Loading...
HomeMy WebLinkAbout1982-115-09/07/1982-REGARDING THE INITITIATION OF PROCEEDINGS FOR THE BOARDWALK SPECIAL IMPROVEMENT DISTRICT #77, STATIN RESOLUTION 82- 115 OF THE COUNCIL OF THE CITY OF FORT COLLINS REGARDING THE INITIATION OF PROCEEDINGS FOR THE BOARDWALK SPECIAL IMPROVEMENT DISTRICT# 77 , STATING THE NATURE AND LOCATION OF THE IMPROVEMENTS TO BE MADE, DESCRIBING THE AREA TO BE ASSESSED FOR THE SAME , AND DIRECTING THE DIRECTOR OF PUBLIC WORKS TO PREPARE AND PRESENT A REPORT TO THE COUNCIL WHEREAS, the City of Fort Collins has received petitions from affected property owners in the area designated as the Boardwalk Special Improvement District #77 requesting the initiation of proceedings for the creation of the Boardwalk Special Improvement District #77 for the purpose of instal- ling certain public improvements, and WHEREAS, the Council has received the petitions, accepts the same and desires to initiate proceedings fotc the formation of the Boardwalk Special Improvement District #77 NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS Section 1 That the petitions submitted by affected property owners in the Boardwalk Special Improvement District #77 are hereby received and accepted Section 2 That the improvements to be constructed consist of street paving, a bridge, water and sewer lines and all related appurtenances Such improvements are needed in order to provide access for vehicles and pedes- trians to the properties abutting the street to be improved, and in order to provide water and sewer service to those properties also abutting the street in which said improvements are to be installed Section 3 That the location of the improvements to be made is as follows The project is intended to include construction of Boardwalk Drive ( a collector street) from College Avenue east, (following the general alignment of the existing Muddy Road) and south to connect to the existing Boardwalk Drive Further, the project would include the construction of Landings Drive from its existing terminus in the Landings, south to the inter- section with the proposed Boardwalk project Section 4 That the Director of Public Works is hereby directed to prepare and present to the Council the following a Preliminary plans and specifications of the proposed improve- ments b An estimate of the total cost of such improvements, including construction, engineering, legal and advertising costs, in- terest during construction and until assessments are made by ordinance against the properties benefited and other inci- dental costs c A map of the district to be assessed for the cost of the improvements Section 5 That a portion of the total cost of such improvements shall be paid by the City at large and not by assessments against the property in the district Section 6 That said improvement district shall be known as the Boardwalk Special Improvement District #77 Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 7th day of September, 1982 Mayor ATTEST j City Clerk CS -2-