HomeMy WebLinkAbout2014-054-07/01/2014-AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT WITH THE PLATTE RIVER POWER AUTHORITY FOR THE DESIG RESOLUTION 2014-054
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT WITH THE
PLATTE RIVER POWER AUTHORITY FOR THE DESIGN AND CONSTRUCTION
OF A PERIMETER WALL AT THE HARMONY SUBSTATION
WHEREAS, the. City's electric utility substation located at Harmony Road and
Innovation Drive ("Harmony Substation") is surrounded by a chain link perimeter fence which is
in need of replacement; and
WHEREAS, the Platte River Power Authority (PRPA") is willing to design and
construct an engineered masonry wall around the Harmony Substation to replace the current
fence; and
WHEREAS, the design of the wall will match the walls that PRPA has recently
constructed around the Dixon and Timberline substations; and
WHEREAS, pursuant to the terms of an intergovernmental agreement for construction of
the Harmony Substation wall, the City has agreed to reimburse PRPA for the reasonable costs
associated with designing and constructing the perimeter wall, based on a budget developed by
the parties in advance;'and
WHEREAS, based on the costs PRPA incurred for the two prior substation walls, the
estimated cost to build the Harmony Substation wall is $750,000 to $900,000; and
WHEREAS, the City Council has determined that the intergovernmental agreement with
PRPA should be executed in order for the City to timely replace the fence around the Harmony
Substation with a secure masonry wall, which improvement is in the best interests of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
FORT COLLINS that the Mayor is hereby authorized to enter into an agreement with PRPA,
attached hereto as Exhibit "A", for the design and construction of a masonry wall around the
Harmony electric utility substation, under which the City will reimburse PRPA up to $900,000
for the design and construction of the subject wall, based on a project budget developed in
advance by the parties.
1
Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 1st
day of July, A.D. 2014.
_ Ma or
ATTEST: ORTC
04,F...
City Clerk
COL O RPOO
- 2 -
EXHIBIT A
INTERGOVERNMENTAL AGREEMENT FOR THE DESIGN AND CONSTRUCTION OF
A PERIMETER WALL FOR THE HARMONY SUBSTATION
This Intergovernmental Agreement for the Design and Construction of a Perimeter Wall for the
Harmony Substation is entered on this _ day of . 2014, between Platte River
Power Authority, a political subdivision of the State of Colorado (Platte River), and the City of
Fort Collins,a Colorado home rule municipality (Fort Collins). Platte River and Fort Collins are
jointly referred to herein as"Parties".
RECITALS
WHEREAS, Platte River has undertaken and largely completed the construction of
perimeter walls surrounding the high-voltage transmission substations it operates, including
the Timberline and Dixon Creek substations in Fort Collins;and ,
WHEREAS, these perimeter walls not only provide security for the substation
equipment, but also improve the aesthetics of the substation for the benefit of the community;
and
WHEREAS, Fort Collins wishes to install a perimeter wall surrounding the Harmony
Substation; and
WHEREAS, Fort Collins recognizes that the recent experience of Platte River with the
design and construction of perimeter walls for transmission substations will provide efficiencies
if employed during the design and construction of a perimeter wall for the Harmony
Substation;and
WHEREAS, the Parties recognize the importance of aesthetics and community
acceptance in order to ensure that a project of this nature is successful in a location of high
visibility;and
WHEREAS, the Parties recognize that a division of labor through which Platte River will
be primarily responsible for the design and construction of the perimeter wall and Fort Collins
will be primarily responsible for the necessary permitting and public outreach is appropriate;
and
WHEREAS, Platte River is willing to design and construct a perimeter wall for the
Harmony Substation, provided it is fully reimbursed for the reasonable costs associated with
this effort;and
Intergovernmental Agreement for the Design and Construction of a Perimeter Wall for the Platte River Power
Authority Harmony Substation
Page 1 of 3
WHEREAS, subject to the specific terms of this Agreement, Fort Collins is willing to
reimburse Platte River the reasonable costs of design and construction of a perimeter wall for
the Harmony Substation;and
WHEREAS, the Parties have the authority under C.R.S. § 29-1-203 to enter into
intergovernmental agreements provided such agreements are approved by the legislative body
of each of the Parties.
AGREEMENT
1) Platte River agrees to undertake the design and construction of a perimeter wall
surrounding the Harmony Substation (the "Work'). A Project Charter for the
Work will be developed by Platte River for review and acceptance by both
Parties, which will contain a budget for the Work. The perimeter wall will be
designed to be similar in appearance to the perimeter walls Platte River recently
constructed at the Timberline and Dixon Creek transmission substations and will
employ similar materials. Platte River will coordinate with Fort Collins during
the design of the perimeter wall. Construction shall not begin until Fort Collins
has reviewed and approved final design plans. Platte River will be responsible
for the procurement of necessary materials and all contracting associated with
the design and construction of the perimeter wall.
2) Platte River will create an account within,which all costs associated with the
Work will be tracked. These costs will include,but are not limited to, the costs of
Platte River labor, costs of materials, and costs of any companies retained by
Platte River to design and construct the perimeter wall.
3) Fort Collins agrees to reimburse Platte River for all reasonable costs incurred in
the performance of the Work. Any costs not contained in the budget developed
and accepted by the Parties through the Project Charter process will be approved
in advance by Fort Collins.
4) Fort Collins shall be relieved of any obligation to reimburse Platte River for any
cost not directly arising from the Work or for costs not contained in the Project
Charter budget and for which prior written notice was not provided to Fort .
Collins and written approval of the same provided to Platte River.
5) Platte River will invoice Fort Collins for the costs of the Work on a quarterly
Intergovernmental Agreement for the Design and Construction of a Perimeter Wall for the Platte River Power
Authority Harmony Substation
Page 2 of 3
basis,invoices payable within thirty (30) days of receipt. Invoices will itemize all
costs for which reimbursement is sought.
6) Fort Collins will be responsible for obtaining any and all local government land
use approvals and permits necessary for construction of the perimeter wall. Fort
Collins will be responsible for all public outreach activities associated with the
Work, and upon written request Platte River will provide personnel to assist in
these efforts.
7) The Parties will create a coordinating committee of relevant personnel who will
meet periodically to address planning and implementation issues associated with
the Work and any approval and outreach activities.
8) Financial obligations of Fort Collins payable in future fiscal years shall be subject
to the annual appropriation of funds sufficient and intended for the Work. Fort
Collins will notify Platte River in writing as soon as practicable concerning the
appropriation of funds during future fiscal years. Platte River will have no
obligation to perform any activity associated with the Work beyond December
31,2014,unless and until receipt of notice that funds have been appropriated.
9) This is the entire agreement of the Parties on this issue. This Agreement may
only be modified by a writing executed by both Parties.
IN WITNESS WHEREOF, the Parties have caused this Agreement, to be execute
day and year first above written.
PLATTE RIVER POWER AUTHORITY ATTEST: Is
p (l ONO
By: (.� t By: 6l1I elZA��# lA L
General Manager V YSecretary
CITY OF FORT COLLINS,COLORADO ATTEST:
By: By:
Mayor City Clerk
ApprZC#
to
Intergovemmen. I Agr menu the Design and Construction of a Perimeter Wall for the Platte River Power
Authority Harmony Substation
Page 3 of 3