HomeMy WebLinkAbout1994-098-06/21/1994-COLORADO DEPT TRANSPORTATION IGA INTERSTATE TRUCK TRAFFIC SCOPE OF SERVICE TRANSPORTATION CORRIDOR U RESOLUTION 94-98
OF THE COUNCIL OF THE CITY OF FORT COLLINS
MODIFYING THE SCOPE OF SERVICE FOR THE
TRANSPORTATION CORRIDOR PROJECT ON US 287/COLORADO 14
WHEREAS, on July 20, 1993, the Council , pursuant to Resolution 93-110,
authorized the execution of an Intergovernmental Agreement between the Colorado
Department of Transportation (CDOT) allocating funds for a Transportation
Corridor Project on US 287/Colorado 14 ("the Project") ; and
WHEREAS, work has begun on the Project, and the City has organized a "focus
group" of citizens to work with the consultant in developing the Project; and
WHEREAS, during the course of the development of the Project, it has become
apparent to the focus group, the staff and the consultant that the removal or
reduction of truck traffic on the US 287/Colorado 14 Corridor (the "Corridor")
is critical to the health, safety and welfare of the City; and
WHEREAS, the Council has determined that it is in the best interests of the
citizens of the City that an additional element of work be added to the Project
to focus on the additional goal of removing interstate truck traffic from the
Corridor; and
WHEREAS, the cost of this additional work is estimated to be in the sum of
$45,050.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT
COLLINS, COLORADO, that the Mayor be, and hereby is, authorized to execute such
documents as are necessary to amend the Scope of Work of the Project to include
additional focus on the goal of removing interstate truck traffic from the
Corridor, as said Scope of Work is described on Exhibit "A, " attached, the cost
of which additional work shall not exceed the sum of Thirty-five Thousand Fifty
Dollars ($35,050) .
Passed and adopted at a regular meeting of the uncil of the C' y of Fort
Collins held this 21st day of June, A.D. 1994
Mayor
ATTEST: pp
City Clerk �`
Exhibit "A"
V:
C ity of Fort Collins Corridor Stud o US 287 and Colorado 14
EXFHBIT A-1
US 287/SH 14
Truck Traffic Management Study Program
Scope of Services
Task 1. Identify Range of Issues
Snbtask 1.1-Conduct-InitiaLMeetings-with-Major-Stakeholders-
The study team will meet individually with the key stakeholders of this study, the City of Fort
Collins (mayor, City Council member(s), City staff), City officials from Laramie and Cheyenne,
Larimer County, the Colorado Department of Transportation and the Wyoming Department
of Transportation, the American Trucking Association, the Motor Carrier Association and
others who might be identified. The study team will interview each group to identify major
issues, concerns, physical constraints and opportunities regarding truck traffic on the study
corridor.
Subtask 1.2 Prepare Issue Paper
Following the meetings with the key stakeholders, the study team will prepare an issues paper
identifying the range of issues and determining what additional data will be needed to
investigate possible alternatives. This paper will be distributed to the City of Fort Collins for
review and will be used as the basis for determining the other stakeholders who should be
included in the study and the stategy for determining potential alternatives.
Task 2. Develop Stakeholders Group
Based on the information developed from key stakeholders of the highest level of each
organization in Task 1, a list of stakeholders or their appointed staff will be developed. The
study team will contact individuals from this list and interview those members to identify their
concerns and positions on the trucking issue and to invite them to participate in the upcoming
roundtable. Following these interviews, a position paper will be prepared summarizing the
political, physical and legal issues regarding truck traffic, other possible impacts, and the
preliminary range of alternative solutions. This position paper will be submitted to the City of
Fort Collins for review and distributed to the stakeholders group prior to the roundtable(s).
U RS
CONSULTANTS,INC
City of Fort Collins Corridor Study of US 297 and Colorado 14
Task 3. Collect and Analyze Data
This task will be conducted concurrently with Task 1 and 2 to obtain the data needed to
analyze current and future conditions and to develop potential alternatives. Such data may
include traffic information, cost and cost/benefit information from the trucking industry, noise
and vibration analysis data(to be conducted as part of the original access study contract), legal
requirements and considerations,public perception information derived from previous surveys
and the survey conducted in the original access study, etc. This information will be
summarized in written and graphic formats, as appropriate, for use in the workshops and in
contacts with the stakeholders group.
Task 4. Conduct First Roundtable
A stakeholder roundtable discussion will be organized and conducted by the study group with
the City of Fort Collins. This roundtable will be 2-4 hours in duration, conducted at a
convenient Fort Collins location, and moderated by the study team. Preparations for the
roundtable will include all necessary contacts with stakeholder participants and preparation of
materials including handouts, graphics and mailing of agenda packets. The reservation of the
workshop location and provision of refreshments will be the responsibility of the City of Fort
Collins.
The intent of the roundtable discussion is to promote the synergistic formulation of ideas and
alternatives based on a variety of opinions and background experiences. This workshop will
be the forum to review the technical data collected in Task 3, to solicit opinions on the types
and magnitudes of the isses and to discuss possible alternatives for short- and long-term
implementation. Results of this roundtable will determine the focus of further research and
alternative development.
Subtask 4.1 Prepare Preliminary Report
A summary report on the workshop procedure and findings will be prepared and distributed
to the City of Fort Collins for review. An approved version will be distributed to roundtable
participants.
Task 5. Develop Action Plan
Subtask 5.1 Determine Best Course of Action
The study team will meet with the City of Fort Collins in a "strategy session" to review the
roundtable results and to identify the future course of action for the project. The future action
will depend on the number and types of possible actions identified in the previous tasks and
U RS
CONSULTANTS.IN(
City of Fort CoWns Corridor Study of US 287 and Colorado 14
could include additional research into legal and/or physical issues, concluding that no
alternatives are feasible and conducting additional coordination with some stakeholder groups,
among others.
Subtask 5.2 Conduct Additional Research as Needed
The study team will conduct follow-up research as needed, including further investigations of
legal issues, analysis of costs/benefits of alternatives, and identification of additional policy
issues to be evaluated.
Subtask 5.3 Prepare Preliminary Report
A preliminary report will be- prepared describing the alter sstives discussed a#- he first
roundtableand discussing legal, physical and cost ramifications of each alternative. The
workshop proceedings,alternatives identified by the stakeholders group,decisions on the focus
of next efforts will also be described. The report will be distributed to the City of Fort Collins
for initial review, and modified as appropriate prior to distribution to the shareholders group.
Task 6. Reconvene Roundtable
A second roundtable discussion will be conducted to present the followup data and to review
an action plan for the potential implementation of short- and long-term alternatives. As with
the first roundtable, the study team will be responsible for organizing and conducting the
workshop, and the City of Fort Collins will be responsible for reserving the meeting location
and provision of refreshments. Meeting minutes will be taken by the study team.
Task 7. Prepare Final Report/Implementation Plan
Based on the conclusions and recommendations of the stakeholders group developed in the
second roundtable, a recommended implementation plan will be developed. This plan will be
presented to key stakeholders, including the City of Fort Collins, the Colorado Department of
Transportation and others as needed. Following this review, a final plan will be prepared and
presented to the City of Fort Collins for distribution.
Note: This scope of services correlates to the level of effort shown in Exhibit B-1. The scope of
services and fee may be amended to reflect substantive changes in the nature or direction of
the study that may be identified in Workshop No. 1 and/or the strategy session conducted in
Subtask 5.2.
URSeousucrarrs,we
K # $ # ER $ # ■ # R # \ # . § § !
! / ; N ; ; ■ ; ; 2 ; ; ; ; § } § ■ - ; ; ; & & ; # & -
. . . . . . . ■ ; - .
k �
. . - . . wee ; n �
. EE §
= 222 Cc t
` � ` ! 2
. ! k E
. k� E E *4 ƒ )
` BE 2 2 !! fk � | � ( ! \ « / )
a � . ! { f
/
! �
2 ; f£ ! ! � ' ) ! � � £ k ! ! /! ! ■