HomeMy WebLinkAbout1985-160-09/17/1985-AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH CENTENNIAL ENGINEERING FOR THE DESIGN OF RESOLUTION 85-160
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AUTHORIZING THE CITY MANAGER TO ENTER INTO
A CONTRACT WITH CENTENNIAL ENGINEERING
FOR THE DESIGN OF THE PROSPECT ROAD BRIDGE
OVER SPRING CREEK
WHEREAS, in the 1984 the City of Fort Collins was awarded a grant from
the Federal Bridge Rehabilitation and Replacement Program for the
replacement of the Prospect Road bridge over Spring Creek; and
WHEREAS, a contract that accepts the federal funds and commits the
City's share of the funds has been approved by both the City and the State
of Colorado; and
WHEREAS, Centennial Engineering was selected through the Capital
Project Management Control System to do the design work for the Timberline
Road Project which project includes the intersection of Timberline and
Prospect and the bridge at Timberline and Spring Creek; and
WHEREAS, the Prospect Road Bridge is immediately adjacent to the
Timberline & Prospect Intersection Project; and
WHEREAS, this project is to be constructed as an extension of the
Timberline & Prospect Intersection Project; however, bid separately because
federal monies are to be contributed to the project; and
WHEREAS, Centennial Engineering is familiar with the Prospect Road
Bridge area, has completed the storm drainage report necessary to design
the new bridge and has tentatively been approved for the project by the
State Department of Highways; and
WHEREAS, design of the Prospect Road Bridge should begin as soon as
possible to ensure completion and approval by the State Department of
Highways by May of 1986 so the project would be bid by July of 1986 for
completion by late Fall of 1986; and
WHEREAS, Centennial proposes to design the bridge at a total cost of
Forty-Seven Thousand Two Hundred Twenty-Six Dollars and Twenty-Six Cents
($47,226.26) ; and
WHEREAS, monies have been appropriated and are available to pay the
twenty percent (20%) City's matching share for the Prospect Road Bridge;
and
WHEREAS, pursuant to Section 2-66 of the Code of the City of Fort
Collins, no professional services agreement in excess of Twenty Thousand
Dollars ($20,000) shall be entered into until approved by the City Council
in an open Council meeting.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that the City Manager be, and he hereby is, authorized to enter
into a professional services agreement with Centennial Engineering for the
I
design of the Prospect Road Bridge over Spring Creek, said services to be
performed by Centennial Engineering for a sum not to exceed Forty-Seven
Thousand Two Hundred and Twenty-Six Dollars and Twenty-Six Cents.
Passed and adopted at a regular meeting of the City Council held this
17th day of September, A.D. 1985.
Ma o.1P�YiM�iaw�
ATTEST:
City Clerk