WHEREAS, in 2011, the City Engineer completed an arterial intersection priority study
which ranked Vine Drive and Shields Street as an intersection in need of safety and operational
improvements; and
WHEREAS, the intersection demonstrated poor horizontal geometry, deficient or
nonexistent bicycle and pedestrian facilities and higher than average vehicle accident rates as
well as significant congestion; and
WHEREAS, an "alternatives analysis" report was prepared by Muller Engineering which
concluded that a single-lane roundabout intersection at that location will outperform a signalized
intersection with respect to safety, right-of-way impacts to local businesses, and costs of
operation; and
WHEREAS, the single-lane roundabout intersection would also have a positive impact on
short and long term air quality, would improve storm drainage facilities, would enhance
landscape elements and would provide accessible crosswalks for bicycle and pedestrian users;
and
WHEREAS, pursuant to Resolution 2012-067 City Council has determined that a single-
lane, modern roundabout is the preferred alternative for the Vine Drive and Shields Street
intersection improvement; and
WHEREAS, the total amount of$1,701,101 has been appropriated for the design, right-
of-way acquisition, and construction of the Vine Drive and Shields Street Intersection
Improvements Project (the "Project"); and
WHEREAS, the City and the County have jointly established the Regional
Transportation Capital Improvement Expansion Fee (the "Regional Road Impact Fee"), which
for the City is set out in Chapter 7.5, Article VI, of the City Code and has as its intent and
purpose to establish a fee program to assure that new development contributes a proportionate
share of the costs of providing new capital improvements for the Regional Road CIP system; and
WHEREAS, due to escalating construction costs, additional funds in the amount of
$150,000 from the Regional Road Impact Fee have been identified by City and County staff to
be used for the Project; and
WHEREAS, Larimer County has agreed to make available from the Regional Road
Impact Fee Program additional funding in the amount of $150,000 to cover the additional
- 1 -
escalating construction costs of the Project, and has presented to the City an intergovernmental
agreement in support of such additional funding; and
WHEREAS, the City Council has determined that it is in the best interests of the City that
the Mayor be authorized to execute the intergovernmental agreement between the City and
Latimer County for the provision from the Regional Road Impact Fee Program of the sum of
$150,000 to cover additional funds that are needed due to escalating construction costs of the
Project, which agreement is attached hereto as Exhibit "A" and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
FORT COLLINS that the Mayor is hereby authorized to execute an intergovernmental
agreement between the City and Latimer County for the provision of-the sum of$150,000 from
the Regional Road Impact Fee Program to cover escalating construction.costs for the Project.
Passed and adopted at a regular meeting of the Council of the City of Fort Collins this
2nd day of June, A.D. 2015.
ATTEST: G.tv,oF F.o r
s� o
y
City Clerk ORADO•••••
- 2 -
EXHIBIT A
INTERGOVERNMENTAL AGREEMENT
FOR VINE DRIVE AND SHIELDS STREET.INTERSECTION
THIS INTERGOVERNMENTAL AGREEMENT is entered into this day of
, 2015, by and between Larimer County, Colorado ('County") and the
City of Fort Collins, Colorado ('City").
FACTUAL BACKGROUND AND PURPOSE
A. The City and County previously executed an Intergovernmental Agreement for the
engineering design and construction activities related to the Vine Drive and Shields Street
(LCR 17) Intersection Improvements Project, Resolution 2012=066.
B. This Intergovernmental Agreement describes the responsibilities, approval
authorities and process under which Larimer County is providing partial funding for
engineering and construction activities related to the Vine Drive and Shields Street (LCR
17) Intersection Improvements Project. Shields Street (LCR 17) is identified as a
Regional Road in the County's Functional Road Classification and a portion of the
regional road fees that have been collected by the City will be allocated towards
construction of roadway and intersection improvements. Since the majority of the
improvement area is within the limits of the City, it is reasonable for the City to take the
lead on management of the construction of the roadway and intersection improvements;
similar to the prior agreement approved under Resolution 2012-066.
C. The City will involve the Larimer County Engineering Department in the bidding
process and construction coordination for the project.
D. The previous appropriations executed in 2012 are included as Exhibit A, attached
hereto and incorporated herein by this reference, and totals $1,701,101. The County and
City have a mutually agreed upon contribution of an additional $150,000 to the project
from the Regional Road Fee to be used for construction; as shown in Exhibit B, attached
hereto and incorporated herein by this reference.
AGREEMENT
NOW THEREFORE, in consideration of the mutual promises of the parties and
other good and valuable consideration, the receipt and adequacy of which is hereby
acknowledged, the parties agree as follows:
1. Upon City Council approval of this Agreement, the County shall transfer the
amount of $150,000 to the City. This transfer shall be made such that the funds are
available prior to the first construction payment to the contractor. The City shall have the
authority to administer and expend these funds on construction and other expenses
directly related to this project.
2. The City shall maintain accurate accounts of all project expenditures that are paid
from the Regional Road Fee funds provided by the County. The City will provide the
County with information detailing incremental and total project expenditures and
remaining balance of funds at least quarterly. The County contact for this reporting will
be Rusty McDaniel, Assistant Comity Engineer.
3 The City shall notify and obtain County consent prior to authorizing any changes
in scope-of-services or efforts that would cause costs to exceed the budgeted amount in
Exhibit B.
4. Following completion and acceptance of the construction, the City shall return to
the County the balance of any unused funds that were provided by the County for this
project.
5. Both the City and County intend that this Agreement be binding upon them.
Either party hereto shall be permitted to specifically enforce any provision of this
Agreement in a court of competent jurisdiction and this Agreement shall constitute the
entire understanding of the parties hereto with regard to the subject matter hereof.
IN WITNESS WHEREOF, the parties have executed this Agreement the day and
year first above written.
CITY OF FORT COLLINS, COLORADO
By:
Wade Troxell, Mayor
ATTEST:
City Clerk
APPROVED AS TO FORM:
Deputy City Attorney
COUNTY OF LARIMER, COLORADO
By:
Lew Gaiter III - Chair
ATTEST:
APPROVED AS TO FORM:
Assistant County Attorney
EXHIBIT A
Vine Drive and Shields Street Intersection Improvements
2012 Appropriations Summary
Funding Source Amount
Federal Grant _ _ $1,054,000.00
Local Agency Match (Regional Road Fee) $219,101.00
Local Agency Overmatch (Regional Road Fee) $105,899.00
Local Agency Overmatch (Building on Basics) $322,101.00
2012 TOTAL FUNDS: $1,701,101.00
EXHIBIT B
Vine Drive and Shields Street Intersection Improvements
2015 Revised Budget
Funding Source Amount
Federal Grant __ $1,054,000.00
oc Lalge Ancy Match (Regional Road Fee) __ 1219,101.01
Local Agency Overmatch (Regional Road Fee)_ - $105,899.00
Local Agency Overmatch (Building on Basics) $322,101.00
Local Agency Overmatch (Regional Road Fee) $150,000.00
Local Agency Overmatch (Building on Basics) — _ $150,000.00
TOTAL AVAILABLE FUNDS: I $2,001,101.00