Loading...
HomeMy WebLinkAbout2010-023-05/04/2010-APPROVING THE NORTH COLLEGE INFRASTRUCTURE FUNDING PLAN RESOLUTION 2010-023 OF THE COUNCIL OF THE CITY OF FORT COLLINS APPROVING THE NORTH COLLEGE INFRASTRUCTURE FUNDING PLAN WHEREAS, in July 2008, the Fort Collins Urban Renewal Authority Board of Commissioners (the "URA Board") and the North College Citizen Advisory Group met to discuss the possible establishment of a North College Infrastructure Funding Plan (the "Plan"); and WHEREAS, the URA Board directed staff to prepare the Plan, a draft of which was presented to the URA Board in July, 2009; and WHEREAS,the general purpose of the Plan is to place all of the North College Avenue area key infrastructure needs into an overall framework to guide the work and decisions to be made by the URA Board, the City and others who have an interest in the North College Avenue area infrastructure; and WHEREAS, after substantial public outreach through the meetings of the North College Citizen Advisory Group, staff has prepared and presented the Plan to the City Council; and WHEREAS, the Plan has been recommended for approval by the Planning and Zoning Board, the North College Citizen Advisory Group, the Transportation Board, and the North Fort Collins Business Association; and WHEREAS, the City Council has determined that the approval of the Plan is in the best interests of the City. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS that the North College Infrastructure Funding Plan,dated April 13,2010,attached hereto and incorporated herein by this reference as Exhibit"A", is hereby approved. Passed and adopted at a regular meeiing of the Council of the City of Fort Collins this 4th day of May, A.D. 2010. Mayo ' ATTEST:_ - ' o City Clerk' w y a f - Ap Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 Purpose and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 List of Infrastructure Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 4-7 Potential Funding Sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 840 Project Location Maps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 11 - 14 Funding Scenarios for Very High Priority Projects . . . . . . . . . . . . . . . . Pages 15 -20 Plan Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 21 Appendix A — Map of All Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page A- 1 Appendix B — Project Descriptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages B- 1 -B-24 North College Infrastructure Funding Plan Introduction The North College Infrastructure Funding Plan (Funding Plan) provides a framework to guide efforts by the Urban Renewal Authority (URA), the City, and other stakeholders to assemble funding for public infrastructure projects needed in the North College Avenue corridor area. The Funding Plan essentially consists of a list of projects, with priorities and potential funding sources identified and explained. It does not contain any new goals or policy decisions ; rather, it is an aid to help implement adopted plans . It is part of an ongoing continuum of City efforts to stimulate and support revitalization in collaboration with citizens in the area. seek The term "infrastructure projects" generally refers to construction projects that would build up a more complete system of streets and utilities, including a drainage system to handle runoff from streets and development. These are basic public facilities needed to support long-term revitalization of the area as envisioned in the adopted North College Corridor Plan . The need and initiative for this Funding Plan specifically arose out of administration of the 2004 North College Avenue Urban Renewal Plan, which enables tax increment financing (TIF) to help fund various public improvements . This TIF is administered by the URA, which is governed by City Council members acting as the Board of Commissioners . The URA participates in private development projects to cover financing gaps to make the projects feasible ; and it also expects to initiate or participate in public capital projects to build infrastructure . A North College Citizen Advisory Group (CAG) advises the URA on North College matters, primarily those involving TIF . In July 2008 , the URA held a first annual joint work session with the CAG, and at that meeting, the Board, CAG, and staff all agreed on the need for a prioritized funding plan for infrastructure projects, to help plan for the use of TIF revenues. The Board directed staff to prepare the needed plan. In response, staff initiated a process to develop this Funding Plan. The process centered around a series of five regularly-scheduled monthly CAG meetings that began in March 2009 . Various City departments participated, along with interested members of the public and the Colorado Department of Transportation. 1 Background Previously Adopted Plans The Funding Plan is a tool to help implement the vision, goals, policies, and objectives of previously adopted plans that address infrastructure needs, including : The 2007 North College Corridor Plan. The 2004 North College Avenue Urban Renewal Plan. The 2000 US287/SH14 Access Management Report. North College Corridor Plan Awareness and understanding of North College area infrastructure issues have grown steadily since the late 1980 ' s. In particular, the original 1994 North College Corridor Plan first articulated infrastructure issues, and led to a number of infrastructure projects . The plan ' s highest priority and largest recommended project was a $ 10 million Dry Creek flood facilities project that removed the Dry Creek floodplain from the area in 2003 . That project set the stage for many subsequent initiatives on infrastructure and revitalization. The North College Corridor Plan was updated in 2007 to reflect new information and changed conditions. Infill Infrastructure Staff Team Assessment In 2004, City staff completed a city-wide assessment of infrastructure needs in areas targeted for infill development and redevelopment activity. The Infill Infrastructure Team Report included a fairly detailed listing of projects needed in the North College area, with general priorities and notes about potential funding sources. That information provided the foundation for the more detailed listing and analysis of projects in this funding plan. North College Avenue Urban Renewal Plan In December 2004, the North College Avenue Urban Renewal Plan was adopted, which further articulated deficiencies and needs in the area, and changed the funding picture by enabling TIF . By 2008 , the URA was beginning to see several significant development projects seeking TIF assistance within the North College area. Engineering Design Work Development activity has been compounded by engineering design work on drainage and sewer facilities , and also on the proposed new arterial street known as "Realigned Vine". This work has also contributed to the information in this Funding Plan. In 2009 , a voter-approved capital project to design and construct North College Avenue roadway improvements was underway, concurrent with this funding plan process. The project is known as the "BOB" project (after the 2005 referendum called the "Building on Basics" capital improvements package) . The BOB project has highlighted issues and yielded more detailed understanding of infrastructure issues related to North College Avenue/US Highway 287 . Tax Increment Policy Questions All of the activity noted above has spotlighted policy questions about allocating TIF revenues to development projects, and reserving TIF revenues for public capital projects. If the TIF revenue stream accrues as projected, the URA could become proactive in initiating capital projects to build infrastructure . 2 Purpose and Use The main purpose of this Funding Plan is to place all of the area' s key infrastructure needs into an overall framework to guide work efforts and decisions by the URA, the City of Fort Collins, and others with an interest in North College area infrastructure . One key aspect of this Funding Plan' s purpose is to help the URA prioritize and plan for ongoing use of TIF revenues. Also, this Funding Plan is intended to be used for coordination and input into other important capital project programs such as : • The City ' s Stormwater Capital Projects Program • The City ' s Transportation Master Plan • The City ' s Capital Improvement Budget • Colorado Department of Transportation Project Lists • North Front Range Metropolitan Planning Organization Project Lists Finally, another aspect of the purpose is to allow any additional projects or other new information to be incorporated into the plan with updates as needed. During initial preparation of this Funding Plan, the flow of new information and ideas about projects has been constant, and that is anticipated to continue . This Funding Plan does not represent any specific commitment or obligation to fund any given project. Rather, it provides a working framework and guide for those involved in capital project programs . It can be monitored and updated as needed by staff to remain current and useful. Any City or URA capital projects that move forward to construction would be administered in accordance with the City ' s Capital Projects Procedures Manual. Process The planning process to generate this Funding Plan was formally initiated in March 2009 . Draft material was developed in a series of five regularly-scheduled monthly CAG meetings, through spring and summer, 2009 . Draft material was then reviewed by the URA Board at a joint work session with the CAG in July 2009 . In September, this material was also presented at a public Open House and to the North Fort Collins Business Association. As a result of this process, the list of projects was developed along with other pertinent information on the projects . The CAG then periodically reviewed minor updates through fall 2009 as the Funding Plan document was prepared, and finally forwarded a recommendation to City Council regarding plan adoption in early January 2010 . The Planning and Zoning Board and Transportation Board also reviewed the Funding Plan and forwarded recommendations to City Council regarding approval. The final Funding Plan was considered for approval by City Council on February 2, 2010 . 3 The List of Infrastructure Projects - Project Summary Table The centerpiece of this Funding Plan is the Project Summary Table (Table 1 ), which lists infrastructure projects needed in the area. The table also designates priorities and suggests potential funding sources to pursue, along with other aspects of each project including estimated cost, objectives met, benefits and responsibilities associated with the project, and potential funding sources . Projects Listed in the Summary Table Listed projects are those that have been identified as having a primary, determining role in progress toward the adopted vision and goals for development and redevelopment in the area; and/or having a need for special coordination and partnership among multiple public and private funding sources . Most of the projects were first identified in a 2004 list generated by staff as part of a city-wide assessment of infill and redevelopment issues . That list was reviewed and updated with more detailed attention and discussion during this Funding Plan process. Categories The projects are listed in four categories : • Improvements to Existing Streets • Storm Drainage Facilities • New Streets • Sewer Line It must be noted that projects involving both existing and new streets include a complete set of transportation components such as pedestrian, bicycle, and transit facilities, along with any streetscape enhancements as appropriate . Cost estimates for projects reflect this "complete streets" approach. If any such street components are identified as separate capital projects, it is the intent of this plan to offer the framework to recognize them and aid the pursuit of funding. For example, at this time there are no transit capital projects identified within the area, but capital investments in transit may be needed in the future as part of the Enhanced Travel Corridor designation connecting the Mason Corridor to the future "Realigned Vine Drive" . Priority of Each Project Each project on the list is assigned a relative priority for staff work in pursuing funding. Priorities are assigned from Very High to High, Medium, and Low. Staff and the CAG found no need for numerical scoring or ranking of all projects from top to bottom. The original intent was to identify a few projects to pursue immediately, with a sense of relative priority for all projects . In assigning priorities, staff and the CAG used two main considerations : how projects meet objectives , and the degree to which proactive public funding actions are necessary (as opposed to projects being more a function of private development) . Also, one consideration in assigning Very High priority is the ability to identify a conceptual funding scenario illustrating what it might take to assemble funding for the project. In other words, if no conceptual scenario can be identified for a project, the intent of this plan has been to either break the project down into more feasible parts, or to reduce the priority until such time as a scenario can be identified and pursued. 4 Lower priority generally indicates projects likely to be implemented further in the future, or not quite as central to the implementation of higher priority projects in the North College area. The list will be a working structure for ongoing efforts over a long term. Priorities are not meant to prevent efforts or actions on any projects . Opportunities may arise that could initiate action at any time on any of the projects, regardless of priority shown. Also, priorities will change as projects are completed and other conditions change in the area. Estimated Cost of Each Project Estimated costs reflect planning-level capital costs of getting the projects designed and built. The estimates were done in 2009 and are time-sensitive . The long-term nature of this funding plan highlights the need to adjust for inflation in later years. Unless more up-to-date inflation information is available, a basic assumption of 3 % per year should be used in future years, and not the 2009 dollar figures shown. Operation and maintenance costs are distinct from capital costs and are not reflected in the estimates . Listed projects would affect these costs to varying degrees, and would affect various operation and maintenance programs and budgets . Funding for operation and maintenance costs for City capital projects must be identified at the time projects are approved, in accordance with the City' s Capital Projects Procedures Manual. Any other specific financial impacts of projects will be determined on a case by case basis as projects proceed to approval of funding, programming, and construction. In the course of creating the Funding Plan, discussions included ideas about bonding or other debt financing to allow up-front construction, if an appropriate revenue source is identified to pay the debt. However, such specific mechanisms are beyond the scope of this Funding Plan, and would be determined later in the funding packages for individual projects. Estimated costs do not include financing costs of any debt financing. Objectives Met by Each Project This column on the Summary Table was used to aid discussion of priorities . The objectives reflect past discussions of Transportation capital projects, the vision and goals of the North College Corridor Plan, and discussions among staff and the CAG. The objectives are as follows : IDN Distinct Identity or Sense of Place — Improve Public Perception APF Adequate Public Facilities — Fix Obstacles to Development ECN Support Economic Development LEV Leverage — Opportunities for Cost Sharing or Public/Private Partnership Opportunities SFT Safety — Reducing Hazards for All Transportation Modes LOS Level of Service for All Transportation Modes PED Pedestrian and Bike Activity FIN Financing Feasibility, Political and Ownership Realities FIX Fixes a Problem in Existing Public Infrastructure 5 Benefits and Responsibilities Associated with Each Project This column on the Summary Table was used to aid discussion of potential funding sources . Some of the projects on the list offer general, area-wide benefits, suggesting a broader responsibility for funding; while others would offer more specific benefits for certain properties, suggesting different types of potential funding sources . Potential Funding Sources for Each Project Given the nature and magnitude of needs in the area, partnerships among many different public and private sources are likely to be required. This column on the table contains suggestions for funding sources that appear appropriate to the project, and worth pursuing with further staff work. Other Infrastructure Not Listed The Project Summary Table is not a comprehensive list of every infrastructure facility that may be needed over time . Additional supporting infrastructure will be needed as a function of development and redevelopment projects. For example, water, sewer, stormwater, electric, gas, communications, and other utilities are generally not identified and listed unless they present special opportunities or challenges . Also, local street improvements or other public access facilities may be needed. It is presumed that these facilities will be programmed into development projects or larger capital projects, in conjunction with abutting developers and property owners . Many of the utilities noted above would be built in association with street projects, but they are not reflected in any of the assumptions about listed projects . If any additional projects, or parts of projects, are identified in the future, they can be added to this Funding Plan. In fact, that is part of the intent of this Funding Plan -- to be a useful framework for ongoing work. 6 Table 1 - Project Summary Table North College Infrastructure Funding Plan Very High Priority G13I2010 (a) Priority is based on need for public funding and City objectives. Advance Planning Department, 221L376 da Benefits and Responsibildes are in order from direct to indimd. ESTIMATED PROJECTS PRIORITY (a) COST, 2009 OBJECTIVES MET BENEFITS & RESPONSIBILITIES b POTENTIAL FUNDING SOURCES IMPROVEMENTS TO EXISTING STREETS ► 1 N College Av - 750' from Hemlock to Conifer, street edges VH $2,700,000 ON, SFT, PED, LOS Area, City, State, Developers TIF, 2015 Citywide CIP, Developers (remainder post-BOB project) 2 N College Av - 1/2 mile from Vine to Conifer, Medians, East Side Circulators and Overlay M $1 ,600,000 IDN, SFT Area, City, State, Developers Developers, CDOT Programs, TIF, Federal Grants, Mil Levy (remainder post-BOB project) 3 N College Av - 300' Conifer to Hickory (remainder post-HIES Project) VH $1,550,000 LOS, APF, ECN, ON, PED State, City, Developers, Area TIF, 2015 Citywide CIP, Developers 4 N College Av - Conifer/Hickory intersection realignment of Conifer to meet Hickory L $6,700,000 FIX, APF City, State, Area Future City CIP 5 N College Av - 1/2 mile from Hickory to Willox, interim asphalt path H $840,000 SFT, LOS, FIN, PED Area, City, State 2015 Citywide CIP, Federal Grants, COOT Programs, Mil Levy, TIF 6 N College Av - 1/2 mile Hickory to Willox, permanent sidewalk only VH $2,100,000 SFT, LOS, PED Area, City, State 2015 City CIP, TIF, Federal Grants, COOT Programs, Mil Levy, Developers jlli 7 N College Av - 1/2 mile Hickory to Willox, street edges minus sidewalk VH $10,850,000 ON, SFT, LOS Area, City, State, Developers 2015 City CIP, TIF, Federal Grants, Mil Levy, Developers 8 N College Av - 1/2 mile from Hickory to Willox, medians and overlay M $1 ,360,000 IDN, SFT, LOS Area, City, State, Developers Future City CIP 9 N College Av - 1/4 mile from Eaton Ditch to Hwy 1 L $3,700,000 IDN, SFT, PED, LOS Area, State, City CDOT Programs, State & Federal Grants, Developers 10 Vine Dr - 1/2 mile from College to Linden M $2,800,000 LOS, IDN Area, City, Developers Developers, TIF (URA & DDA) 11 Willox Ln - 1/2 mile from Union Pacific Railroad to College L $2,760,000 LOS Area, City, Developers Developers (remainder post-Union Place development) 12 Alley upgrade - parallel east 1/4 mile from Conifer to Bristlecone L $308,000 LOS, FIN Developers, Area, City, State Developers, TIF NEW STREETS 13 Realigned Vine Or - 118 mile from College to Jerome, M $244,000 ECN, LOS, IDN Developers, Area, City Developers, TIF interim street connection for abutting development 14 Realigned Vine Or - 1/8 mile from College to Jerome, full Arterial M $3,850,000 ECN, LOS, ON Developers, Area, City Developers, TIF 15 Realigned Vine Or - new concrete intersection at North College Av L $3,816,000 City, State Future City CIP 16 Realigned Vine Or - 3/8 mile from Jerome to Redwood L $7,600,000 APF, ECN Developers, Area, City Developers 17 Redwood St - missing southern segment 600' Cajetan to "Realigned Vine" H $471 ,000 APF, LOS, FIN, ECN Developers, Area, City Developers, TIF 18 Redwood St - missing northern segment 400"'Realigned Vine" to current terminus H $314,000 LOS, APF, FIN, ECN Developers, Area, City Developers, TIF 19 Mason St - parallel west circulator 3/8 mile from Alpine to Hickory L $1 ,380,000 LOS Area, City, State Future City CIP, Developers 20 Mason St - parallel West 112 mile from Hickory to Willox M $2,100,000 ECN, IDN, LEV, LOS Developers, Area, City Developers, TIF, SID STORM DRAINAGE Part ITIE 21 NECCO - primary "backbone" section from Pond E to Vine Drive VH $6,000,000 APF, ECN Developers SID, Utilities CIP 22 NECCO - redevelopment system (upstream of Pond E) L $4,000,000 APF, ECN Developers SID, Utilities CIP 23 NCDID - west side drainage system L $6,000,000 APF, ECN Developers, Owners SID, Utilities CIP SEWER LINE 24 Sewer westside - City sewer from Alpine to Poudre Valley Plaza H $1 ,200,000 FIX, APF, LEV Owners Utilifies Maintenance Program TOTAL COST, 2009 DOLLARS NINE $74,243, Key to Acronyms LEV - Leverage, Cost Sharing, or PubliWPrivate Partnership opportunities APF - Adequate Public Facilities — Solve Obstacles to Development by Meeting Standards LOS - Level Of Service for All Transportation Modes CIP - Capital Improvements Program, e.g., the current "Building on Basics" (BOB) voter-approved sales tax referendum and City Utilities programs NCDID - Drainage Improvements Design DDA - Downtown Development Authority NECCO - Northeast College Corridor Outfall ECN - Support Economic Development PED - Pedestrian & Bike Activity FIN - Financing Feasibility, Political & Ownership Realities SFT - Safety/Hazard Elimination for All Transportation Modes FIX - Fixes A Problem in Existing Public Infrastructure SID - Special Improvement District -- Builds infrastructure funded by special assessments on property based on special benefit to the property IDN - Distinct Identity or Sense of Place, Change Public Perception TIF - Tax Increment Financing URA - Urban Renewal Authority Table 2 - Potential Funding Sources North College Infrastructure Funding Plan 12/30/2009 POTENTIAL FUNDING SOURCE FOR INITIATING FUNCTION FOR NORTH COLLEGE AREA ACTION NORTH COLLEGE AREA REVENUE ADMINISTRATION COMMENTS &elope Developer Improvements Development Project Build all infrastructure needed by the Developer City Engineering Primary source of all city infrastructure. development project. Investment Street Oversizing Program Development Project Fund oversized portion of Collector and Arterial Development City Engineering New developments city-wide pay impact fees for street costs related to growth, since they all Streets. Keep up with city-wide growth in Impact Fees contribute to city growth. Funds pay costs of building Collector and Arterial Streets, above Local traffic. Street costs. Developer Repays Development Project Allocate costs fairly, mitigate costs for the "first Developer City Engineering Requires a developer to pay for their share of typical street or utility improvements if another one in" who triggers development requirements, Investment developer or the City have previously built the improvements and filed for repayment. (First one to and gain participation by developers who develop builds needed facilities, then is eligible to be repaid the fair share from others who develop benefit. later but also benefit from the facilities.) Property Tax Increment Urban Renewal Authority (URA) Tax Increment Development Project or Assist development projects, and initiate capital Portion of URA Board (City Council No new or additional tax — captures portion of property tax resulting from increases in property Financing (TIF) URA Capital Project projects. Focus is on construction of public property taxes acting ex offcio) values. URA can facilitate, coordinate, stimulate, and leverage multiple efforts. improvements that meet objectives. collected State and Federal Transportation Gran Various grants from the Metropolitan Planning Application by City staff North College Avenue/US 287 Improvements. Various state and City Transportation Planning, City staff already collaborates actively and continuously to pursue appropriate grant funding under Organization, Colorado Department of Transportation, federal programs City Council these programs. Colorado Department of Local Affairs, Others City Sales Tax Ballot Issues e.g., current Building on Basics (BOB) Capital City Capital Public improvements that need a 'trigger" other Dedicated Sales City Council, City Manager Typical package is 1/4 cent sales tax, (25 cent sales tax per $100 sale). Yields about $40M, divided Improvements Package (city-wide) Improvements Process than development. Tax among many projects. `Dperty Tax Mil Levy General Improvement District (GID) Petition of Owners -- Enhancements and amenities, local identity, Additional GID Board (City Council acting Appropriate for projects with general, area-wide benefits. Downtown is an excellent example of use 30% or 200 of those in local matching funds for grants, demonstration Property Tax Mil ex officio) of a GID to fund beautification, pedestrian, and parking improvements. A ten-mil levy in the North district of local commitment to revitalization. Levy College area would yield about $250,000 per year, similar to downtown. This has supported funding of streetscape projects in the $1 million range. Ten mils on a $1 million property would add $2,900 tc a $25,000 tax bill. Special Assessment on Benefitting Properties Special Improvement District (SID) Petition of Owners -- Coordinate multiple owners and funding Assessment on City Council, City Engineering Assessment for improvements tailored to benefit. Can be per acre, per cubic foot of stormwater 50 0 of those in district sources to build facilities that enable later benefifting runoff, per linear foot of street or pipe, etc, as appropriate. development. properties Utilities Monthly Rates Stormwater Capital Improvement Program (CIP) City Utilities CIP Process Build "regional" facilities that serve large areas Monthly utility City Council, City Utilities Competing city-wide demands are high. Programming projects typically takes years. beyond the scope of individual developments. rates Utilities Maintenance Programs City Utilities Maintenance Maintain and replace outdated utility lines. Monthly utility City Utilities, City Council Only known project being considered at this time is sewer line serving west side of North College Program rates Avenue. Property Owners Voluntary Dedication Property Owners Allows infrastructure funding dollars to Owners equity City Real Estate Services, City West Elizabeth in Campus West is an excellent example where property owners voluntarily maximize construction of improvements that Engineering dedicated strips of land for improvements, to maximize those improvements. benefit property owners. Potential Funding Sources Table Table 2 provides additional information on potential funding sources listed on the Project Summary Table. The staff team, with input from the North College Advisory Committee, and the URA Board, identified these potential funding sources as most appropriate to the identified projects, and worthwhile to pursue . Developers (development improvements, street oversizing program, repays) The first source, development contributions, provides the primary source of all city infrastructures . For vacant properties in the North College area targeted for new development, this source has the greatest potential . Potential funding from existing development and redevelopment is more difficult to achieve . Deficiencies with existing infrastructure, which was not constructed to urban standards, may require other funding tools, along with development contributions . Urban Renewal Authority (URA) Tax Increment Financing (TIF) With the URA TIF tool in place, this revenue stream is a good tool to fund a variety of projects in the North College area. However, the North College Urban Renewal Plan area is not projected to generate tax increment revenues adequate to solely cover costs of larger capital improvement projects in the area. While this revenue source is a good funding tool, other funding partnerships and sources need to be considered in combination, in order to feasibly finance larger, high cost projects . State and Federal Transportation Grants This funding source represents various grants from the Metropolitan Planning Organization, Colorado Department of Transportation, Colorado Department of Local Affairs, and others. City Transportation staff already collaborates actively and continuously to pursue appropriate grant funding under these programs . Projects from across the state compete for these sources of funding. Capital Improvement Program — Dedicated City Sales Tax The current 2005 Capital Improvement Program, Building on Basics (BOB), provides revenue from a 1/4 cent renewal on sales tax for projects throughout the city. Included in this round of BOB , was the North College Avenue streetscape edge infrastructure improvements from Vine Drive to Conifer Street. A few of the proposed future projects identified in this Plan suggest potential future revenue funding from the next round of BOB in 2015 . Property Tax Mil Levy (General Improvement District) A General Improvement District (GID) establishes an additional property tax mil levy on properties within a designated district boundary. The GID would require a petition of owners, a minimum of thirty percent of those owners in the District, resulting in about 200 owners. This type of funding is appropriate for projects with general, area-wide benefits . Downtown is an excellent example of use of a GID to fund beautification, pedestrian, and parking improvements . A 10-mil levy for the North College area, similar to the Downtown GID, would yield about $250,000 per year as an example. A 10-mil levy on a $ 1 million property would add $2,900 to a $25 ,000 property tax bill. 9 Special Assessment of Benefiting Properties (SID) A Special Assessment District (SID) represents an assessment for improvements tailored to a specific benefit for the affected properties . For example, the property assessment could be per acre, per square foot of existing building space, per cubic foot of storm water runoff, or per linear foot of street or utility pipe, as appropriate. This revenue tool allows for coordination of multiple owners and funding sources to build facilities that enable later development. The SID requires a petition of a minimum of 50% of the affected owners in the District. It enhances the City ' s ability to provide public improvements by assessing all or part of the cost of the improvements against the properties that specifically benefit from them. Utility Rates This Funding Plan includes references to the City' s Stormwater Capital Improvements Program, and the Water Utilities Maintenance Program. These are funded through monthly rates paid by users city-wide. Property Owner Dedications This form of "funding" is actually a mechanism to eliminate costs of purchasing right-of-way for infrastructure, with affected property owners voluntarily contributing street right-of-way or utility and access easements to a given package of funding for needed improvements . This would allow infrastructure funding dollars to maximize construction of improvements that benefit the property owners . Project Location Maps The following pages contain project location maps showing groups of projects by category from the Project Summary Table. 10 North College Infrastructure Funding Plan IMPROVEMENTS TO EXISTING STREETS MAP r +` • F �+ J �].1�[ .4n n 1 F ,. Imo' r ' E VviMox Lrti 5 Y 5- • 1 w - ILL oryI # # - Y• i_7 '- S 14/ onifef t r ' ti Mill • ,` • f5 r. 4 V ne Dr ,z F1 .• 1 I , J� k y � _. _ III I •- 4 . y �. - - - �� Projects Other College Ave College Ave - inbBrim Patin College Ave (750 ft Hemlock - Conirerl (11`2 mi Hickory - Willox) (1M mi Eaton Ditch - Hwy 11 0 Water College Ave College Ave - Sidewalk Vine Dr Railroad (112 mi Vine - Conifer) 1112 mi Hickaryr - Willoxl %(112 mi College - Linden) College?HickarylCon ife r College Ave - Street Edges Mllox Ln Intersection (1J2 mi Hickory - WYllox) 10 (ill mi Union Pacific RR - College) CollegerHickorylCon ifer College Ave - Madlaaa0wadaY East Alley F-Zh�'{� Ai I ntersection (112 mi Hickory - Wi Iloxl (114 m i Conifer - Bristleconel 0ins 11 North College Infrastructure Funding Plan NEW STREETS MAP ( Tr IT �L i , i ' # '. 4 5„ 5 , 5 d r Fyn., �. Te-ns.rrT i v ,+} • ,Alf, --� z t I.; 5 -'s lr _ 5y - - Conifer: t --�- } qr m r fAL Projects Other Realigned Vine - Interim Redwood St so (I1& mi CoIle-ge - Jerome) (600 ft Cajetan - Realigned Vine) ❑ Water Realigned Vine - Full Arterial Redwood St Railroad (IM Fri College - Jerome) (400 ft Realigned Vine - Redwood ) so Realigned Vine - Intersection Mason St (118 mi College - Jerome) (318 mi Alpine - Hickory) Realigned Vine Mason St Fort` aA;ns 318 mi Jerome - Redwood ( IQ mi Hickory - Willox) 12 North College Infrastructure Funding Plan STORM DRAINAGE IMPROVEMENTS MAR NO — vic vxL E 1fillox Ln f. . .,O 0 ; . _ .. NOP 11 F ON k NO imp data - k ,� 1 1 <" r JNO •tea.. wl r I '�`' NJ NO Y O • �,. . w A ,F y wrNO IN INN Y } _ J tJv ' } IN NO i ` it NO rt rth }•," ��� • L I, ,ki k y._ yf F. k�.. ONION F - _ ON 0 lit � ,, Tti3 T ��Orr Ak Nom IN WN;r NEW I L }} +r r r ILNO _ rNO NO T NO - w +r N, NO �Omm .e, . onlf NO {`•• „ Le-_ P fit " t* . 4EON NO r NONO ita . rCOO ► p) {1h ' e E vi ' Dr ON Projects Other Northeast College Corridor Outfall (NECCQ) (Main Drainage Outfall ) f Detention Pond NECCO (Redevelopment System Upstream) o Water it YL' West Side [)rain age Systern Railroad 14r► 13 North College Infrastructure Funding Plan SEWER LINE MAP 1 r 4 .. __ . w — — y • 'r �y r r r iell ' _ r 4 w Wiilox Ln • ' lye {• . . , UL � y � { •I l � yl . _ F. - JJ��rrRR { 'yl 1 = � Ri m r � - y Y IN x I ! r IV �L . 01 WNW r I ! r Li 4Ulrll 1� Y Projects Other City Sewer (Alpine - Poudre Vly Plaza) 0 Water Utilitiy {„ '� Connection Railroad toAlns 14 Funding Scenarios for the Very High Priority Projects A few of the listed projects are shown as Very High priority. Discussion and analysis has focused on these top projects, and preliminary work has already begun on seeking funding for them. One aspect of assigning the Very High priority designation is the ability to identify a conceptual funding scenario for the project. These scenarios are to illustrate the types and magnitude of funding that could possibly accomplish the projects, to guide efforts and actions in pursuit of funding. Each funding source in the scenarios below appears potentially feasible; but none are certain at the time of this writing. Every one will require significant follow-up effort and actions by the City, URA, private citizen leadership, and property owners working cooperatively. Timing, agreements, and community support are major issues associated with each scenario . As projects become further defined, the dollar figures will change . Funding Scenario for Project 1 on Project Summary Table : North College Avenue Street Edge Improvements, Hemlock Street to Conifer Street Estimated Cost: $2 . 7 million Tax Increment Financing $2 , 7001000 TOTAL MW $2 , 700 , 000 This project will complete the North College Avenue improvements begun with the 2005 Building on Basics (BOB) voter-approved capital improvements package. This project will focus on bike lanes, curb, gutter, parkway landscaping, sidewalks, and streetscape enhancements . This scenario is simple — tax increment projections indicate that TIF is expected to become available and be appropriate to fund this project because of its priority. Also, developer contributions are another potential source of minor funding for this project and others involving North College Avenue. However, they are not listed in the scenario because the amount would be minor in the context of the project, and timing would be completely unpredictable. Developer responsibility would only involve the local street portion of missing street edge improvements , and would only become available if any properties complete the development process for redevelopment or change of use projects . 15 Funding Scenario for Project 3 on Project Summary Table : North College Avenue Complete Street Edge Improvements, Conifer Street to Hickory Street Estimated Cost: $ 1 ,260 ,000 MMM Tax Increment Financing $ 1 ,0005000 2015 Citywide Capital Improvements $5501000 Package TOTAL $ 11550 ,000 This project will complete the improvements begun by a CDOT Hazard Elimination and Safety Grant in 2011 , and will extend the North College Avenue improvements begun with the 2005 Building on Basics (BOB) voter-approved capital improvements package . It includes bike lanes, new or relocated signals, sidewalks, landscaping, driveway access, a median, paving overlay, and striping. TIF projections indicate that funding may become available and be appropriate for this project. TIF may prove adequate to fully fund the improvements ; however, the scenario includes a "placeholder" designation for possible inclusion in the next package of capital improvements which would be expected to be referred to voters in 2015 . The adequacy of TIF and possible cost sharing with a City Capital Project should be explored further, with possible adjustment of the amounts as shown. For the same reasons that the 2005 BOB package included North College Avenue improvements, extending those improvements may be justifiable in the next package, especially if the funds are leveraged by TIF . Developer contributions are another potential source of minor funding for this project and others involving North College Avenue. However, they are not listed in the scenario because the amount would be minor in the context of the project, and timing would be completely unpredictable . 16 Funding Scenario for Project 6 on Project Summary Table : North College Avenue Sidewalks, Hickory Street to Willox Lane Estimated Cost: $2 , 100 ,000 2015 Citywide Capital Improvements $ 900 , 000 Package Federal Grants $ 300 , 000 CDOT Programs $ 1001000 Property Tax Mil Levy $2001000 (General Improvement District) Tax Increment Financing $6001000 TOTAL , 100,000 This project is a six-foot wide concrete sidewalk to connect gaps in the sidewalk system in the 1/2-mile stretch of North College Avenue between Hickory Street and Willox Lane . It is broken out separately from the remainder of street edge improvements which constitute the next scenario below, as a less costly, interim alternative in the event that funding for full completion can not be found. This scenario represents partial continuation of the improvements begun with the BCC and BOB voter- approved capital projects . It would be appropriate as a possible use of TIF and a new mil levy funding district, given its priority. The safety aspect of the project is a reason to seek CDOT and federal grant dollars. Developer contributions are another potential source of minor funding for this project and others involving North College Avenue. However, they are not listed in the scenario because the amount would be minor in the context of the project, and timing would be completely unpredictable . 17 Funding Scenario Project 7 on Project Summary Table : North College Avenue Complete Street Edge Improvements, Hickory Street to Willox Lane Estimated Cost: $ 10, 850,000 Tax Increment Financing $5 ,000,000 2015 Citywide Capital Improvements Package $5 ,000,000 Property Tax Mil Levy $625 ,000 (General Improvement District) Federal Grants $2251000 TOTAL This project includes the remainder of street edge improvements needed for this stretch of North College Avenue, in the event the sidewalk project in the previous scenario is done separately in advance of this project. That sidewalk project corresponds to the same stretch of the street and ideally, the two projects would be done as one . This project includes bike lanes, curb and gutter, parkway landscaping, and streetscape enhancements . This scenario may represent a stretch of the funding sources to their limits, but it would complete the last remaining stretch of North College Avenue improvements to transform the image of the street. Developer contributions are another potential source of minor funding for this project and others involving North College Avenue. However, they are not listed in the scenario because the amount would be minor in the context of the project, and timing would be completely unpredictable . 18 Funding Scenario for Project 21 on Project Summary Table : Drainage System East Side of North College Avenue Estimated Cost: $ 6,000 ,000 Special Assessment on Benefitting TBD Properties Stormwater Capital Improvement TBD program TOTAL $ 6 , 0001000 This project is the primary "backbone" portion of a drainage system called the Northeast College Corridor Outfall (NECCO) . While the funding allocations shown in all of the conceptual funding scenarios are merely illustrative to give a sense of magnitude, TBD indicates that conceptual numbers are to be determined. City staff has begun analysis to give a better understanding of appropriate allocations based on technical calculation of benefits and responsibilities using runoff calculations from each property that would benefit. Very High Priority Projects Location Map The following map shows only the projects assigned Very High Priority, for which the funding scenarios above have been developed. 19 North College Infrastructure Funding Plan PRIORITY PROJECTS MAP ,:• - - 1h+ 1 illox � n ; ,' �^� E � Wimo�c Lrr ' r = . ' p - a . ',"',► 1 1 . a l Y;, K' � a �F ' - ti . HicAorY St Pik10 3 - • fL F. A ■ 4 ' 14 I :rryV .0p[ . ME lY f r Cr Street Improvements Stonn Drainage rnprovements Othel, College Ave Northeast College CorrUOFCutfalI NECCO) Detention (750 Ft Hemlock - Conifer) {plain Drainage DuffalQ Pond CollegelHirkoryJConifer ❑ Water Intersectian College Ave - Sidewalk Railroad h-f (V2 mi Hickory - Wiliam) College Ave - Street Edges Fort` oAins f1 !2 mi Hickory - Wilknc) 20 Funding Plan Implementation This Funding Plan will guide discussions and efforts over many years . New information and changes have been constant, and that is expected to continue . The project information in this Funding Plan, including estimated costs, timing and potential funding sources, will evolve and change as new progress is made and new information is available . Yet, this Funding Plan is important in determining a basis for identifying priority projects and potential funding for them. Below, staff has developed a general timeframe for initiating project coordination and funding scenarios for each project. For the projects listed in the one- to four-year timeframe, staff has already started certain aspects of coordination to identify conceptual design and funding components . Other projects are not as ready, or depend on development initiatives rather than staff initiatives, and are listed in longer timeframe categories. Project Funding Efforts Timeframe 1 -4 4-8 Years 8-20 Years Years Projects : Projects : Projects : 193 ,6 , 7,21 295 , 8 ,9, 10 , 13 , 14 , 17, 18 ,20,24 2,4, 8 , 10, 11 , 12 , 13 , 14, 15 , 16, 19920,22923 Follow Up Actions Coordination With Other Plans The Transportation Master Plan is in the process of being updated, along with City Plan, beginning in the fall of 2009 and projected to be completed in early 2011 . The recommendations of this Funding Plan will need to be coordinated with the update to the Transportation Capital Improvements Program. Staff will also need to coordinate with other City Capital Improvement Program efforts . Monitor Funding Plan Information As new information is available, staff will need to review and monitor updates to the Funding Plan project status and funding recommendations. Coordination with Affected Interests City and URA staff should continue to initiate and coordinate efforts among various stakeholders to identify, establish, and allocate funding. 21 22 Appendixes A . Overall Project List Map Be Individual Project Summaries loll II; III ■ • • f a f * ■ $ �.L_. . k t y + F y 1 Mgt y � r 4 ] iY1° : p r gt• r ill . . } 1. on t }. ,r 7 ' . f l in �' � "! *• ail ' f � i r_ er. . �23 InIsm I € . ' .'�5 ��' Ye LPL �i. •Ii - 4 r ' .• On nI Y _ iLA 1i a 3 t ��[[}•Y�}� I`� 1fi ]k • .". f . x. • �;p� .1 4c Imo` In . �r •.q4•. y ' 6 , r. ,,� nnIL { . . In. On v Ll t. _�=:•'`.'_'� F. f fit ' 02 .`r `— • 49 Ell � � n:la ' {tip �y i 'kmi - , , .I . . ; , �` ,,. i4. Lti mIn In il * ` - . f. 61 � L� '— `, •, �,• ;•r nin +` �' + , ''- - : Y • A�f�' 0 . 1 1�7 y•. V J . nn t - ll {f J%..;mp f a ' ., ' { 1 :1 y . Improvementsamm Street Drainage 7HAUN OF?:11Ed j& n i tGGegGoinnclDrOufflell *;main iDrairbegen T y iL Dantmtlon J on Dineliniage Syatern } Pond WWnPWZmlJdFcrnt . Redwood) y1ffbersm4lork .2 mi Coll - Lindmi al III Danigan - RoallUrLed Who) Sewer Line t : 11 # DDininclaflon 3 12 T Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project I on Project Summary Table : North College Avenue Street Edge Improvements, Hemlock Street to Conifer Street This project is an approximately 750-foot long stretch of North College Avenue improvements begun with the 2005 Building on Basics (BOB) voter-approved capital improvements package. It focuses on bike lanes, curb, gutter, parkway landscaping, sidewalks, and streetscape enhancements . This scenario is simple — tax increment projections indicate that TIF is expected to become available and be appropriate to fund this project because of its priority. Summary Table Information Benefit/ i Wi pi Very High $2 ,7009000 North College Area, City, TIF, 2015 City CIP State, Developers Criteria and Objectives ■ Distinct identity/sense of place Pedestrian and bicycle activity ■ Safety Level of service Project Location Map 5 t . .� . . j Lni — 14 �— �— He•mlxa�kr-- _ College Ave CD (750 ft Hem lock - Conifer) o W o F � Iin , . d•ef,, �r pep® e North College ltittasttuctut-e Funding Plan 1 inch- _ '; FAO fret HLPROVEAENT .S TO EXISTING STREETS A?AP Page B- 1 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 2 on Project Summary Table : North College Avenue Access Management Improvements, Vine Drive to Conifer Street This project involves a 1 /2-mile stretch of North College Avenue, together with a new parallel circulation route through properties on the east side of the roadway. It focuses on access management improvements called for in the 2000 US287/SH14 Access Management Report. Landscaped medians define left-turning movements at specified locations that offer access to a parallel street and/or drive system. The system provides new alternative access to properties that currently have uncontrolled, full-movement access which would be eliminated. Finally, the project would complete any needed overlay. Summary Table Information Sources[ riority Estimated Cost Benefit/ Funding Responsibilities Medium $ 1 ,700,000 North College Area, City, Developers, CDOT Programs, TIF , State, Developers Federal Grants, Mil Levy Criteria and Objectives ■ Distinct identity/sense of place Safety Project Location ,nif —M. ,m io.d. . _ .t a College Ave (1 /2 mi Vine - Conifer) E-Vine •Dr __ i IT e North College lrlfrastructut-e Funding Plan 1 inch = 1 $ 124 feet lAFROVEAENTS TO EXISTING STREETS AMP Page B-2 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 3 on Project Summary Table : North College Avenue Street Edge Improvements, Conifer Street to Hickory Street This project involves an approximately 300-foot stretch of North College Avenue from Conifer Street to Hickory Street. It completes the improvements begun by a CDOT Hazard Elimination and Safety Grant project done in conjunction with the 2005 Building on Basics (BOB) voter-approved capital project, and extends the street edge improvements begun with the BOB project. It focuses on bike lanes, curb and gutter, new or relocated signals, sidewalks, landscaping, driveway access, paving overlay, and striping. Project Information Benefit/ Funding Sources &rMFEstimated i Responsibi BBBBBBBBBB Very High $ 1 ,5509000 State, City, Developers , TIF, 2015 City CIP North College Area Criteria and Objectives ■ Distinct identity/sense of place Pedestrian and bike activity ■ Support economic development Level of service ■ Adequate public facilities Project Location H) Wen ' 3 N0 Bonis= a- - i•G" =fit oD '= mIL �r=Ct Humx Co lleg elHickorylConifer o = Intersection 14 W 0 e North College ltittasttuctut-e Funding Plan 1 inch 81510 fret lAPROVEAENT .S TO EXISTING STREETS AMP Page B-3 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 4 on Project Summary Table . Realignment of Conifer Street to Create New Intersection with Hickory Street This project is a long-term solution to eliminate the offset intersections of Conifer and Hickory Streets with North College Avenue. It consists of realigning Conifer Street to create a new, single intersection of Hickory, Conifer, and North College Avenue; and abandoning the current intersection at Conifer and North College Avenue. This new alignment would run through the location of the existing Palomino Motel, and also through a platted vacant parcel east of the motel. This project is most feasible if it can be combined with a redevelopment project involving the properties affected by the realignment, in order to create new property value and economic activity associated with the new street corners that would be created. The project includes a complete new stretch of arterial street, approximately 500 feet in length, and associated changes at the new intersection and the intersection to be abandoned including all street components such as curb, gutter, sidewalk, bike lanes, medians, roadway paving, striping, signals, landscaping, drainage, other utilities, and driveway access. Project Information rPriM Wstimateld Cost Responsibilities Funding Sources Low $ 6,700 ,000 City, State, North College Future City CIP Area Criteria and Objectives ■ Fixes a problem in existing public Adequate Public Facilities infrastructure Project Location Hrbdp - N is f — 4 - is Mgt m HemIdj k-St CollegelHickory /Conifer MG Intersection — 14 - - u e North College Infrastructure Funding Plan 1 inch = 850 feet IAPROVEMENTSTOEXISTING STREETS MAP Page B-4 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 5 on Project Summary Table : North College Avenue Interim Asphalt Path Connections, Hickory Street to Willox Lane This project would provide pedestrian connections across gaps in the sidewalk system in this 1 /2-mile stretch of North College Avenue. It is an alternative option to Project 6 . It involves a reduced right-of- way requirement for purchase, and fewer impacts to existing development and drainage, than permanent standard improvements . Thus is less costly, making it more feasible in the short term. Project Information or iFunding Responsibilities High $ 840,000 North College Area, City, 2015 City CIP , Federal Grants, CDOT and State Programs, Mil Levy, TIF Criteria and Objectives ■ Fixes a problem in existing public Level of service, financial feasibility infrastructure Pedestrian and bike activity ■ Safety Project Location I; C Clio WWWR _ = - Stir= i; CollegeAve - Interim Path p UJ 14 ( 1 /2 mi Hickory - Willox ) b � .son-I+�I ' = � .llilio�r-6 - p North College lnfrastnicture Funding Plan 1 inch = 311 feet HIPROVEILIFNTS TO EX/STING STREETS MAP Page B - 5 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 6 on Project Summary Table : North College Avenue Sidewalks, Hickory Street to Willox Lane This project would provide permanent, standard concrete sidewalks across gaps in the sidewalk system in this 1 /2-mile stretch of North College Avenue . It would be placed in an ultimate location per the City ' s current standard for a four-lane arterial roadway. It could be fitted into existing conditions without triggering drainage facilities or other street improvements, which could be added later. It is an alternative option to Project 5 . Project Information I ' Sources ii iilities Very High $29100,000 North College Area, City, 2015 City CIP, TIF , Federal Grants, and State CDOT Programs, Mil Levy Criteria and Objectives ■Safety Pedestrian and bike activity ■ ■ Level of service Project Location I; C ff�3; u College Ave - Sidewalks ,j 14 ( 1 /2 mi Hickory - Willox ) b Auil+l .son = p North College Inft-astnicture Funding Plan 1 inch = 311 fret HIPROVEAoFNTS TO EX/STING STREETS MAP Page B -6 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 7 on Project Summary Table : North College Avenue Street Edge Improvements, Hickory Street to Willox Lane This project focuses on street edge improvements including bike lanes, curb and gutter, parkway landscaping, and any enhanced streetscape elements consistent with goals for the area. Sidewalks are listed separately as Project 6 . Project Information 9 1� Benefit/ Mu riority Estimated Cost nding 6-P I Sourirces M Responsibilities Very High $ 101 50,000 North College Area, City, 2015 City CIP , TIF , Federal Grants, State, and Developers Mil Levy Criteria and Objectives ■ Distinct identity/sense of place ■ Safety and hazard elimination for all transportation modes ■ Pedestrian and bike activity ■ Level of service Project Location i' - � o' R ed- ter= is College Ave - Street Edges p 14 cri n ( 112 mi Hickory - Willox ) iI:T -Q. 4so a North College lntfasttuctcrre Ftitidittg Platt 1 irirh = 731 feet APRCPVEAENTS TO EX/STING STREETS 1HAP Page B-7 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 8 on Project Summary Table : North College Avenue Access Management Improvements , Hickory Street to Willox Lane This project involves a 1 /2-mile stretch of North College Avenue. It focuses on access management improvements called for in the 2000 US287/SH14 Access Management Report. The project focuses on landscaped medians to define left-turning movements at specified locations. A parallel system of streets and/or drives would provide new alternative access to properties that currently have uncontrolled, full-movement access which would be eliminated. For this stretch, the parallel system consists of Project 12 on the east side, and Project 20 on the west side. These three projects are all interrelated and would need to be coordinated together. This project would include an overlay to complete the improvement of the roadway. Project Information Benefit/ riority Estimated Cost 0 a it* Funding Sources ir po NOOOOOO Medium $ 1 ,360 ,000 City, North College Area, Future City CIP, CDOT Programs, State Developers, TIF Criteria and Objectives ■ Distinct identity/sense of place Level of service ■ Safety and hazard elimination for all transportation modes Project Location Ica x' R = ter= i; 14 3lSJ.il+lob -hal .s9.n= 't �T College Ave - Medians /Overlay ( 112 mi Hickory - WilloX ) Norlh College Infrastructure Funding Plan 1 irn=i_i = r 31 fret I&PROVEILNENTS TO EXISTING STREETS IItAF' Page B - 8 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 9 on Project Summary Table : North College Avenue Street Improvements, Larimer Weld Canal to State Highway 1 This project extends slightly less than 1 /2 mile along a stretch of North College Avenue which is not within the city limits in 2009 , nor does annexation appear imminent. This project would improve North College Avenue to a City standard as a complete street, with street edge improvements, medians, and paving overlay. Also, it includes architecturally enhanced pedestrian bridges over the canal on both sides of the existing roadway bridge . Project Information r Benefit/ Sources Responsibilities High $3 ,700 ,000 North College Area, City, CDOT Programs, State and Federal and State Grants, Developers Criteria and Objectives ■ Safety and hazard elimination for all Pedestrian and bicycle activity transportation modes Level of service ■ Distinct identity/sense of place Project Location Tarry Lake k • ountryf;ClubQd CollecgeAve 14_ ; � J��� J oNJ ( 114 mi Eaton Ditch - Hwy 1 � 1 Terrya z c rn. co 5P '11 . in ILn . Olgld 'd and - z es . W illox-LnT E -Willox 'Ln , e North College Infrastructure Funding Plan 1 inch = I1F11 '' frrt 1APROVE&ENTS TO EXIS T1W STREETS 104P Page B-9 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 10 on Project Summary Table : East Vine Drive Street Improvements, North College Avenue to Linden Street This project extends 1 /2 mile along Vine Drive from North College Avenue to Linden Street. It focuses on street improvements including street edge improvements and paving overlay. Improvements would bring to street to a City standard as a complete street, with unique adaptations to reflect goals for the area and floodway restrictions which would apply to a portion of the project. Project Information I ' Cost Benefit/ Funding Sources As Responsibilities Medium $298001000 North College Area, City, Developers, Street Oversizing, TIF and State Criteria and Objectives ■ Distinct identity/sense of place Level of service Project Location is �o Ipins St TJ l - - E Vine • Dr � F z __ Vine Dr (112 mi College - Linden) 14 J J n r IF o71l + r e North College lntrastnicture Funding Platt 1 inch = 746 feet APRi_!VEAENTS TOEX/STING STREETS IWAP Page B - 10 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 11 on Project Summary Table : Willox Lane Improvements from North College Avenue to the Union Pacific Railroad Tracks This project extends approximately 1 /2 mile west along Willox Lane from North College Avenue. The western half of this stretch is outside City Limits in 2009 . Approximately 1 /4 mile along the south side of this stretch will be improved by development. This project focuses on street edge and roadway improvements to bring the street to a City standard for Minor Arterial streets . Project Information I il iCost Funding Sources Responsibilities Low $2,7601000 North College Area, City, Developers, Street Oversizing and Developers Criteria and Objectives ■ Level of service Project Location 14 _ VJ-Will .Ln E:Willox•L-n Cp� � Ar r il�1g = LJ L cz 9 \ } Nit Willo :: Ln U ( 112 mi Union Pacific RR - College) Bris•tlemca:� e Nor-th College 1riffastnictufe Funding Platt 1 iriI-1-i = =I ' '114 frFit ANPROVEAENTS TUEXISTING STREETS NIAP Page B- 11 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 12 on Project Summary Table : Alley Upgrade, East Side of North College Avenue, Conifer Street to Bristlecone Street This project is located parallel to and approximately 200 feet east of North College Avenue . It would improve a gravel alley to a paved street to provide rear access to properties fronting on North College Avenue . It would be most feasible if done in cooperation with owners and developers interested in redevelopment of those properties. It would provide a crucial component of access management improvements to North College Avenue which constitute Project 8 . Project Information iAL i i Siri � � Low $308 , 000 North College Area, Developers, TIF, Street Oversizing Developers, City, State Criteria and Objectives ■ Level of service ■ Financial feasibility, political and ownership realities Project Location KIM Mrs _ + A 1 East Alley ' N . • is = - .rtk (1 /4 mi Conifer - Bristlecone) 14 - U!Me . f • p.i - r e North College lnfrastmcWt-e Furlditig Plan 1 irich = 1 1111-14 test I&PROVE& ENTS TOEXISTING STREETS NIAP Page B- 12 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 13 on Project Summary Table : Interim "Realigned Vine Drive" Connection from North College Avenue to Jerome Street This project is an interim local street connection that would be incorporated into any later project to complete the new "Realigned Vine Drive" as a full arterial street. It would help facilitate development on abutting properties, and would likely be triggered by such development. It would include travel lanes and street edge improvements as appropriate to function for abutting development in the interim while allowing for incorporation into a later arterial street project. It extends 660 feet from North College Avenue to Jerome Street. Project Information Funding0 Benefit/ Prior*q Estimated Cost — 1 Responsibilities Medium $ 244 , 000 Developers , North College Developers, TIF, Street Oversizing Area, City Criteria and Objectives ■Support economic development Distinct identity/sense of place ■ ■ Level of service Project Location as a� Hse•m•Ise k—fit � 1 P Cfi U z Pine•n n � m C ;-lo 14 o V, 3 f e Nor-th College lrlfrasttucture Funding Platt 1 inch = 543 feet NLAISTREETSMAP Page B- 13 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 14 on Project Summary Table : "Realigned Vine Drive" Connection from North College Avenue to Jerome Street, Full Arterial Street This project would construct a new arterial street for 660 feet from North College Avenue to Jerome Street. It is a crucial connection to provide access for significant new development envisioned on vacant land in the immediate area, and also a useful connection to the Old Town North development, which has begun development of the area as envisioned with significant infrastructure investments . This project is likely to be triggered by development. Project Information iority Estimated Cost1Sources EL Medium $3 , 8501000 Developers, North College Developers, TIF, Street Oversizing Area, City Criteria and Objectives ■ Level of service ■ Support economic development ■ Distinct identity/sense of place Project Location m d m Helmolq k-R1 01 1 P r!j U IZ Pimon } LQ co S 14 a (Id . -- e North College lnfrastnrcture Funckng Plan 1 inch = 543 feet NEW STREETS RrtAP Page B- 14 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 15 on Project Summary Table : "Realigned Vine Drive," New Concrete Intersection at North College Avenue The project consists of constructing a new concrete intersection at North College Avenue/Realigned Vine Drive, to bring the intersection to City standards . This project would need to be done as a City capital project. The benefits would involve life cycle cost effectiveness for the City and State, which are responsible for long-term maintenance of this arterial and highway intersection. Project Information 11 1 Low $3 , 8161000 City and State Developers, TIF, Street Oversizin Criteria and Objectives None of the objectives used in this Funding Plan were found to be achieved to a particular degree by this project, as compared to an asphalt intersection. The objectives for this Funding Plan are based on the vision and goals for the area; while the objectives behind concrete intersection standards are city- wide objectives for long-term cost effectiveness . Project Location H� ml� k—fit as 1 p rla— U Z Pinoen } 14 fTl e North College Infrastructure Funding Plan 1 inch = :543 feet NE141 STREETS IWAP Page B- 15 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 16 on Project Summary Table : "Realigned Vine Drive," Jerome Street to Redwood Street This project is a new arterial street extending 3/8 mile from Jerome Street to Redwood Street. It would facilitate development of abutting land, and be triggered by such development. Project Information F— Benefit/ riority Estimated Cost 6P �L Funding Sources Responsibilities Low $ 7 , 600 , 000 Developers, North College Developers, Street Oversizing Area, City Criteria and Objectives ■ Adequate public facilities ■ Support economic development Project Location a) Y _ }10 L7 t .a) r —� o00 Heem•Ib , x=m V i n e Dr =-= , 0 �v mi Jerome - Redwoa � flis o � o �z el ® O Rinom-�� prise- 000��� 14 s e North College IrlfrastnrcWt-e Fcrrlding Plan 1 inch = 604 feet NEW STREETS IWAP Page B- 16 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 17 on Project Summary Table : Redwood Street, South Segment from Cajetan Street to "Realigned Vine Drive" This project would add a segment of Redwood Street approximately 600 feet in length, as part of connecting across a gap between completed portions of Redwood Street. The project would provide a new Collector street to extend the street in a manner consistent with the previously built portions . Together with Project 18 , and in coordination with Project 16, this project would provide an important and broadly beneficial link between the North College corridor area and Downtown. Project Information Priorim Responsibilities High $471 ,000 Developers, North College Developers, Street Oversizing, TIF Area, City Criteria and Objectives ■ Adequate public facilities Level of service ■ Support economic development Financial feasibility Project Location Ir na o®' � . Rini wVin . Dr Qo 1 IF t St � ED ��Vef z 14 - } cn 'adi — E=Vine _;Dr PCX 0 L U e North College Infrastnicture Funding Platt 1 inch = 741 feet NEW STREETS MAP Page B- 17 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 18 on Project Summary Table : Redwood Street, North Segment from "Realigned Vine Drive" to Current Terminus This project would add a 400-foot segment of Redwood Street, as part of connecting across a gap between completed portions of Redwood Street. The project would provide a new Collector street to extend the street in a manner consistent with the previously built portions . Together with Project 17, and in coordination with Project 16, this project would provide an important and broadly beneficial link between the North College corridor area and Downtown. Project Information "riori rE�stimated Cost Benefit/ Funding Sources Responsibilities High $314,000 Developers, North College Developers, Street Oversizing„ TIF Area, City Criteria and Objectives ■ Adequate public facilities Level of service ■ Support economic development Financial feasibility Project Location o CU a 14 10h �- - ew Vine Dr Lain -Ipi.n St + ��f. -=� J Qd�® z 000 e North College lnfrastfucfure Ftittding Platt 1 iri &i = ? [I fret NBV STREETti MAP Page B- 18 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 19 on Project Summary Table : Improve and Extend Mason Street from Alpine Street to Hickory Street This project is a parallel circulator street on the west side of North College Avenue . About half of this project would improve an existing unpaved street between Alpine and Hemlock Streets . The remaining portion would need to be established in new right of way acquired from existing subdivided and developed properties to connect from Hemlock to Hickory Street. Project Information KTM , • i K-WITTr Vriri qDevelopers Low $482 ,000 North College Area, Future CityCIP Criteria and Objectives ■ Safety Project Location ' o II _6 LJ 14 ;; �� N •Gol geAve is 0 T ILL it L M t!a y U i a) 000 1 - - iAl - ickory) North College Infrastructure Funding Plan 1 rich = c1 r 1 fret NELb' .STREETti 14fAP Page B- 19 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 20 on Project Summary Table : Extend Mason Street from Hickory Street to Willox Lane This project is a new parallel street on the west side of North College Avenue. It provides rear access to properties fronting on North College Avenue, thus facilitating access control improvements described in Project 8 , and introduces new access and a utility corridor into rear portions of deep parcels that extend 1 /8 mile back from North College Avenue, opening up opportunities for development. A very high level of initiative and cooperation among multiple property owners would be required. Project Information Cost Benefit/ Funding Sources Responsibilities Medium $2 , 100 ,000 North College Area, City, Developers, TIF, SID and developers Criteria and Objectives ■ Leverage ■ Support economic development Level of service ■ Identity/sense of place Project Location l 01 _ b' U. _ 14 '�-l �Eoll geAve � O eu H= _ .161nsT—�•tl ��Fs�i� - t � � �,SJ.I..L1Lc North College lnfrastnicture Funding Plan 1 inch = f 1_I fret NBV tiTREETS 44 P Page B-20 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 21 on Project Summary Table : Storm Drainage Facilities — North East College Corridor Outfall — "Primary Backbone" This project is a proposed drainage outfall system south of Conifer Street, east of North College Avenue extending to a crossing of Vine Drive about 1 /3 mile east of Lemay Avenue. This project is being called the "primary backbone" portion of a larger Northeast College Corridor Outfall (NECCO) system which would cover the entire east side of North College Avenue, including areas north of Conifer Street. The project includes a detention pond on the west side of Redwood Street draining into pipes within the proposed "Realigned Vine" alignment. Large pipes would cross under Lemay Avenue and then turn south to cross under Vine Drive. This project would help facilitate development of about 370 acres of undeveloped land, much of which was removed from the Dry Creek floodway in 2004 . Such development would include the "Realigned Vine" arterial street, which is crucial to development in western portions of the Mountain Vista area, in addition to the North College area. Project Information Estimated Cost Benefit/ Funding Sources Responsibilities Very High 1 $ 6,0001000 Developers SID, Utilities CIP Criteria and Objectives ■ Adequate public facilities Support economic development Project Location m MU) komi J a� rD • n: 'if r t } —H ml • ckP Lz U _c E / z� CD Pin n St _ z an Uri r ain } NECCO ( Backbone) E VinetDr `J 14 l_ � - IF Ijill_ • Y i1 r t � e North College lnfrastnicture Funding Plan 1 inch = 1 ,4h 7 teet STORIL1DRA1NAGE11LFR0VER-ENTti IWAP Page B-21 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 22 on Project Summary Table : Storm Drainage Facilities — North East College Corridor Outfall - Upstream Redevelopment System This project is a portion of the NECCO overall project and is located north of the proposed "backbone" segment in Project 21 . This project includes a system of pipes that collect runoff and transport it to the regional stormwater quality and detention pond located in Project 21 and to the "backbone" downstream of the regional pond. This system would allow for the development of vacant lots and parcels and the redevelopment of existing developed parcels and would provide an outlet for existing developed areas . Project Information Sources6L., Benefit/ Wriority 17Estimated Cost Funding . 771 Responsibilities Low $4,000,000 Developers SID, Utilities CIP Criteria and Objectives ■ Adequate public facilities Support economic development Project Location I - _ r `ti._ - .1TTTTT - al - `1 �,� IN NECCO ( Redevelopment System Upstream ) J —Nokorni t -it m I : I °1 - -- � nif Q ",-- H mlFc;k■,St h E Pi . n S R ;� z wk1% �i tIi - _ _ 00 1� � ��T �r • �3�� �1 o M.ai n t e North College Intrastnicture Funding Plan 1 irich = 1 ,467 feet STORMDRAINAGE IAPPOVaENTS IIW Page B-22 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 23 on Project Summary Table : Storm Drainage Facilities — West Side Drainage System This project is a major new system that would support full build-out of the west side of North College Avenue . Project Information i Respo Funding' Low $ 6 , 000 , 000 Developers and Property SIDI Utilities CIP Owners Criteria and Objectives ■ Adequate public facilities Support economic development Project Location I CD La N •Col l eg a Av.e ��(_ 14 Wil lo�c- _ n d f 9p,en J - xp o NCDID (West Side Drainage System) .. Illll III G Noah College Infrastructure Funding Plan 1 inch = 1 ,034 feet STNORMDRA1NACE MPROVE&ENTs IHAP Page B-23 Appendix B North College Infrastructure Funding Plan Individual Project Description Summary Project 24 on Project Summary Table : Storm Drainage Facilities — West Side Sewer Line This project replaces an aging, deficient sewer line extending along almost the entire west side of North College Avenue, from Alpine Street to Poudre Valley Plaza Mobile Home Park. It includes construction of a new utility sewer line across both undeveloped land and existing development. Project Information Priority Estimated Cost Benefit/ Funding Sources MIIIII Responsibilities High $ 1 ,200 , 000 Property Owners , Utilities Maintenance Program Developers Criteria and Objectives ■ Fixes a problem in existing public Adequate public facilities infrastructure Level of service Project Location tau;dy C0 C. L;8-4 e - -i _ c a ui t� a N •Coll eg a ALU v.e Ilk r'f = -- et a. s pt n c :J City Sewer p ❑ (Alpine - Poudre Vly Plaza } 7�„ 7 JU ra 711 111 T North College Infrastnrctcrre Funding Plan 1 inch- = 1 , 0 ;=14 fret NEWER LJNE MP Page B -24