Loading...
HomeMy WebLinkAbout1979-053-06/05/1979-ACCEPTING A RECOMMENDATION FROM THE DIRECTOR OF PUBLIC WORKS REGARDING THE INITIATION ON A CONSOLIDA RESOLUTION 79-53 OF THE COUNCIL OF THE CITY OF FORT COLLINS ACCEPTING A RECOMMENDATION FROM THE DIRECTOR OF PUBLIC WORKS REGARDING THE INITIATION OF A CONSOLIDATED STREET IMPROVEMENT DISTRICT STATING THE NEED FOR, THE NATURE OF AND THE LOCATION OF THE IMPROVEMENTS TO BE MADE, DESCRIBING THE AREA TO BE ASSESSED FOR THE SAME, AND DIRECTING THE CITY ENGINEER TO PREPARE AND PRESENT TO THE CITY COUNCIL THE NECESSARY INFORMATION FOR THE FORMATION OF SAID DISTRICT WHEREAS, the Director of Public Works has recommended to the City Council that a consolidated street improvement district be created for the purpose of installing certain public improvements in the city, and WHEREAS, the City Council has received such recommendation and desires to continue with the formation of such consolidated street improvement district. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS Section 1 That the recommendation of the Director of Public Works is hereby received and accepted Section 2 That the nature of the improvements, their location and necessity are as follows West Mulberry Street Improvements: Location West Mulberry Street from Crestmore Place to a point approximately three hundred seventy-five (375) feet west of Tyler Street Improvements Street improvements including pavement, curb and gutter, sidewalk, street light- ing, traffic signal, and drainage facili- ties Necessity These improvements are necessary because the existing road surface on West Mul- berry Street has deteriorated seriously and has totally disintegrated in portions requiring that the roadway be completely reconstructed Additionally, the lack of curb and gutter, sidewalk, and street lighting on said street is a serious safety hazard for pedestrians and bikers. Drainage facilities are necessary to prevent similar type deterioration in the future The traffic signal is necessary to control traffic at the intersection of West Mulberry and Taft Hill Road. Drake Road Improvements Location West Drake Road from Yorktown Drive to a point approximately five hundred seventy- seven (577) feet east of Yorktown Drive Improvements: Street improvements, including pavement, curb and gutter, sidewalk, and street lighting Necessity - These improvements are needed to bring this portion of Drake Road completely up to arterial street standards and to eliminate a safety hazards for pedes- trians, bikers, and motorists Section 3 That the property to be assessed for the improvements shall be as follows West Mulberry Street Improvements The south side of West Mulberry Street between Crestmore Place and Tyler Street and the north side of West Mulberry Street between Taft Hill Road and the City boundary west of Tyler Street. Drake Road Improvements The north side of Drake Road from Yorktown Drive to a point approximately five hundred seventy-seven (577) east of Yorktown Drive A portion of the total cost of such improvements shall be paid by the City at large and not by assessments against the property in the district Section 4 That the City Engineer is hereby directed to prepare and present to the Council the following A Preliminary plans and specifications of the im- provements proposed, B An estimate of the total cost of such improvements, including the cost of constructing the same, engineering, legal, and advertising costs, interest during construction, and until assessments are made -2- by ordinance against the properties benefited, and other incidental costs, and C. A map of the district to be assessed for the cost of the improvements. Section 5. That said consolidated street improvement district shall be known as Consolidated Street Improvement District No 74 Passed and adopted on a regular meeting of the City Council held this 5th day of June, A D 1979 T• ' ayor Ci y Clerk -3-