the Current Planning Department will work with you to schedule a date, time, and location for the public hearing. He can be reached at 221-6341. Department: Current Planning Topic: Plat Number: 8 [12/19/06] No comment. Issue Contact: Pete Wray Created: 12/19/2006 Department: Engineering Issue Contact: Susan Joy Topic: General Number: 2 Created: 12/13/2006 [12/13/061 Please update the plat language to current. If you email meat sjoy@fcgov.com, I'll send you the word document - the website is wrong. Number: 3 Created: 12/13/2006 [12/13/06] Add the words "to be dedicated by this plat" or similar to the right-of-way (ROW) and utility easement (UE) dedication. Number: 4 Created: 12/13/2006 [12/13/06] I've attached the checklist for all plat requirements. Please complete and return with your next submittal. Page 1